CR12
Teck Ghee 德义 டெக் கீ | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Future Mass Rapid Transit (MRT) station | |||||||||||
General information | |||||||||||
Coordinates | 1°21′56″N 103°50′37″E / 1.36564°N 103.84362°E | ||||||||||
Owned by | Land Transport Authority | ||||||||||
Line(s) | |||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opening | 2030 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Teck Ghee Teck Ghee station in Singapore |
Teck Ghee MRT station is a future underground Mass Rapid Transit station on the Cross Island line located on the boundary of Ang Mo Kio and Bishan planning areas, Singapore.[1][2][3] It will be located underneath Ang Mo Kio Avenue 6, between the junctions of Ang Mo Kio Street 31 and Ang Mo Kio Avenue 1.
The station is in the vicinity of residential estates in Ang Mo Kio and Bishan North, and community amenities such as Bishan-Ang Mo Kio Park and Ang Mo Kio Secondary School.
History
On 25 January 2019, LTA announced that Teck Ghee station would be part of the proposed Cross Island line (CRL). The station will be constructed as part of Phase 1, consisting of 12 stations between Aviation Park and Bright Hill, and is expected to be completed in 2030.[4][5][6]
Contract N109A, which encompasses the design and construction of Teck Ghee station box, was awarded to Shanghai Tunnel Engineering Co (Singapore) at a sum of S$615.9 million in January 2019. Construction started in 2019, with completion in 2026. Contract N107A also includes the design and construction of a section of North South Corridor tunnel between Sin Ming Avenue and Ang Mo Kio Avenue 3, and relevant commuter facilities.[7][8] As Teck Ghee station will be superimposed with the North South Corridor and surface road, the station box will be constructed initially, and a subsequent contract will be awarded to complete the station.
Initially expected to open in 2029, the restrictions on construction works due to the COVID-19 pandemic has led to delays, and the date was pushed to 2030.[9]
References
- ↑ "Joint News Release by the Land Transport Authority (LTA) & SLA - Cross Island Line 1: New Links by 2029". Land Transport Authority. 25 January 2019.
- ↑ Tan, Christopher (25 January 2019). "First phase of Cross Island MRT line finalised; will have 12 stations". The Straits Times. Retrieved 25 January 2019.
- ↑ Yusof, Amir. "First phase of Cross Island Line to open by 2029 with 12 stations". Channel NewsAsia. Archived from the original on 5 March 2020. Retrieved 25 January 2019.
- ↑ "LTA | News Room | News Releases | Joint News Release by the Land Transport Authority (LTA) & SLA - Cross Island Line 1: New Links by 2029". 5 March 2020. Archived from the original on 5 March 2020. Retrieved 5 March 2020.
- ↑ "First phase of Cross Island MRT line finalised; will have 12 stations, Transport News & Top Stories - The Straits Times". 5 March 2020. Archived from the original on 5 March 2020. Retrieved 5 March 2020.
- ↑ "First phase of Cross Island Line to open by 2029 with 12 stations - CNA". 5 March 2020. Archived from the original on 5 March 2020. Retrieved 5 March 2020.
- ↑ "LTA | News Room | News Releases | LTA Awards Contract for North-South Corridor Tunnels between Sin Ming Avenue and Ang Mo Kio Avenue 3". 5 March 2020. Archived from the original on 5 March 2020. Retrieved 5 March 2020.
- ↑ "$615.9 million contract awarded for North-South Corridor, Transport News & Top Stories - The Straits Times". 5 March 2020. Archived from the original on 5 March 2020. Retrieved 5 March 2020.
- ↑ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Updates on Thomson East Coast Line, Jurong Region Line and Cross Island Line". Land Transport Authority. Archived from the original on 17 May 2021. Retrieved 17 May 2021.