Batang-Semarang Toll Road | |
---|---|
Route information | |
Part of AH2 | |
Maintained by PT Jasamarga Semarang Batang (PT Jasa Marga Tbk and PT Waskita Toll Road (Waskita Karya)) | |
Length | 75 km (47 mi) |
Existed | 2018–present |
Major junctions | |
West end | Batang |
East end | Semarang |
Location | |
Country | Indonesia |
Major cities | |
Highway system | |
Batang-Semarang Toll Road is a 75 kilometers long highway that connects Batang area with Semarang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java.[1] The toll road is operational since 2018.[2]
Sections
Until November 2017, its construction progress is at 55.7 percent.[3][4] The construction of this toll road is divided into 5 sections:
- Section I, beginning of project - East Batang (3.2 km)
- Section II, East Batang - Weleri (36.35 km)
- Section III, Weleri - Kendal (11.05 km)
- Section IV, Kendal - Kaliwungu (13.5 km)
- Section V, Kaliwungu - Krapyak (10.9 km)
Exits and Gates
Note: The number on the exits is based on the distance from the western terminus of the Jakarta-Cikampek Toll Road, while the distance numbers are based on the distance from the western terminus of this toll road only
Province | Location | km | mi | Exit | Name | Destinations | Notes |
---|---|---|---|---|---|---|---|
Central Java | Kandeman, Batang Regency | 0 | 0.0 | 348 | Kandeman Toll Gate |
| Western terminus |
Gringsing, Batang Regency | 23.96 | 14.89 | 371 | Gringsing Toll Gate |
| ||
Weleri, Kendal Regency | 36.10 | 22.43 | 384 | Weleri Toll Gate |
| ||
Pegandon, Kendal Regency | 47.04 | 29.23 | 395 | Kendal Toll Gate |
| ||
Kaliwungu, Kendal Regency | 60.40 | 37.53 | 409 | Kaliwungu Toll Gate |
| ||
Ngaliyan, Semarang | 64.88 | 40.31 | Kalikangkung Toll Gate (Main toll gate) | ||||
71.30 | 44.30 | 419 | Krapyak Interchange |
| Eastern terminus, Eastern end of Toll Road Route 1, Western end of Toll Road Route 6 | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
- ↑ Inilah Pemenang Lelang Jalan Tol Batang-Semarang
- ↑ "Tol Batang-Semarang Bisa Dilewati Arus Mudik Lebaran 2018". Retrieved 23 December 2017.
- ↑ "Jalan Tol Batang - Semarang Selesai Akhir 2018". Archived from the original on 17 April 2018. Retrieved 23 December 2017.
- ↑ "Batang and Balikpapan toll road projects accelerated". Archived from the original on 23 December 2017. Retrieved 23 December 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.