Malianwa 马连洼 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | West Yuanmingyuan Road (圆明园西路) and North Malianwa Road (马连洼北路) Haidian District, Beijing China | ||||||||||
Coordinates | 40°01′57″N 116°16′21″E / 40.032637°N 116.27252°E | ||||||||||
Operated by | Beijing MTR Metro Line 16 Corp., Ltd. | ||||||||||
Line(s) | Line 16 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | December 31, 2016 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Malianwa Location in Beijing |
Malianwa Station (simplified Chinese: 马连洼站; traditional Chinese: 馬連窪站; pinyin: Mǎliánwā Zhàn) is a station on the Line 16 of the Beijing Subway. It opened in December 2016.
Schedule
As of December 2016:[1]
Destination | First Train | Last Train | ||||
---|---|---|---|---|---|---|
Line 16 | ||||||
to Bei'anhe | 6:02 am | 11:41 pm | ||||
to Wanpingcheng | 5:34 am | 10:55 pm | ||||
Station layout
The station has an underground island platform.
Exits
There are 2 exits, lettered A and C. Exit A is accessible.
Future development
As a part of Line 13 split project, Line 13B will start from this station.[2]
References
- ↑ 京港地铁公布地铁16号线北段首末班车时间 (in Chinese). Beijing MTR Corporation Limited. 13 December 2016. Retrieved 20 December 2016.
- ↑ "施工中标候选人公示". Beijing Municipal Commission of Housing and Urban-Rural Development. 2021-04-28. Retrieved 2021-05-05.
工程名称:北京轨道交通13号线扩能提升工程土建施工14合同段 建筑规模:1站2区间(13B起点~马连洼站区间、马连洼站、马连洼站~软件园站暗挖区间
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.