Interconnector
Location of Interconnector
Location
CountryUnited Kingdom. Belgium
FromBacton Gas Terminal
Passes throughNorth Sea
ToZeebrugge
General information
Typenatural gas
PartnersFluxys, Snam
OperatorInterconnector (UK) Limited
Construction started1996
Commissioned1998
Technical information
Length235 km (146 mi)
Maximum discharge25.5 billion cubic metres a year
Diameter1,016 mm (40 in)

The Interconnector is a natural gas pipeline between the United Kingdom and continental Europe. It crosses the North Sea between Bacton Gas Terminal in England and Zeebrugge in Belgium. Construction of the pipeline was completed in 1998.

It provides bi-directional transport capability to facilitate energy trading in both the UK and continental European gas markets. Gas export from the UK is termed "forward flow" and gas import to the UK is termed "reverse flow". The UK export capacity of the Interconnector is 25.5 billion cubic metres per year.[1]

Economic impact

The pipeline provides not only the physical capability to move gas from one end of the pipe to the other, it has been a key factor in the liberation of energy markets across Europe - enabling energy trading and creating economic activity in the process. Such trading can result in future production being bought and sold because of the possibility of the use of the Interconnector.

Shareholders

Interconnector is owned by Fluxys and Snam; Fluxys has direct, indirect, and joint shareholdings (with Snam), and Snam have the remainder- a 50% interest in 31.50% held jointly with Fluxys.[2]

See also

References

  1. "Interconnector". www.fluxys.com. Retrieved 9 September 2022.
  2. "Fluxys Buys Gasprom's Interconnector (UK) Stake". www.offshore-energy.biz. Retrieved 9 September 2022.

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.