West Natick | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | 249 West Central Street Natick, Massachusetts | ||||||||||
Coordinates | 42°16′59″N 71°23′30″W / 42.2831°N 71.3918°W | ||||||||||
Line(s) | Worcester Line | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Connections | MWRTA: 11 | ||||||||||
Construction | |||||||||||
Parking | 178 spaces ($4.00 fee) | ||||||||||
Bicycle facilities | 5 spaces | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Fare zone | 4 | ||||||||||
History | |||||||||||
Opened | August 23, 1982[1] | ||||||||||
Passengers | |||||||||||
2018 | 944 (weekday average boardings)[2] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
West Natick station is a commuter rail station on the MBTA Commuter Rail Framingham/Worcester Line, located off West Central Street (MA-135) in Natick, Massachusetts. It was opened in 1982 as a park and ride station.
History
The Boston and Albany Railroad opened through Natick in September 1834.[3] In the late 1800s, Walkerville station was briefly open at Speen Street, midway between Natick Center and the modern station site.[4][5]
On August 23, 1982, the MBTA opened West Natick station to ease demand at Natick and Framingham stations.[1] The $500,000 station included a 200-space park and ride lot. [3][6] The station should have been built accessible (state accessibility laws date from the 1970s, long before the 1990 Americans with Disabilities Act), but it was not due to a budget shortfall. Accessible mini-high sections were installed around 1993.[7]
In early 2016, the mini-high accessible platforms were closed because the folding platform edges were deteriorated, risking a dangerous collapse like one that happened at North Billerica station in 2015.[8] The MBTA earmarked $4 million to replace them and brought a portable lift to the station to maintain accessibility.[9] The mini-high platforms were demolished in March 2017; new composite platforms opened that November.[8]
The adjacent Boden Lane bridge was closed on October 31, 2019, after it was damaged by brush-clearing equipment.[10] On November 5, MassDOT announced that the bridge would be permanently closed and replaced.[11] The bridge was removed in December 2019; a temporary pedestrian span opened on January 27, 2020.[12][13] Solar panels over the parking lots were added in 2021.[14]
In June 2021, the MBTA issued a $28 million design contract for a project to add a third track from Weston to Framingham, including reconstruction of the three Wellesley stations and West Natick station. The project was expected to cost around $400 million, of which rebuilding West Natick station would be $37 million, with completion in 2030.[15]
References
- 1 2 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
- ↑ Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
- 1 2 Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. pp. 21, 28. ISBN 9780685412947.
- ↑ "Natick, Sherborn". Atlas of Middlesex County, Massachusetts. George H. Walker & Co. 1875 – via WardMaps.
- ↑ "Natick". County Atlas of Middlesex Massachusetts. F.W. Beers. 1875 – via WardMaps.
- ↑ 1982 Annual Report. Massachusetts Bay Transportation Authority. 1965. p. 68 – via Internet Archive.
- ↑ Iudica, Doreen E. (August 2, 1992). "Advocates push for train access". Boston Globe – via Newspapers.com.(second page)
- 1 2 Black, Sara (December 11, 2017). "Composites enable handicap-accessible train platforms". Composites World.
- ↑ Coueignoux, Stephanie (March 21, 2016). "FOX25 Investigates wheelchair ramps boarded at Commuter Rail stations". FOX25. Retrieved April 1, 2017.
- ↑ Schwan, Henry (November 1, 2019). "No time frame for reopening of Boden Lane Bridge in Natick". Metrowest Daily News.
- ↑ "Natick: Boden Lane Bridge to Remain Closed" (Press release). Massachusetts Department of Transportation. November 5, 2019.
- ↑ McNamara, Neal (January 8, 2020). "New Boden Lane Pedestrian Bridge Arrives In Natick". Natick Patch.
- ↑ Linsky, David (January 27, 2020). "Boden Lane Bridge Update". Natick Patch.
- ↑ "2021 Annual Town Meeting: Fourth Session". Town of Natick. April 29, 2021. pp. 4, 5.
- ↑ Kelly, Maribel (June 21, 2021). "MBTA Contract No. C72PS01: Worcester Line Track and Stations Accessibility Improvements (P0261) Design and Engineering Services" (PDF). Massachusetts Bay Transportation Authority.
External links
Media related to West Natick station at Wikimedia Commons