Line 1
 1 
Line 1 train
Overview
StatusOperational
LocaleShaoxing, Zhejiang Province, China
Termini
  • Guniangqiao
  • Fangquan
    Exhibition And Convention Center (branch, U/C)
Stations28 (main line, in operation)
6 (branch, U/C)
Service
TypeRapid transit
SystemShaoxing Metro
Operator(s)Shaoxing Metro Corporation
Rolling stock6-car Type B
History
Opened28 June 2021 (2021-06-28)[1]
Technical
Line length47.1 km (Main line, in operation)
7.3 km[2] (Branch, opening in 2024)[3]
CharacterUnderground and elevated

Line 1 of Shaoxing Metro (Chinese: 绍兴轨道交通1号线; pinyin: Shàoxīng Guǐdào Jiāotōng Yīhào Xiàn) is a metro line in Shaoxing.

Section

Main line (Keqiao section)

The section from Guniangqiao to China Textile City opened on 28 June 2021.[1] The section is 20.3 km (12.6 mi) in length with 10 stations.[1]

Main line (remaining section)

The section from China Textile City to Fangquan is 26.8 km (16.7 mi)[4] long and runs between China Textile City station in Keqiao District and Fangquan station in Yuecheng District, passing through the city center of Shaoxing with 18 stations.[2] The section opened on 29 April 2022.

Branch line (future Line 4)

The branch line will branch off at Huangjiu Town and head north for 7.3 km (4.5 mi)[4] to Exhibition And Convention Center with 6 stations.[2] The branch line will open in 2024.[3] The branch line will be part of Line 4 in future.[5]

Opening timeline

SegmentCommencementLengthStation(s)Name
Guniangqiao — China Textile City 28 June 2021[1] 20.3 km (12.6 mi)[1] 10 Main line (Keqiao section)
China Textile City — Fangquan 29 April 2022 26.8 km (16.7 mi) 18 Main line (remaining section)
Huangjiu Town — Exhibition And Convention Center 2024[3] (Under Construction) 7.3 km (4.5 mi) 6 Branch line

Stations

Main line

Station Name[6] Connections Distance
km
Location
English[6] Chinese
Guniangqiao 姑娘桥  5  (Hangzhou Metro)     Xiaoshan, Hangzhou
Yaqian 衙前    
Yangxunqiao 杨汛桥     Keqiao, Shaoxing
Qianmei 前梅    
Qianqing 钱清  Shaoxing Urban     
Xisha Road 西沙路    
Linhang Avenue 临杭大道    
Jianshui Road 鉴水路    
Yuezhou Avenue 越州大道    
China Textile City 中国轻纺城    
Mingzhu Square 明珠广场    
Guazhuhu 瓜渚湖    
Jingshui Road 镜水路     Yuecheng, Shaoxing
Huangjiu Town 黄酒小镇  1  (branch)    
Zhangshu[lower-alpha 1] 张墅    
Olympic Sports Center 奥体中心    
Meishan Square 梅山广场  2     
Fenglin 凤林    
Datan 大滩    
Railway Station 火车站  Shaoxing Urban     
City Square 城市广场    
Lu Xun Native Place 鲁迅故里    
Chengnan Avenue 城南大道    
Fenghuangshan 凤凰山    
Laojiafeng 劳家葑    
Nanchi 南池    
Qihu 栖湖    
Fangquan 芳泉    
  1. Zhangshu station is under construction.

Branch line

  • Under construction, opening in 2024[3]
Station Name[6] Connections Distance
km
Location
English[6] Chinese
Huangjiu Town 黄酒小镇  1  (main line)     Yuecheng
Shaoxing No.1 High School 绍兴一中    
Yuexiu 越秀    
Daqingsi 大庆寺    
Shaoxing North Railway Station 绍兴北站    
Exhibition And Convention Center 会展中心     Keqiao

Planned

On August 21, 2021, the government announced that there will be a merge between Shaoxing Metro Line 1 and Hangzhou Metro Line 5, changing all the stations in the main line to Line 5 of the Hangzhou's metro system.

References

  1. 1 2 3 4 5 绍兴正式进入“地铁时代” 两地“一张网”运营创全国先例. 新华网 (in Chinese). 2021-06-28. Archived from the original on 2021-06-28. Retrieved 2021-06-28.
  2. 1 2 3 地铁将开通,票价如何定?. 绍兴网 (in Chinese). 2021-06-04. Archived from the original on 2021-11-04. Retrieved 2021-06-15.
  3. 1 2 3 4 "绍兴地铁1号线主线明日开通". 2022-04-28. 目前,绍兴地铁1号线支线共5座车站中,除绍兴北站站外,其余4座车站土建工程已完工,计划至2024年底支线全线开通
  4. 1 2 绍兴地铁1号线初步设计获批复!24个站分别位于这里. 浙江新闻 (in Chinese). 2018-10-11. Archived from the original on 2019-11-04. Retrieved 2019-11-04.
  5. "绍兴市城市轨道交通第二期建设规划环评公众意见征询". 2022-01-05. Archived from the original on 2022-05-02. 4号线一期:将现有1号线支线拆分为4号线,并在此基础上向南延伸
  6. 1 2 3 4 "Shaoxing Metro Line 1". Archived from the original on 2022-02-08.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.