Mukah Airport Lapangan Terbang Mukah | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Summary | |||||||||||
Airport type | Public | ||||||||||
Owner | Government of Malaysia | ||||||||||
Operator | Malaysia Airports Holdings Berhad | ||||||||||
Serves | Mukah Division, Sarawak, East Malaysia | ||||||||||
Location | Mukah, Sarawak, East Malaysia | ||||||||||
Time zone | MST (UTC+08:00) | ||||||||||
Elevation AMSL | 19.685 ft / 6 m | ||||||||||
Coordinates | 02°52′55″N 112°02′36″E / 2.88194°N 112.04333°E | ||||||||||
Map | |||||||||||
WBGK Location in East Malaysia | |||||||||||
Runways | |||||||||||
| |||||||||||
Statistics (2022) | |||||||||||
| |||||||||||
Mukah Airport (IATA: MKM[4], ICAO: WBGK) is an airport in Mukah, a town in the state of Sarawak in Malaysia.
History
Old STOLport
The old STOLport (Short Take-Off and Landing airport) was opened in 1960s and could only handle 67 passengers at one time.[5][6] The STOLport was equipped with a 1,097-meter bitumen runway. In 2020, the STOLport handled 29,011 passengers and 3,150 aircraft movements annually.[1]
The old STOLport saw its last day of operations on 16 June 2021 with the final flight departing for Miri at 1.20pm.[6]
- The terminal building, as seen in 2021.
- The interior of the terminal as seen in June 2011.
- Maswings' Twin Otter plane ready to welcome passengers in January 2021.
New airport
In April 2009, the federal government allocated RM436 million for a new airport in Mukah. As at 2020, the airport cost was revealed to be RM360 million by Deputy Chief Minister James Jemut Masing.[7] Works began in July 2017 and were scheduled for completion by August 2020.[8][9] The main contractors in this project were Ibraco Construction Sdn. Bhd. and Hock Peng Furniture & General Contractor Sdn. Bhd. Due to the Movement Control Order, the airport was expected to be operational in the second quarter of 2021, later than previously scheduled.[9]
The airport began its operation on 17 June 2021 with the first plane, MASwings’ MH3412 Twin Otter from Miri landing at 10.05am.[5] The same Twin Otter later made the first take off from the airport to Kuching at 10.25am.[10]
The RM300 million new airport is located 7km from Mukah town is built upon 285 acres (115 ha) of land area, with a 3,120 m2 (33,600 sq ft) terminal building, runway, Air Traffic Control Tower, offices, VIP Building, fire station and passenger waiting facilities. Other airport stakeholders’ offices are housed here as well, namely the Civil Aviation Authority of Malaysia (CAAM) and the Malaysian Meteorological Department (MET). This new airport is also equipped with 100 parking bays, 20 taxi parking bays, 20 motorcycle parking bays and 2 bus parking bays. The new airport can accommodate up to 264,000 passengers annually and larger aircraft if needed.[5] The airport utilizes full LED airfield ground lighting (AGL) system, making it the first fully LED monitored airport in Malaysia.[11]
- The terminal building and the traffic control tower, as seen from the taxiway.
- Roof design of the new terminal.
- Roof design of the new terminal.
- The entrance of the terminal is adorned with Sarawakian motives.
Airlines and destinations
Airlines | Destinations |
---|---|
Malaysia Airlines operated by MASwings | Bintulu, Kuching, Miri, Sibu, Tanjung Manis |
Traffic and statistics
Year | Passengers | Aircraft movements |
---|---|---|
2004 | 30,377 | 2,772 |
2005 | 31,807 | 2,846 |
2006 | 25,874 | 2,896 |
2007 | 20,908 | 2,378 |
2008 | 28,875 | 2,608 |
2009 | 34,979 | 2,932 |
2010 | 38,810 | 3,152 |
2011 | 37,450 | 3,258 |
2012 | 36,323 | 3,080 |
2013 | 34,247 | 2,996 |
2014 | 37,968 | 3,370 |
2015 | 35,935 | 3,258 |
2016 | 36,182 | 4,467 |
2017 | 37,148 | 4,234 |
2018 | 40,919 | 4,360 |
2019 | 47,557 | 4,318 |
2020 | 29,011 | 3,150 |
2021 | 17,387 | 1,694 |
2022 | 61,766 | 3,514 |
See also
References
- 1 2 3 at Malaysia Airports Holdings Berhad
- ↑ MUKAH AIRPORT at Civil Aviation Authority of Malaysia
- 1 2 "Statistic of Aviation Transport". Ministry of Transport. Retrieved 18 April 2023.
- ↑ Airport information for MKM at Great Circle Mapper.
- 1 2 3 "New Mukah Airport Opens, Replacing Previous Mukah Stolport". Malaysia Airports Berhad. 17 June 2021. Retrieved 28 June 2021.
- 1 2 John Isaac (16 June 2021). "Stolport Mukah ceases operations after more than 50 years". The New Sarawak. Retrieved 28 June 2021.
- ↑ "Works on Mukah's new RM360-million airport set for completion by January 2021". The Borneo Post. 9 August 2020. Retrieved 19 January 2021.
- ↑ at Malaysia Airports Holdings Berhad
- 1 2 Moh, Jane (23 December 2020). "Mukah Airport to be operational by second quarter of 2021". The Borneo Post. Retrieved 19 January 2021.
- ↑ "SNew Mukah Airport begins operations (VIDEO)". Malay Mail. 17 June 2021. Retrieved 28 June 2021.
- ↑ "DISCOVER THE FIRST FULLY LED MONITORED AIRPORT IN MALASYIA: MUKAH AIRPORT". OCEM Airfield Technology. Retrieved 29 June 2021.
- ↑ "Mukah STOLport" (PDF). Malaysia Airports Berhad. 10 May 2016. Retrieved 10 May 2016.