Point Tupper Generating Station
The Point Tupper Generating Station viewed from the north
Point Tupper Generating Station, Nova Scotia
CountryCanada
LocationPoint Tupper, Nova Scotia
Coordinates45°35′13″N 61°20′53″W / 45.5869°N 61.3481°W / 45.5869; -61.3481
StatusOperational
Commission date1973
Owner(s)Nova Scotia Power
Thermal power station
Primary fuelCoal,
Power generation
Nameplate capacity150 MW
External links
CommonsRelated media on Commons

The Point Tupper Generating Station is a 150 MW Canadian electrical generating station located in the community of Point Tupper in Richmond County, Nova Scotia.

A thermal generating station, Point Tupper was opened in 1973 by then-provincial Crown corporation Nova Scotia Power Corporation on Peebles Point on the Strait of Canso immediately south of the community of Point Tupper. It was originally designed to burn oil, later coal.

Oil

It was designed to burn fuel oil imported through a deep-water supertanker terminal 1 km (0.62 mi) south at Wright Point that served a recently opened oil refinery operated by Gulf Oil.

Coal

Following the closure of the Gulf Oil refinery (its onshore tanks and deepwater supertanker terminal remain in operation as a storage terminal) in the early 1980s, Nova Scotia Power converted the Point Tupper Generating Station to burn coal beginning in 1987. As part of this conversion, an electrostatic precipitator was installed which is reportedly designed to capture 99% of fly ash emissions.

Coal supply

Following the 1987 conversion to burn coal, the Point Tupper Generating Station was supplied almost exclusively with coal mined from the Sydney Coal Field by the federal Crown corporation mining company Cape Breton Development Corporation (DEVCO); the coal being delivered to Point Tupper by trains operated first by Canadian National Railway (CN) and after 1993 by the Cape Breton and Central Nova Scotia Railway (CBNS). During the late 1990s, DEVCO began experiencing production shortfalls that led to Nova Scotia Power being forced to import foreign-mined coal from the United States and South America. This coal was delivered to a pier near the Canso Causeway in Aulds Cove adjacent to an aggregate quarry operated by Martin Marietta Materials and loaded onto rail cars for delivery to the Trenton Generating Station as well as to the Point Tupper Generating Station. In fall 2001, DEVCO shut down its remaining mine in the Sydney Coal Field, forcing Nova Scotia Power to import all coal for its remaining power plants in the Sydney region; NSP purchased all the surface assets from DEVCO, including the International Pier coal terminal on Sydney Harbour which was used to supply the Lingan Generating Station and Point Aconi Generating Station, however it continued to import coal for Trenton and Point Tupper through Aulds Cove to lessen the distance coal for these plants had to travel by rail.

In 2005, Nova Scotia Power opened the Point Tupper Marine Coal Terminal adjacent to the Point Tupper Generating Station. This facility is operated for NSP by Savage Canac Corporation under a long-term contract. It has a 134 m (440 ft) long and 13.6 m (45 ft) wide docking pier located 500 m (1,600 ft) offshore in the Strait of Canso. This pier is linked to a concrete storage pad by a conveyor belt capable of moving 3000 tons of coal per hour. The facility handles coal imported for the Point Tupper Generating Station and the Trenton Generating Station; coal for Point Tupper is transferred into the plant by front end loader, whereas coal for Trenton is transferred onto rail cars and moved by trains operated by CBNS.[1]

Emissions

The plant burns coal and features a single boiler and two chimneys, the taller of which is 107 m (351 ft) high.[2] There are, however, taller structures in the area; the windmills of the Point Tupper Wind Farm, which are approximately 125 m (410 ft) feet high.[3] It consumes 400,000 tonnes of coal per year and currently generates approximately 6% of the province's electricity, while producing roughly 10.7% of the province's air pollution, including hydrochloric acid, sulphuric acid, hexachlorobenzene and mercury.[4] In 2008 the Point Tupper Generating Station created 1.05 million tons of greenhouse gases.[5]

In 2008, Nova Scotia Power installed a 'Low-NOx' combustion firing system in the Point Tupper Generating Station to reduce the plant's nitrogen oxide emissions.

Biomass

In 2011, the owners of the Point Tupper Generating Station took ownership of an adjacent wood-fired turbine, previously owned by NewPage and capable of producing 60 MW of power. At full capacity it can supply 4% of the province's energy demand, while consuming 750,000 tonnes of biomass per year, the equivalent of 50 tractor loads of wood per day. It began production at about 80 percent capacity in July 2013, using wood supplied from Nova Scotia and Quebec woodlots.[6]

References

  1. Environmental Impact Assessment registration document for Point Tupper Marine Coal Terminal
  2. "National Pollutant Release Inventory data search - Canada.ca".
  3. http://www.scotianwindfields.ca/sites/default/files/publications/dunvegan_one-pager.pdf (towers of 80m which each blade measuring 45m) link is of a different wind farm project but the towers are "about the same height"
  4. PollutionWatch.org, "Dirty Air from Power Plants Fuels Health Problems in Nova Scotia: PollutionWatch web site ranks the top air polluters in Nova Scotia", PollutionWatch.org
  5. Facility and Greenhouse Gas Emissions, Environment Canada Archived 2011-06-11 at the Wayback Machine
  6. Beswick, Aaron (31 October 2013). "Power starts in N.S.forests". Chronicle Herald. Retrieved 31 October 2013.