Hiroden Streetcar Route 9 | |
---|---|
9 | |
Overview | |
Status | Operating |
Locale | Hiroshima, Japan |
Termini | |
Stations | 5 |
Service | |
Type | Tram |
System | Hiroden Streetcar |
Operator(s) | Hiroshima Electric Railway |
Technical | |
Line length | 1.2 km (0.75 mi) |
Hiroden Streetcar route #9 is a streetcar route operated by the Hiroshima Electric Railway. It runs between Hatchobori Station and Hakushima Station. Around five to six trips per day continue to Eba Station via the Hiroden Main Line and Hiroden Eba Line.[1]
Overview
Route | Stations | Duration | Headway |
---|---|---|---|
9 Hakushima - Hatchobori Route | 5 | 7min | 8–16 minutes [2] |
9 Hakushima - Eba Route | 18 | 37min | 5-6 trains per day |
Lines
Hiroden Streetcar route #9 runs on the Hiroden Hakushima Line. A few trips continue via the Hiroden Main Line and Hiroden Eba Line.
Stations
No. | Station | Routes | Connections |
---|---|---|---|
W5 | Hakushima | 9 | |
W4 | Katei Saibansho-mae | 9 | |
W3 | Shukkeien-mae | 9 | Shukkei-en |
W2 | Jogakuin-mae | 9 | |
W1/M7 | Hatchobori | 1 2 6 9 | Hiroden Main Line |
Only a few services continue to Eba | |||
M8 | Tate-machi | 1 2 6 9 | |
M9 | Kamiya-cho-higashi | 1 2 6 9 | |
M9 | Kamiya-cho-nishi | 2 3 6 7 9 | |
M10 | 2 3 6 7 9 | ||
M11 | Honkawa-cho | 2 3 6 7 9 | |
M12/Y1 | Tokaichi-machi | 2 3 6 7 8 9 | Hiroden Yokogawa Line |
M13 | Dobashi | 2 3 6 8 9 | Hiroden Main Line |
E1 | Funairi-machi | 6 8 9 | |
E2 | Funairi-hon-machi | 6 8 9 | |
E3 | Funairi-saiwai-cho | 6 8 9 | |
E4 | Funairi-kawaguchi-cho | 6 8 9 | |
E5 | Funairi-minami-machi | 6 8 9 | |
E6 | Eba | 6 8 9 |
References
- ↑ "Hiroden Streetcar Timetable" (PDF). Retrieved 25 June 2017.
- ↑ "Hakushima Station Timetable" (PDF). Retrieved 25 June 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.