Cengkareng-Batu Ceper-Kunciran Toll Road
Cengkareng-Batuceper-Kunciran Toll Road (CBK) Southbound KM 6+500 (20230309).jpg
Southbound Cengkareng–Batu Ceper–Kunciran Toll Road heading to Kunciran, Tangerang in 2023
Route information
Maintained by PT Jasamarga Kunciran Cengkareng (JKC)
Length14.19 km (8.82 mi)
Existed1 April 2021–present
Major junctions
North endBenda Interchange
Major intersections
South endKunciran Interchange
Location
CountryIndonesia
ProvincesBanten
Major citiesTangerang
Highway system

Cengkareng-Batu Ceper-Kunciran Toll Road is a toll road, which runs from Cengkareng to Kunciran in Greater Jakarta, Indonesia. This toll road is part of the Jakarta Outer Ring Road 2 network that will connect Soekarno-Hatta International Airport to Cilincing. The toll road will be connected to the Jakarta-Tangerang Toll Road, Kunciran-Serpong Toll Road, as well as Prof. Dr. Ir. Soedijatmo Toll Road.[1][2]

History

Cengkareng-Batu Ceper-Kunciran is 14.19 kilometers long, consisting of 4 work sections.[3][4] The four sections are, section 1 Kunciran – IC of Sultan Ageng Tirtayasa for 2.04 km, section 2 IC of Sultan Ageng Tirtayasa – on / off ramp of Benteng Betawi along 3.50 km. Then section 3 is the on / off ramp of Benteng Betawi – IC Husein Sastranegara along 6.50 km, and section 4 IC Husein Sastranegara – Benda Junction along 2.15 km. The toll road was expected to be operational by 2019.[5] The toll road was inaugurated in 1 April 2021 along with the first section of Serpong–Cinere Toll Road.[6]

Toll gates

ProvinceLocationkmmiExitNameDestinationsNotes
BantenBenda, Tangerang0.00.00Benda InterchangeNorthern terminus
2.11.32Benda Ramp
North-bound exit & South-bound entry only
2.21.4Benda Utama Toll Gate
Tangerang, Tangerang7.64.77Tanah Tinggi Toll Gate
South-bound exit & North-bound entry only
9.55.99Buaran Indah Toll Gate
South-bound entry & North-bound exit only
Pinang, Tangerang11.87.311Pinang Toll Gate
13.48.313Kunciran InterchangeSouthern terminus
14.69.1 Kunciran–Serpong Toll Road
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

References

  1. "Pembangunan JORR 2 Terus Bergerak". Kompas. Retrieved 29 September 2018.
  2. "Proyek Tol Kunciran-Bandara Soetta Ditargetkan Selesai Pertengahan 2018". Kompas. Retrieved 29 September 2018.
  3. "Jalan Tol Baru Bakal Ditambah di Jabodetabek, Ini Perkembangannya".
  4. "Tol Akses Bandara: Pemerintah Percepat Evaluasi Usulan Penambahan Ruas". Archived from the original on 2018-09-28. Retrieved 2018-09-28.
  5. "Tol Cengkareng-Kunciran Bakal Beroperasi pada 2019". Liputan 6. Retrieved 29 September 2018.
  6. "DIRESMIKAN PRESIDEN JOKOWI, 2 RUAS TOL JORR 2 JALAN TOL CENGKARENG - BATUCEPER - KUNCIRAN DAN TOL SERPONG CINERE SEKSI I" [Inaugurated by President Jokowi, 2 toll roads Cengkareng-Batuceper-Kunciran and Serpong-Cinere section 1] (in Indonesian). Badan Pengatur Jalan Tol. 1 April 2021. Retrieved 3 November 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.