USS S-6 (SS-111)
USS S-6 (SS-111)
History
United States
NameUSS S-6
BuilderPortsmouth Navy Yard
Laid down29 January 1918
Launched23 December 1919
Commissioned17 May 1920
Decommissioned10 April 1931
Stricken25 January 1937
General characteristics
Class and typeS-class submarine
Displacement
  • 876 long tons (890 t) surfaced
  • 1,092 long tons (1,110 t) submerged
Length231 ft (70 m)
Beam21 ft 10 in (6.65 m)
Draft13 ft 1 in (3.99 m)
Speed
  • 15 kn (17 mph; 28 km/h) surfaced
  • 11 kn (13 mph; 20 km/h) submerged
Complement38 officers and men
Armament

USS S-6 (SS-111) was a second-group (S-3 or "Government") S-class submarine of the United States Navy. Her keel was laid down on 29 January 1918 by the Portsmouth Navy Yard. She was launched on 23 December 1919 sponsored by Ms. Eleanor Westcott; and commissioned on 17 May 1920.

Following trials and outfitting, S-6 departed New London, Connecticut on 18 November 1920, and joined other S-boats of Submarine Divisions 12 and 18 (SubDivs 12 and 18) for what was to be — at that time — the longest cruise for American submarines on record. The trip — begun with a rendezvous off Portsmouth, New Hampshire — took them through the Panama Canal, to Pearl Harbor and then to Cavite, Luzon, Philippine Islands. Other submarines had operated out of Cavite prior to this, but they had been transported there on the decks of colliers.

The two submarine divisions operated from Cavite over the next three years, from 1 December 1921 – 29 October 1924. During that time, they frequently visited the Chinese ports at Shanghai, Yantai, Qinhuangdao, Qingdao, Amoy, and Wusong.

On 30 December, S-6 and SubDiv 12 arrived at Mare Island, California. They operated along the West Coast until 15 February 1927; in the Panama Canal area in March–April; then returned to New London on 3 May to operate along the New England coast. On 17 December, S-4 — another S-boat of SubDiv 12 — sank after colliding with the Coast Guard cutter Paulding off Provincetown, Massachusetts. S-6 then served as a training model to familiarize divers preparing to raise the sunken sub. S-4 was raised on 17 March 1928 and S-6 resumed normal operations with her division. She conducted winter maneuvers in the Panama Canal area in 1929-1930, but primarily operated out of New London until decommissioned on 10 April 1931, at Philadelphia, Pennsylvania. She was struck from the Naval Vessel Register on 25 January 1937.

References

This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.