Cinere-Jagorawi Toll Road
Cijago
Route information
Maintained by PT Trans lingkar Kita Jaya (TLKJ)
Length14.64 km (9.10 mi)
Existed2012–present
HistoryOpened since 2012, the toll road was opened in 3 phases, from 2012 to 2019 and was completely operational in 2023
Major junctions
West endLimo Interchange
Major intersections
East endCimanggis Interchange
Location
CountryIndonesia
Highway system

Cinere–Jagorawi Toll Road or Cijago Toll Road is a 14.64-kilometre (9.10 mi) toll road which extends from Cimanggis to Cinere in West Java, Indonesia.[1][2] This toll road is the part of the Jakarta Outer Ring Road 2. The toll road is connected to Jagorawi Toll Road, Depok-Antasari Toll Road and Cinere-Serpong Toll Road. Section 1 from Cisalak to Jagorawi was inaugurated on Friday, 27 January 2012,[3] which is 3.7 kilometres (2.3 mi) in length. Section 2 from Cisalak to Beji (5.5 kilometers (3.42 mi)) was opened for public on Saturday, 28 September 2019.[4] With the completion of the remaining 3.31 kilometers (2.05 mi) and 2.19 kilometers (1.36 mi) of section that spans from Beji to Cinere, the toll road was completely opened for public on Friday, 22 December 2023.[5]

Metro, long or medium distances from and to Depok can use this toll road, without passing Lenteng Agung and Pasar Minggu.[6]

Sections

The toll road is divided into three sections. All section are fully operational.

  • Section 1: extends from Jagorawi to Raya Bogor (operational)
  • Section 2: from Raya Bogor to Kukusan (operational),[7]
  • Section 3: from Kukusan to Cinere (operational).

Toll gate

ProvinceLocationkmmiExitNameDestinationsNotes
West JavaLimo, Depok Serpong–Cinere Toll Road
Limo Interchange
Beji, Depok15.29.415Kukusan Toll Gate
17.210.717Margonda Toll Gate
Sukmajaya, Depok19.912.420Cisalak Toll Gate
Cimanggis, Depok23.614.723Cimanggis Interchange
Tapos, Depok24.715.3 Cimanggis–Cibitung Toll Road
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. "Terus Dikebut, Begini Update Pembangunan Tol Cijago". Detik. Retrieved 18 September 2018.
  2. "Dibangun Sejak 2013, Seksi 2 Tol Cijago Beroperasi Bulan Depan". Detik. Retrieved 18 September 2018.
  3. "Tol Cinere- Jagorawi Seksi I Diresmikan". Tempo. 2012-01-27. Retrieved 2023-12-23.
  4. Sugianto, Danang. "Mantap! Tol Cijago Seksi II Akhirnya Dibuka". detikfinance (in Indonesian). Retrieved 2023-12-23.
  5. Indonesia, Bisnis (2023-12-23). "Ruas Tol Cijago Tersambung Penuh, Akses ke Bandara Soetta Makin Gesit!". BISNIS.com (in Indonesian). Retrieved 2023-12-23.
  6. "Sudah 81 Persen, Seksi II Tol Cijago Rampung sebelum Lebaran". Kompas. Retrieved 18 September 2018.
  7. "Tol Cijago Seksi II Akan Dibuka Fungsional Hari Ini". Bisnis. Retrieved 3 May 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.