Hengli 横沥 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Chinese name | |||||||||||
Simplified Chinese | 横沥站 | ||||||||||
Traditional Chinese | 橫瀝站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | West side of Fenghuang Dadao, Hengli Island, Nansha District, Guangzhou, Guangdong China | ||||||||||
Coordinates | 22°45′22″N 113°30′23″E / 22.756208°N 113.506311°E | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 18 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 18 02 | ||||||||||
History | |||||||||||
Opened | 28 September 2021 | ||||||||||
Services | |||||||||||
|
Hengli Station (simplified Chinese: 横沥站; traditional Chinese: 橫瀝站; pinyin: Hénglì Zhàn; Jyutping: waang4lik1 zaam6) is a station on Line 18 of the Guangzhou Metro, located underground at the west side of Fenghuang Dadao on Hengli Island in Guangzhou's Nansha District.[1][2][3] It opened on 28 September 2021.[4]
History
On 27 April 2017, construction of this station officially started.[5] On 23 October 2018, the station completed the pouring of the first base plate. On 6 January 2019, the main structure of the shield starting section at the north end of the station was capped.[6] In December 2019, the main structure of the station was capped.[7]
The station was handed over to the '3 Powers' on 12 July 2021 for territorial management and operation of the station and facilities.[8]
Station information
G | Street level | Exits A, D, E |
L1 Mezzanine |
Buffer Level | Link to exits and concourse |
L2 Concourse |
Lobby | Customer Service, Vending Machines, ATMs |
L3 Platforms |
Platform 1 | 18 towards Xiancun (Panyu Square) |
Island platform, doors will open on the left | ||
Platform 2 | 18 towards Wanqingsha (Terminus) |
Exit number | Exit location | |
---|---|---|
Exit A | Fenghuang Dadao | |
Exit D | Fenghuang Dadao | |
Exit E | Fenghuang Dadao |
Gallery
- Concourse
- Alternate platform view
References
- 1 2 "横沥". Guangzhou Metro (in Simplified Chinese). Guangzhou Metro.
- ↑ 李天研 (2021-09-16). "18号线首通段车站巡礼,这些地方将搭上时速160公里的地铁". 大洋网 (in Simplified Chinese). Archived from the original on 2022-08-21. Retrieved 2024-01-06.
- ↑ 宾红霞 (2018-08-01). "地铁18号线建设进度如何?记者实地探营横沥站". 南方网 (in Simplified Chinese). Archived from the original on 2019-09-08. Retrieved 2020-01-23.
- ↑ 谭超 (2021-09-27). "时速160公里!广州地铁十八号线首通段定于9月28日14点开通运营". 南方日报 (in Simplified Chinese). Archived from the original on 2021-09-27. Retrieved 2021-09-27.
- ↑ 帅诚 (2017-04-27). "穗地铁18号线动工 未来南沙可半小时直达广州市中心". 大公报 (in Simplified Chinese). Archived from the original on 2021-07-15. Retrieved 2024-01-06.
- ↑ "城轨公司广州18号线车站项目横沥站北端盾构始发段主体结构圆满封顶". 中铁十五局集团 (in Simplified Chinese). 2019-01-09. Archived from the original on 2023-01-01. Retrieved 2024-01-06.
- ↑ 刘俊 (2019-12-16). "地铁十八号线首座车站主体封顶". 信息时报 (in Simplified Chinese). Archived from the original on 2021-07-14. Retrieved 2024-01-06.
- ↑ 徐振天 (2021-07-13). "广州地铁十八号线首座车站移交运营调试". 羊城晚报 (in Simplified Chinese). Archived from the original on 2021-07-14. Retrieved 2024-01-06.