Periférico Norte
Line 1 of the Guadalajara urban rail system
SITEUR light rail
Periférico Norte SITEUR railway station
General information
LocationGuadalajara
Jalisco, Mexico
Coordinates20°43′52″N 103°21′08″W / 20.73111°N 103.35222°W / 20.73111; -103.35222
Line(s)1
Tracks2
Construction
Structure typeTrench
Platform levels2
Bicycle facilitiesYes
AccessibleYes
History
Opened1 September 1989 (overground station)
Rebuilt16 September 2017 (underground station)
Services
Preceding station Logo T de SITEUR Sistema de Tren Eléctrico Urbano Following station
Auditorio
Terminus
Line 1 Dermatológico
towards Periférico Sur

Periférico Norte is the second station of Line 1 of the Guadalajara light rail system from north to south, and the nineteenth in the opposite direction. This station is underground.

The station is under the intersection of the Calzada Federalismo with the North Peripheral Ring (Spanish: Anillo Periférico Norte), to which its name alludes. This station is located in a strategic area, since it connects with various bus routes that meet the demand of the municipalities of Zapopan, Guadalajara, Tonalá and Tlaquepaque.

Its logo represents a ring divided into two poles with the upper one highlighted, indicating that it is north.

History

The Periferico Norte station before being demolished.
The first underground section of Line 1, between the Periférico Norte and Auditorio stations.

Originally the Periferico Norte station was overground, but when the Line 1 expansion works began in August 2014, the station was demolished to build a more modern one under the North Peripheral Ring, along with an underpass for cars that circulate on Calzada Federalismo.[1] The new station was opened on 16 September 2017, and more than a year later, on 22 November 2018, the new terminal of Line 1 was inaugurated: the Auditorio station, located 1 km north from the Periferico Norte station.[2]

Accidents

On 26 January 2015 a collision between two trains was recorded when the driver of the vehicle T-06 was driving without due caution and care, since he had the distance and time to avoid the collision and did not brake in time. It was a mishap between trains caused by a communication error between the drivers and the dispatcher.[3]

Points of interest

Transport routes nearby

  • Periférico Norte station of Mi Macro Periférico

References

  1. El Informador (31 December 2015). "Extension of Line 1 halfway; will operate in 2017" (in Spanish). Retrieved 15 November 2016.
  2. "Abre estación Periférico Norte sólo con prepago".
  3. González, A. (16 February 2015). "Human error caused accident on Line 1 of the Guadalajara light rail system". MVS Noticias (in Spanish). Retrieved 31 May 2022.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.