MEVA Schalungs Systeme
TypeGmbH
IndustryConstruction
Founded1970 by Gerhard Dingler
HeadquartersHaiterbach, Germany
Key people
Florian F Dingler
Products Formwork Systems
Revenue130m Euro (2020)
Number of employees
about 600 (2020)
Websitewww.meva.net

MEVA Formwork Systems is a worldwide producer of formwork systems. Headquartered in Germany under the name MEVA Schalungs-System GmbH, the MEVA group has 40 subsidiaries, plants and logistics centers on 5 continents.

Business

MEVA designs, constructs, produces and markets frame formwork systems for all types of on-site concrete applications in the building industry. MEVA's product portfolio is complemented by the company's services and consulting packages for formwork users.

History

MEVA was founded in 1970 by Gerhard Dingler. The idea of developing a reusable formwork system led to the company's founding and to the development of the first frame-based, panelised formwork system with a facing integrated into a metal frame, which was named the formwork panel. These panels are produced in different sizes and can be freely combined, hence the name modular formwork system. Throughout its history, MEVA developed several innovations, some of which have become standard features in the industry.

Milestones:[1]

  • 1971 – MEVA presents the first modular panelised formwork system.
  • 1977 – MEVA invents the formwork clamp that connects panels tightly and firmly.
  • 1978 – The frame with hollow profiles and grooves is presented. It is lighter than previous frames, supports a higher fresh concrete pressure and is easier to clean as no dirt can enter the closed hollow profiles.[2]
  • 1981 – The first crane-independent formwork system for walls and slabs is marketed.
  • 1982 – MEVA's Mammut wall formwork system is the first heavy-duty system offering a fresh concrete load capacity of 97 kN/m2.
  • 1989 – MEVA develops the aluminium wall formwork system.
  • 1992 – The crane-independent MevaDec slab system offers 3 methods for all types of slabs.
  • 2000 – MEVA presents the first all-plastic facing and is the first formwork producer to use this kind of facing in all formwork systems. Contrary to wooden facing, the all-plastic facing lasts as long as the panel frame, can be cleaned with high-pressure cleaners and repaired with identical material on the construction site and delivers a consistently high-quality concrete surface. MEVA's all-plastic facing alkus [3] comes with a 7-year long-term warranty that so far has never been claimed.[4]
  • 2012 – MEVA's automatic climbing system MAC is used on sites in Europe after several years of use in Australia and the Far East.[5]
  • 2016 - MEVA Mammut XT with flexible single and two-sided anchoring without additional attachments [6]

Product and Service Portfolio

MEVA offers standard formwork systems for all types of on-site concrete applications and also designs and produces special formwork and solutions for special requirements such as irregular building geometries or surfaces without joints. MEVA offers:

Projects

MEVA formwork is used for all types of on-site concrete work on construction sites all over the world:

Architectural construction

Civil engineering construction

High-rise construction

Commercial and residential construction

Footnotes

  1. About MEVA
  2. MEVA frame profile
  3. alkus product information
  4. history of alkus - milestones
  5. MEVA Automatic Climbing MAC
  6. Mammut XT - MEVA Wall Formwork
  7. AluStar - MEVA Wall Formwork
  8. AluFix - MEVA Wall Formwork
  9. Mammut 350 - MEVA Wall Formwork
  10. Support Frame STB
  11. MEVA Circular Colum Formwork Circo
  12. MEVA Colum Formwork CaroFalt
  13. MEVA Circular Formwork Radius
  14. MevaDec Slab Formwork
  15. Sandy Guthrie, "Challenging projects", Construction Europe, Vol. 24 Issue 9, p.38, November 2013, last accessed 10 November 2015
  16. MEVA Working Platform LAB
  17. MEVA SecuritBasic
  18. MEVA Shoring Tower Space
  19. MEVA Stair Tower MTT
  20. MEVA Climbing Scaffold KLK
  21. MEVA Automatic Climbing Formwork MAC
  22. MEVA Climbing Safety System MGS
  23. MEVA Guided Climbing MGC
  24. tHis, "Wirtschaftsuniversität Wien - Einzigartige Schalungstechnische Herausforderung", tHis - Fachmagazin für erfolgreiches Bauen, last accessed 10 November 2015
  25. Concrete International Magazine (CI), November 2015 , last accessed 10 November 2015
  26. "New Football Stadium near Budapest", Contractors World International Vol. 5 No 2, p.19, last accessed 10 November 2015
  27. "New Football Stadium near Budapest", Contractors World International Vol. 5 No 2, p.19, last accessed 10 November 2015
  28. "Prison Complex: Spindle solution for window boxouts save time", MEVA References
  29. "Europe's Large Hydro Power Plant: Linthal 2015", MEVA References
  30. Sorenga Tunnel, Oslo
  31. "New Stuttgart Trade Fair Centre", MEVA References
  32. "National Statium Lia Manoliu Bucharest", Mooser Construction References, last accessed 10 November 2015
  33. "Katrine, United Kingdom", Water Technology Projects, last accessed 10 November 2015
  34. "Budapest is Looking Forward to its new Metro Line M4", MEVA References
  35. Concrete International Magazine (CI), November 2015 , last accessed 10 November 2015
  36. "The Rise and Rise of Formwork", Builder & Engineer Magazine, last access 10 November 2015
  37. "Burj Khalifa - highest building ever", MEVA References
  38. YouTube - Roche Tower, Basel
  39. "Roche Tower Basel", MEVA References
  40. "Mirax 'Federation' Tower in Moscow, Russia", MEVA References
  41. "Palais Royale", Construction World, February 2011, last accessed 10 November 2015
  42. "India's first green Building 'Palais Royale' in Mumbai", MEVA References
  43. "Meva Systems Speed up work on Dubai Tower", Gulf Construction, 1 November 2014, last accessed 10 November 2015
  44. "The Rise and Rise of Formwork", Builder & Engineer Magazine, last access 10 November 2015
  45. "178m-Skyscraper - Roche Tower Basel", MEVA References
  46. , MEVA References
  47. "The New Vienna University of Economics and Business", MEVA References
  48. "New Football Stadium near Budapest", Contractors World International Vol. 5 No 2, p.19, last accessed 10 November 2015
  49. "Enthusiastic Designs: Sports Stadium Pancho in Felcsút near Budapest", MEVA References
  50. Bjørvika Reshapes Oslo Skyline: Norway's Largest Project Ever , MEVA References
  51. "Meva helps Bam beat the clock", Gulf Construction, last accessed 10 November 2015
  52. "'City of Dreams' Hotel Tower / Zaha Hadid Architects ", archdaily, aufgerufen am 11. November 2015
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.