Muridava | |
---|---|
Country | Romania |
Region | Black Sea |
Block | Muridava |
Offshore/onshore | offshore |
Operator | PetroCeltic |
Field history | |
Discovery | 2013 |
Start of development | 2015 |
Start of production | 2018 |
Production | |
Current production of gas | 2.8×10 6 m3/d 100×10 6 cu ft/d 1×10 9 m3/a (35×10 9 cu ft/a) |
Estimated oil in place | 11.7 million barrels (~1.60×10 6 t) |
Estimated gas in place | 4.85×10 9 m3 169×10 9 cu ft |
The Muridava license block, also known as Block EX-27, is located on the continental shelf of the Romanian Black Sea. It was awarded in October 2011 to Melrose Resources, now Petroceltic International. The total estimated resources of the Muridava block are around 169 billion cubic feet (4.85 km³), and production could yield around 100 million cubic feet/day (2.8×106m³).[1]
References
- ↑ "Annual results" (PDF). PetroCeltic. 2013-04-22. Archived from the original (PDF) on 2014-03-28. Retrieved 2013-05-11.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.