Shenzhen–Zhongshan Bridge

深中大桥
Bridge construction site, from May 2018 till June 2021
Coordinates22°35′01″N 113°44′01″E / 22.58375°N 113.73360°E / 22.58375; 113.73360
Carries8 lanes of the G2518 Shenzhen–Cenxi Expressway
Crosses
LocalePearl River Delta
Official nameShenzhen–Zhongshan Bridge
Other name(s)Shen–Zhong Bridge
Characteristics
DesignBridge–tunnel system
Total length49.7 kilometres (30.9 mi)
Longest span1,666 metres (5,466 ft)[1]
No. of lanes4 lanes per direction
History
Construction startMay 2017 (2017-05)
Construction end2024 (2024)
Construction costUS$4.83 billion[2]
Location
Shenzhen–Zhongshan Bridge
Traditional Chinese深中大橋
Simplified Chinese深中大桥
JyutpingSam1zung1 Daai6kiu4
Hanyu PinyinShēnzhōng Dàqiáo

The Shenzhen–Zhongshan Bridge is a bridge under construction. It will connect two major cities on the Pearl River Delta (PRD) in China: the city of Shenzhen on the eastern side of the PRD, and the city of Zhongshan on the western side. It will consist of a series of bridges and tunnels, starting from Bao'an International Airport on the Shenzhen side.

The proposed 49.7 km eight-lane link is scheduled to be completed in 2024 and is expected to cost around US$4.83 billion.[2] It will be located about 27 km downriver from the Humen Bridge, the only current bridge crossing of the estuary, and some 32 km north of the new Hong Kong–Zhuhai–Macau Bridge, which links the cities of Hong Kong, Zhuhai, and Macau at the southern end of the PRD. Construction started in May 2017 with an opening date in 2024.[3]

History

Shenzhen lobbied hard in the early 2000s to be included in the Hong Kong–Zhuhai–Macau Bridge project through a proposed double-Y-shaped design with one of the extensions connecting Shenzhen to the structure, but the Government of China picked a single-Y-shaped design in 2004, leaving Shenzhen out of the project. The idea of a separate link to connect Shenzhen with Zhongshan was originally proposed in 2008, but was shelved for several years amid concerns it could jeopardize the success of a bridge between Hong Kong, Zhuhai and Macau. It was eventually included in the Guangdong government's 12th five-year plan, unveiled by Guangdong governor Huang Huahua on 9 January 2011.[4]

The project will consist of a 6.7 km tunnel starting on the Shenzhen side, and 19 bridges totaling 43 km (aggregate length); the longest continuous section of bridge is about 22.5 km, from which about 15.5 km stretches above sea.[5] There will be four lanes in each direction, with a maximum speed of 100 km/h. The bridge will join the Guangshen Expressway to the south of Shenzhen airport and the Jihe Expressway to the east of the airport on the eastern side of the delta with the Zhongjiang Expressway on the western side. It will cut travel time from Shenzhen to Zhongshan to less than 30 minutes.

Analysts from mainland China and Hong Kong found the project might draw as much as 40 percent of the potential traffic away from the Hong Kong–Zhuhai–Macau Bridge and reduce the regional dominance of Hong Kong's airport and harbor.[6]

See also

References

  1. "Shenzhong Link Lindingyang Bridge".
  2. 1 2 The Wall Street Journal: "A Hong Kong Tale of 2 Bridges", 2 May 2013. Retrieved 25 July 2013.
  3. "Chief Executive - My Blog - Laying the foundation for Shenzhen-Zhongshan Bridge yesterday and joining Hong Kong-Zhuhai-Macao Bridge together today". www.ceo.gov.hk. Retrieved 2018-05-14.
  4. South China Morning Post: "Shenzhen–Zhongshan bridge back on agenda", 25 January 2011. Retrieved 13 April 2014.
  5. measuring on satellite images
  6. South China Morning Post: "Link spanning Pearl River Delta from Shenzhen to Zhongshan approved", 8 November 2012. Retrieved 13 April 2014.