CT.05 Expressway | ||||
---|---|---|---|---|
Hanoi - Lao Cai Expressway | ||||
Đường cao tốc Hà Nội- Lào Cai | ||||
Route information | ||||
Part of AH14 | ||||
Maintained by Vietnam Expressway Corp (VEC) | ||||
Length | 265 km (165 mi) | |||
Existed | 21 September 2014–present | |||
Major junctions | ||||
East end | in Hanoi | |||
West end | at Lào Cai International Border Gate, Chinese border | |||
Location | ||||
Country | Vietnam | |||
Provinces | Hanoi, Vĩnh Phúc, Phú Thọ. Yên Bái, Lào Cai | |||
Highway system | ||||
|
The Hanoi–Lao Cai Expressway (Vietnamese: Đường cao tốc Hà Nội – Lào Cai) is an expressway in Vietnam, connecting Noi Bai near Hanoi with the northwest border town of Lào Cai, towards Kunming in China. The expressway has major importance in facilitating trade between Vietnam and China and in developing northwest Vietnam. It connects to G8011 Kaiyuan–Hekou Expressway on the Chinese side of the border.
The expressway shortened the travel time between Hanoi to Lao Cai by 3.5 hours, a 50% reduction in travel time.[1] The four-lane section has a maximum speed of 100 km/h, while the two-lane sections are limited to 80 km/h.[2]
Construction
Construction on the expressway began in 2009 with a total investment of US$1.46 billion. The Asian Development Bank provided a US$1 billion loan for development of the expressway.[3] South Korean Posco Group won 3 of the 8 bids, China's Guangxi Road & Bridge Engineering w 2 bids on and Vietnamese Vinacomex won one.[4][5][6]
When it opened on 21 September 2014, it was the longest expressway in Vietnam.[3] The Yên Bái to Lao Cai section of the route was opened as a two-lane expressway, the section between Yen Bai and Hanoi being a four lane dual carriageway.[3]
List of interchanges and features
- IC - interchange, JCT - junction, SA - service area, PA - parking area, BS - bus stop, TN - tunnel, TB - toll gate, BR - bridge
No. | Name | Dist. from Origin |
Connections | Notes | Location | ||
---|---|---|---|---|---|---|---|
Connect with Noi Bai - Bac Ninh - Ha Long Expressway ( National Route 18) | |||||||
1 | Nội Bài JCT | 0.0 | Noi Bai - Bac Ninh - Ha Long Expressway National Route 18 National Route 2 Võ Văn Kiệt road (to Hanoi Center) Nội Bài International Airport |
Hà Nội | Sóc Sơn | ||
2 | Ring Road 4 IC | 3.7 | Ring Road 4 (Hanoi) | Planned | |||
TG | Toll Gate Km6 | 6 | |||||
3 | IC.02 | 7.9 | Nguyễn Tất Thành Road | Planned | Vĩnh Phúc | Phúc Yên | |
4 | Bình Xuyên IC | 14.0 | Provincial Road 310 | Bình Xuyên | |||
SA | Phước An SA | ||||||
5 | Tam Đảo IC | 25.0 | National Route 2B | Tam Dương | |||
6 | IC.05 | 31.4 | National Route 2C | Planned | |||
BR | Phó Đáy Bridge | ↓ | Phó Đáy River crossing | Boundary Tam Dương - Lập Thạch | |||
7 | Văn Quán IC | 40.9 | Provincial Road 305C | Lập Thạch | |||
BR | Sông Lô Bridge | ↓ | Lô River crossing | Boundary Vĩnh Phúc - Phú Thọ | |||
8 | Việt Trì IC | 49.4 | Phù Đổng Road | Phú Thọ | Việt Trì | ||
9 | Phù Ninh IC | 54.9 | National Route 2 | Phù Ninh | |||
SA | Service Area Km57 | 57 | Lâm Thao | ||||
10 | Phú Thọ IC | 66.3 | Tuyên Quang – Phú Thọ and Phú Thọ – Chợ Bến HCM Road |
Phú Thọ | |||
BR | ↓ | Hanoi–Lào Cai railway crossing | Thanh Ba | ||||
BR | Hồng River Bridge | ↓ | Hồng River crossing | Boundary Thanh Ba - Cẩm Khê | |||
11 | Sai Nga IC | 81.5 | National Route 32C | Cẩm Khê | |||
12 | Hạ Hòa IC | 98.6 | National Route 70B | Vô Tranh | |||
13 | Yên Bái JCT | 114.8 | Âu Cơ Road | Yên Bái | Trấn Yên | ||
SA | Service Area Km117 | 117.5 | |||||
14 | IC.13 | 121.4 | National Route 37 | Under Construction | Yên Bái | ||
BR | Ngòi Rào Bridge | ↓ | Ngòi Rào crossing | Trấn Yên | |||
BR | Ngòi Thia Bridge | ↓ | Ngòi Thia crossing | Văn Yên | |||
15 | Mậu A JCT | 150.0 | Provincial Road 166 | Connect with Yên Bái - Hà Giang | |||
16 | IC.15 | 166.3 | Provincial Road 166 | Planned | |||
SA | Service Area Km171 | 171.5 | |||||
TN | Noi Bai - Lao Cai Expressway Tunnel | ↓ | Completed the 500m long tunnel, phase 1 | ||||
17 | Văn Bàn JCT | 199.9 | National Route 279 | Connect with Bảo Hà -Lai Châu | Lào Cai | Văn Bàn | |
BR | Nhù Bridge | ↓ | Nhù Stream crossing | Boundary Bảo Yên - Bảo Thắng | |||
18 | Phố Lu JCT | National Route 4E | Bảo Thắng | ||||
19 | Xuân Giao IC | 234.0 | National Route 4E | ||||
TG | Toll Gate Km237 | 237 | Toward Lào Cai | ||||
SA | Service Area Km237 | ||||||
TG | Toll Gate Km237 | Toward Nội Bài | |||||
20 | Cam Đường JCT | 245.0 | Bình Minh Road | Lào Cai | |||
TN | Tunnel | ↓ | Toward Lào Cai | ||||
21 | National Route 4D JCT | 256.0 | National Route 4D | ||||
22 | Kim Thành JCT | 264.4 | Khúc Thừa Dụ Road | ||||
Connect with Kaiyuan–Hekou Expressway though to Hekou - Lào Cai International Border | |||||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ↑ "Major part of Hanoi-Lao Cai highway completed". en.nhandan.org.vn. Retrieved 2021-05-10.
- ↑ VnExpress. "Expressways that burn up the road between Hanoi and northern provinces". VnExpress International – Latest news, business, travel and analysis from Vietnam. Retrieved 2021-05-10.
- 1 2 3 Briefing, Vietnam (2014-09-23). "Longest Expressway in Vietnam Opens Between Hanoi and Lao Cai". Vietnam Briefing News. Retrieved 2021-05-10.
- ↑ VIR, Vietnam Investment Review- (2015-04-06). "Vietnam reviews bid packages of South Korea's Posco after ex-CEO arrest". Vietnam Investment Review - VIR. Retrieved 2021-05-10.
- ↑ "Vinaconex E&C awarded such as main contractor of Package A8, Noi Bai Lao Cai Highway Project – VNCN E&C" (in Vietnamese). Retrieved 2021-05-10.
- ↑ "Khởi công xây dựng hai gói thầu A7, A6 Dự án đường cao tốc Nội Bài - Lào Cai".