Lilydale line
Railways in Melbourne
Lilydale station southbound platform view.
X'Trapolis train at the platform of Lilydale station, the terminus of the Lilydale line.
Overview
Service typeCommuter rail
SystemMelbourne railway network
StatusOperational
LocaleMelbourne, Victoria, Australia
First service1 December 1882 (1882-12-01)
Current operator(s)Metro Trains
Former operator(s)
WebsiteOfficial website Edit this at Wikidata
Route
TerminiFlinders Street
Lilydale
Stops27 (including City Loop stations)
Distance travelled37.8 km (23.5 mi)
Average journey time59 minutes (not via City Loop)
Service frequency
  • 6–20 minutes weekdays peak
  • 30 minutes weekdays off-peak
  • 20 minutes weekend daytime
  • 30 minutes nights
  • 60 minutes early weekend mornings
  • Double frequency between Flinders Street and Ringwood in combination with Belgrave line
  • Extra services run between Flinders Street and either Blackburn or Ringwood on weekdays
Technical
Rolling stockX'Trapolis 100
Track gauge1,600 mm (5 ft 3 in)
Electrification1500 V DC overhead
Track owner(s)VicTrack

The Lilydale line is a commuter railway line in the city of Melbourne, Victoria, Australia.[1] Operated by Metro Trains Melbourne, it is the city's sixth-longest metropolitan railway line at 37.8 kilometres (23.5 mi). The line runs from Flinders Street station in central Melbourne to Lilydale station in the east, serving 27 stations via Burnley, Box Hill, Ringwood, and Croydon.[2] The line operates for approximately 19 hours a day (from approximately 5:00 am to around 12:00 am) with 24 hour service available on Friday and Saturday nights. During peak hours, headways of up to 15 minutes are operated, with services every 20–30 minutes during off-peak hours.[3] Trains on the Lilydale line run in two three-car formations of X'Trapolis 100 trainsets.[4]

Sections of the Lilydale line opened as early as 1859, with the line fully extended to Lilydale by 1882. The line was built to connect Melbourne and Ringwood with the rural towns of Croydon, Mooroolbark, and Lilydale, among others.

Since the 2010s, due to the heavily utilised infrastructure of the Lilydale line, significant improvements and upgrades have been made. Different packages of work have upgraded the corridor to replace sleepers, upgrade signalling technology, introduce new rolling stock, and remove remaining level crossings.[5]

History

19th century

The line from Richmond to Hawthorn was opened initially to a temporary terminus at Pic Nic, just short of the Yarra River, in September 1860, and to Hawthorn in April 1861. It was extended to Camberwell in April 1882, then to Lilydale in early December of that same year.[6] Duplication from East Richmond to Hawthorn occurred less than a month after the Lilydale extension opened. Soon after, the same section was converted to double-line telegraph safeworking, with the section from Hawthorn to Camberwell being converted to Staff and Ticket working.

In May 1885, Hawthorn to Camberwell was duplicated. Duplication was extended to Box Hill in December 1888.[7]

20th century

Automatic signalling was introduced in December 1907 with the conversion of the section from East Richmond to Hawthorn to semi-automatic signalling, followed by Richmond to East Richmond being converted to automatic signalling in August 1919.[8] East Richmond to Camberwell was converted in two stages, both in October 1922, and Camberwell to Canterbury the following month.[8] Electrification occurred between Flinders Street and Box Hill in December 1922 and extended to Ringwood the following month, then to Croydon in November 1925, and to Lilydale in October 1925.[8] Conversion to automatic signalling resumed in April 1927 with the conversion of Canterbury to Surrey Hills, followed by Surrey Hills to Box Hill in October 1929.

The section from Croydon to Mooroolbark was duplicated in 1957, creating a long passing loop on this otherwise single-line section beyond Ringwood.[9] The section from Mooroolbark to Lilydale remains a single track. Automatic signalling conversions resumed in July 1958 with the section from Box Hill to Blackburn, followed by Mitcham to Ringwood in September of that year, and Blackburn to Mitcham in November 1960.[10] Hawthorn to Camberwell was triplicated in December 1963, and the triplication was extended to East Camberwell in November 1964.[11] Richmond to Burnley was quadruplicated in 1966–67, and triplication was extended to Box Hill in December 1971, followed by Burnley to Hawthorn in August 1972.[12] This left a short section of double track on the upside of Richmond, but this was quadruplicated with the construction of a flyover in 1973.

Ringwood to Croydon was converted to automatic signalling in November 1973 and duplicated in June 1984. Mooroolbark to Lilydale was converted to automatic signalling in June 1985.

The new Comeng trains were introduced to the Melbourne railway system in 1981. Initially, along with the Lilydale line, they were only allowed to operate on the Alamein, Belgrave, Dandenong and Glen Waverley lines, due to the width of the trains (3.05 metres (10 ft 0 in)).[13] The Comeng trains were introduced with the intention of replacing the last of the Tait sets and the majority of the Harris sets.

21st century

A 2007 restructure of train ticketing in Melbourne involved the removal of Zone 3, with Zone 3 stations being re-classified to Zone 2.[14] This brought the cost of train fares down, improving system accessibility to the public.

Future

Level Crossing Removals

A level crossing
The level crossing at Maroondah Highway, Lilydale, prior to its 2021 removal.

The Level Crossing Removal Project has announced the removal of all nine remaining level crossings on the Lilydale line, to be completed in stages from 2016 to 2025.[15] In 2016, two level crossings were removed at Mountain Highway and Scoresby Road, Bayswater, through the rail under road method.[5] These two removals also included a rebuilt Bayswater station and upgraded stabling facilities.[16] A further two crossings were removed at Blackburn Road, Blackburn, and Heatherdale Road, Ringwood in January 2017.[17] Both of these removals involved lowering the rail line under the roads, with a rebuilt Heatherdale station built as part of the project.[17] In 2021, an additional two level crossings were removed at Manchester Rd, Mooroolbark, and Maroondah Highway, Lilydale.[18] These two removals included two new elevated stations at Mooroolbark and Lilydale.[19] Union and Mont Albert Roads have also been removed by lowering the rail line in May 2023.[20] The removals also included closing Mont Albert and Surrey Hills stations, with a new station built in-between called "Union."[21] The final two crossings to be removed will include lowering the rail line below Dublin Road in Ringwood East, with a new Ringwood East station, to be completed by 2025, and the removal of Coolstore Road in Croydon by 2025.[22] The Coolstore Road level crossing removal will also include a newly elevated Croydon station.[23] In addition, the level crossing at Cave Hill Road in Lilydale will be permanently closed by 2025.[24]

Duplication

The Network Development Plan – Metropolitan Rail, released in 2012, highlighted future upgrades for the rail corridor between Mooroolbark and Lilydale. The development plan highlighted the need for the track to be duplicated between Moroolbark and Lilydale as well as the construction of a new train maintenance facility in the Lilydale area within the next 20 years (by 2032).[25] However, this project has not remained on the planning agenda, despite the significant work conducted by the Level Crossing Removal Project in the area, which has previously undertaken duplication works.

Network and operations

Services

Services on the Lilydale line operate from approximately 5:00 am to around 12:00 daily.[26] In general, during peak hours, train frequency is ~7 minutes on the Ringwood corridor (combined with the Belgrave line) and 10–20 minutes in the AM peak on the Lilydale line, while during non-peak hours, the frequency is reduced to 20–30 minutes throughout the entire route.[3] On Friday nights and weekends, services run 24 hours a day, with 60 minute frequencies available outside of normal operating hours.[27]

Train services on the Lilydale line are also subjected to maintenance and renewal work, usually on selected Fridays and Saturdays. Shuttle bus services are provided throughout the duration of work for affected commuters.[28]

Stopping patterns

Legend: Station status

  • Premium Station: Station staffed from first to last train
  • Host Station: Usually staffed during the morning peak, however, this can vary for different stations on the network.

Legend: Stopping patterns
Some services do not operate via the City Loop

  • ●: All trains stop
  • ◐: Some services do not stop
  • |: Trains pass and do not stop
Lilydale Services[29]
Station Zone Local Ltd Express Blackburn Ringwood Mooroolbark Shuttle
Flinders Street1
Southern Cross
Flagstaff
Melbourne Central
Parliament
Richmond
East Richmond||
Burnley||
Hawthorn||
Glenferrie
Auburn||
Camberwell
East Camberwell|
Canterbury1/2|
Chatham|
Union
Box Hill2
Laburnum
Blackburn
Nunawading
Mitcham
Heatherdale
Ringwood
Ringwood East
Croydon
Mooroolbark
Lilydale

Operators

The Lilydale line has had a total of six operators since its opening in 1882. The majority of operations throughout its history have been government run: from its first service in 1882 until the 1999 privatisation of Melbourne's rail network, four different government operators have run the line.[30] These operators, Victorian Railways, the Metropolitan Transit Authority, the Public Transport Corporation and Hillside Trains, have a combined operational length of 117 years. Hillside Trains was privatised in August 1999 and later rebranded as Connex Melbourne. Metro Trains Melbourne, the current private operator, then took over the operations in 2009. Both private operators have had a combined operational period of 24 years.[31]

Past and present operators of the Lilydale line:
Operator Assumed operations Ceased operations Length of operations
Victorian Railways 1882 1983 101 years
Metropolitan Transit Authority 1983 1989 6 years
Public Transport Corporation 1989 1998 9 years
Hillside Trains (government operator) 1998 1999 1 years
Connex Melbourne 1999 2009 10 years
Metro Trains Melbourne 2009 incumbent 14 years (ongoing)

Route

Lilydale (physical track)
Overview
StatusOperational with passenger services from Flinders Street to Lilydale
Owner
LocaleMelbourne, Victoria, Australia
Termini
Continues asHealesville
Warburton
Connecting linesAll metropolitan, regional, and interstate
Former connections
Stations
  • 26 current stations
  • 1 under construction
  • 5 former stations
  • 1 former siding
Service
ServicesLilydale
History
Commenced1 December 1882 (1882-12-01)
Opened
  • Princes Bridge to Richmond on 8 February 1859 (1859-02-08)
  • To Pic-nic on 24 September 1860 (1860-09-24)
  • To Hawthorn on 13 April 1861 (1861-04-13)
  • Flinders Street to Princes Bridge on 18 December 1865 (1865-12-18)
  • To Camberwell on 3 April 1882 (1882-04-03)
  • To Lilydale on 1 December 1882 (1882-12-01)
Completed1 December 1882 (1882-12-01)
Electrified
  • Flinders Street to Box Hill on 19 December 1922 (1922-12-19)
  • To Ringwood on 30 January 1923 (1923-01-30)
  • To Croydon on 28 November 1924 (1924-11-28)
  • To Lilydale on 30 November 1925 (1925-11-30)
Technical
Line length37.8 km (23.49 mi)
Number of tracks
  • Twelve tracks: Flinders Street to Richmond
  • Four tracks: Richmond to Burnley
  • Triple track: Burnley to Box Hill
  • Double track: Box Hill to Mooroolbark
  • Single track: Mooroolbark to Lilydale
Track gauge1,600 mm (5 ft 3 in)
Electrification1500 V DC overhead
Operating speed80 km/h (50 mph) – Electric
SignallingAutomatic block signaling
Maximum incline1 in 40 (2.5%)

The Lilydale line forms a curved route from the Melbourne central business district to its terminus in Lilydale. The route is 37.8 kilometres (23.5 mi) long and predominantly double-tracked, however, between Flinders Street station and Richmond, the track widens to 12 tracks, narrowing to four tracks between Richmond and Burnley before narrowing to 3 tracks between Burnley and Box Hill. Finally, the line narrows to two tracks between Box Hill and Mooroolbark before narrowing to a single track to its terminus.[32][25] After Mooroolbark, passing loops and island platforms are present throughout the remaining track to allow trains to pass. Sections of the line have been elevated or lowered into a cutting to eliminate level crossings.[33]

The line follows the same alignment as the Alamein, Belgrave, and Glen Waverley lines, with the four services splitting onto different routes at Burnley. The Alamein, Belgrave, and Lilydale services continue till the Alamein line splits off at Camberwell, with the two services continuing together till Ringwood. After departing Ringwood station, the Lilydale line heads north, with the Belgrave line heading in an eastern direction.[34] Almost all of the rail line goes through built-up suburbs, however, the rail line becomes peri-urban towards its terminus in Lilydale.[34]

Stations

The line serves 27 stations across 37.8 kilometres (23.5 mi) of track. The stations are a mix of elevated, lowered, underground, and ground level designs. Underground stations are present only in the City Loop and in Box Hill, with the majority of elevated and lowered stations being constructed as part of level crossing removals.[35] From 2025, Ringwood East station will be lowered and Croydon station elevated as part of level crossing removal works.

Station Accessibility Opened Terrain Train connections Other connections
Flinders Street Yes—step free access 1854[36] Lowered Trams Buses
Southern Cross 1859[36] Ground level Trams Buses Coaches SkyBus
Flagstaff 1985[36] Underground Trams
Melbourne Central 1981[36] Trams Buses
Parliament 1983[36] Trams
Richmond No—steep ramp 1859[36] Elevated Trams Buses
East Richmond Yes—step free access 1860[36] Ground level
3 connections
Trams
Burnley No—steep ramp 1880[36]
Hawthorn 1881[36] Lowered
2 connections
Trams Buses
Glenferrie 1882[36] Elevated Trams
Auburn Ground level Buses
Camberwell Lowered Trams Buses
East Camberwell 1900[36] Ground level
1 connection
Canterbury 1882[36] Elevated Buses
Chatham 1927[36] Ground level
Union Yes—step free access 2023[36] Lowered Buses
Box Hill 1882[36] Underground Trams Buses Coaches
Laburnum 1958[36] Elevated Buses
Blackburn 1882[36] Ground level
Nunawading 1888[36] Lowered Buses Coaches
Mitcham 1882[36] Buses
Heatherdale 1958[36]
Ringwood 1882[36] Ground level Buses Coaches
Ringwood East No—steep ramp 1925[36] Buses
Croydon 1882[36] Buses Coaches
Mooroolbark Yes—step free access 1887[36] Elevated Buses
Lilydale 1882[36] Buses Coaches
Station histories
Station Opened[37] Closed[37] Age Notes[37]
Parliament22 January 1983 || || data-sort-value=14,967 | 40 years
Melbourne Central26 January 1981 || || data-sort-value=15,693 | 42 years
  • Formerly Museum
Flagstaff27 May 1985 || || data-sort-value=14,111 | 38 years
Southern Cross17 January 1859 || || data-sort-value=60,262 | 164 years
  • Formerly Batman's Hill
  • Formerly Spencer Street
Flinders Street12 September 1854 || || data-sort-value=61,850 | 169 years
  • Formerly Melbourne Terminus
Princes Bridge8 February 1859 || 1 October 1866 || data-sort-value=2,792 | 7 years
2 April 1879 || 30 June 1980 || data-sort-value=36,979 | 101 years
Botanic Gardens2 March 1859 || c. April 1862 || data-sort-value=1,139 | Approx. 3 years
Punt Road8 February 1859 || 12 December 1859 || data-sort-value=307 | 10 months
  • Replaced by Swan Street (200m further along line)
Richmond12 December 1859 || || data-sort-value=59,933 | 164 years
  • Formerly Swan Street
East Richmond24 September 1860 || || data-sort-value=59,646 | 163 years
  • Formerly Church Street
Burnley1 May 1880 || || data-sort-value=52,487 | 143 years
  • Formerly Burnley Street
Pic Nic24 September 1860 || 6 October 1895 || data-sort-value=12,795 | 35 years
Hawthorn13 April 1861 || || data-sort-value=59,445 | 162 years
Glenferrie3 April 1882 || || data-sort-value=51,785 | 141 years
  • Formerly Glenferrie Road
Auburn3 April 1882 || || data-sort-value=51,785 | 141 years
  • Formerly Auburn Road
Camberwell3 April 1882 || || data-sort-value=51,785 | 141 years
East Camberwell14 May 1900 || || data-sort-value=45,170 | 123 years
Canterbury1 December 1882 || || data-sort-value=51,543 | 141 years
Chatham1 April 1927 || || data-sort-value=35,352 | 96 years
Surrey Hills13 August 1883 || 17 February 2023 || data-sort-value=50,957 | 139 years
Union22 May 2023 || || data-sort-value=237 | 7 months
Mont Albert11 August 1890 || 17 February 2023 || data-sort-value=48,402 | 132 years
Box Hill1 December 1882 || || data-sort-value=51,543 | 141 years
Laburnum13 July 1958 || || data-sort-value=23,926 | 65 years
Blackburn25 December 1882 || || data-sort-value=51,519 | 141 years
Nunawading4 June 1888 || || data-sort-value=49,531 | 135 years
  • Formerly Turnstall
Mitcham25 December 1882 || || data-sort-value=51,519 | 141 years
Heatherdale7 September 1958 || || data-sort-value=23,870 | 65 years
Ringwood1 December 1882 || || data-sort-value=51,543 | 141 years
Ringwood East18 May 1925 || || data-sort-value=36,035 | 98 years
Croydon1 December 1882 || || data-sort-value=51,543 | 141 years
  • Formerly Warrandyte
Mooroolbark10 October 1887 || || data-sort-value=49,769 | 136 years
Cave Hill ? ?
Lilydale1 December 1882 || || data-sort-value=51,543 | 141 years

Infrastructure

Rolling stock

A train departing from an underground station
An X'Trapolis 100 train preparing to departing from Platform 2 at Box Hill station.

The Lilydale line uses X'Trapolis 100 electric multiple unit (EMU) trains operating in a two three-car configuration, with three doors per side on each carriage and can accommodate up to 432 seated passengers in each six car configuration.[38] The trains were originally built between 2002 and 2004, as well as between 2009 and 2020 with a total of 212 three-car sets constructed. The trains are shared with seven other metropolitan train lines and have been in service since 2003.[38]

Alongside the passenger trains, Lilydale line tracks and equipment are maintained by a fleet of engineering trains. The four types of engineering trains are: the shunting train; designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives, for track evaluation; designed for evaluating track and its condition, the overhead inspection train; designed for overhead wiring inspection, and the infrastructure evaluation carriage designed for general infrastructure evaluation.[39] Most of these trains are repurposed locomotives previously used by V/Line, Metro Trains, and the Southern Shorthaul Railroad.[39]

Accessibility

A modern elevated train station platform
The rebuilt Lilydale station features tactile boarding indicators and elevators

All stations that are new or rebuilt are fully accessible.[40] Projects improving station accessibility have included the Level Crossing Removal Project, which involves station rebuilds and upgrades, and individual station upgrade projects.[41][42] These works have made significant strides in improving network accessibility, with more than 59% of Lilydale line stations classified as fully accessible.

Signalling

The Lilydale line employs a combination of three-position signaling alongside automatic block signaling (ABS) and automatic track control (ATC) safeworking systems, wherein the former involves different signal 'blocks', while the latter encompass a variety of mechanisms for enhancing safety and control on the track.[43] Three-position signalling was first introduced on the line in 1919, with the final section of the line converted to the new type of signalling by 1985.[44] Automatic and track controls are used with the centre line between Burnley and Box Hill, and between Mooroolbark and the line's terminus in Lilydale.

References

  1. "Lilydale Line". Public Transport Victoria. Archived from the original on 7 September 2018. Retrieved 18 March 2023.
  2. "Metro's paper timetables mess". Daniel Bowen. 3 September 2017. Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  3. 1 2 "New timetable train line information – Public Transport Victoria". 1 March 2021. Archived from the original on 1 March 2021. Retrieved 18 December 2022.
  4. Carey, Adam (7 November 2014). "Trains are working better but seating not guaranteed". The Sydney Morning Herald. Archived from the original on 6 February 2023. Retrieved 6 February 2023.
  5. 1 2 Victoria’s Big Build (13 June 2022). "Goodbye Scoresby Road level crossing". Victoria’s Big Build. Archived from the original on 24 February 2023. Retrieved 24 February 2023.
  6. "OPENING OF THE LILLYDALE RAILWAY". Leader (Melbourne, Vic. : 1862 – 1918, 1935). 9 December 1882. p. 16. Retrieved 29 August 2020.
  7. "DUPLICATION OF BOX HILL RAILWAY". Camberwell and Hawthorn Advertiser. 12 September 1914. Archived from the original on 18 March 2023. Retrieved 13 March 2023.
  8. 1 2 3 "LILYDALE RAILWAY ELECTRIFICATION". Lilydale Express. 9 October 1925. Archived from the original on 18 March 2023. Retrieved 15 March 2023.
  9. "Croydon-Mooroolbark Rail Duplication Scheme Ridiculous". Lilydale Express. 5 August 1955. Archived from the original on 18 March 2023. Retrieved 15 March 2023.
  10. "ELECTRIFICATION". Argus. 21 November 1912. Archived from the original on 18 March 2023. Retrieved 15 March 2023.
  11. "DUPLICATION OF LINES". Argus. 31 March 1911. Archived from the original on 18 March 2023. Retrieved 15 March 2023.
  12. "ELECTRIC RAILWAYS". Herald. 11 April 1911. Archived from the original on 18 March 2023. Retrieved 15 March 2023.
  13. "Traffic". Newsrail. Australian Railway Historical Society. August 1981. p. 185.
  14. Moynihan, Stephen (3 March 2007). "No more Zone 3 lifts load on commuters". The Age. Archived from the original on 29 December 2022. Retrieved 29 December 2022.
  15. "Bye Bye Ringwood Level Crossings | Premier of Victoria". www.premier.vic.gov.au. Retrieved 5 August 2023.
  16. Victoria’s Big Build (21 June 2022). "Mountain Highway, Bayswater". Victoria’s Big Build. Archived from the original on 24 February 2023. Retrieved 24 February 2023.
  17. 1 2 "The level crossings at Blackburn Road and Heatherdale Road are now gone. | Premier of Victoria". www.premier.vic.gov.au. Archived from the original on 24 February 2023. Retrieved 24 February 2023.
  18. "Maroondah Highway, Lilydale | Level Crossing Removal Project". levelcrossings.vic.gov.au. Archived from the original on 25 April 2019. Retrieved 26 June 2019.
  19. "Manchester Road, Mooroolbark | Level Crossing Removal Project". levelcrossings.vic.gov.au. Archived from the original on 25 April 2019. Retrieved 26 June 2019.
  20. Victoria’s Big Build (2 February 2023). "Union Road, Surrey Hills". Victoria’s Big Build. Archived from the original on 18 February 2023. Retrieved 24 February 2023.
  21. Victoria’s Big Build (22 June 2022). "Final designs for the new Union Station and precinct". Victoria’s Big Build. Archived from the original on 24 February 2023. Retrieved 24 February 2023.
  22. Victoria’s Big Build (20 February 2023). "Dublin Road, Ringwood East". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 3 March 2023.
  23. Victoria’s Big Build (3 March 2023). "Coolstore Road, Croydon". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 3 March 2023.
  24. Victoria’s Big Build (21 June 2022). "Cave Hill Road, Lilydale". Victoria’s Big Build. Archived from the original on 20 September 2022. Retrieved 3 March 2023.
  25. 1 2 "Network development plan" (PDF). Archived (PDF) from the original on 13 April 2019. Retrieved 26 June 2019.
  26. "Lilydale Line". Public Transport Victoria. Archived from the original on 7 September 2018. Retrieved 16 March 2023.
  27. "Melbourne Weekend Night Network Train Map" (PDF). 2022. Archived (PDF) from the original on 12 January 2023. Retrieved 18 December 2022.
  28. "Where do train replacement buses come from?". ABC News. 15 November 2016. Archived from the original on 14 December 2022. Retrieved 18 December 2022.
  29. "Lilydale Line". Public Transport Victoria. Archived from the original on 18 March 2023. Retrieved 18 March 2023.
  30. "Melbourne's Rail Network to be Split" Railway Digest November 1997 page 12
  31. Cooper, Mex (25 June 2009). "New train, tram operators for Melbourne". The Age. Archived from the original on 1 January 2023. Retrieved 1 January 2023.
  32. Carey, Adam (4 June 2015). "Multimillion-dollar Richmond railway station revamp in limbo". The Age. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  33. Wong, Marcus (10 May 2021). "Level crossing removals in 1920s Melbourne". Waking up in Geelong. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  34. 1 2 Wray, Tyson. "Melbourne's train lines definitively ranked from best to worst". Time Out Melbourne. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  35. Lee, Robert S. (2007). The railways of Victoria 1854–2004. Rosemary Annable, Donald S. Garden. Carlton, Vic.: Melbourne University Publishing. ISBN 978-0-522-85134-2. OCLC 224727085. Archived from the original on 8 May 2022. Retrieved 29 December 2022.
  36. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 "What year did your railway station open? | Public Transport Users Association (Victoria, Australia)". Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  37. 1 2 3 Anderson, Rick (2010). Stopping All Stations. Clunes, Victoria: Full Parallel Productions. ISBN 978-0646543635. OCLC 671303814.
  38. 1 2 "Train-Franchise-Agreement-Vol-2-of-2" (PDF). 1 March 2014. Archived from the original on 1 March 2014. Retrieved 17 February 2023.{{cite web}}: CS1 maint: bot: original URL status unknown (link)
  39. 1 2 "NETWORK SERVICE PLAN | Addenda". 1 February 2011. Archived from the original on 7 March 2011.
  40. "Accessibility – Public Transport Ombudsman Victoria". www.ptovic.com.au. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
  41. "Left behind: the fight for accessible public transport in Victoria". the Guardian. 12 June 2022. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
  42. Victoria’s Big Build (17 October 2022). "Urban design framework". Victoria’s Big Build. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
  43. "MOOROOLBARK TO LILYDALE SINGALLING DIAGRAM No. 73/21" (PDF). Metro Trains. 11 November 2021.
  44. "National Code 3-Position Speed Signalling" (PDF). Archived (PDF) from the original on 7 February 2023. Retrieved 17 February 2023.

Further reading

  • Fiddian, Marc (1988). Commuters, Shoppers and Scholars – A History of the Melbourne – Lilydale Railway. Pakenham Gazette. ISBN 0-9596316-7-4.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.