Golovnaya Dam | |
---|---|
Location of Golovnaya Dam in Tajikistan | |
Country | Tajikistan |
Location | Levakant, Sarband District, Khatlon Province |
Coordinates | 37°53′6.51″N 68°56′14.16″E / 37.8851417°N 68.9372667°E |
Purpose | Power, irrigation |
Status | Operational |
Opening date | 1962 |
Dam and spillways | |
Type of dam | Embankment, earth-fill |
Impounds | Vakhsh River |
Height | 32 m (105 ft) |
Reservoir | |
Total capacity | 96,000,000 m3 (78,000 acre⋅ft) |
Normal elevation | 485 m (1,591 ft) |
Operator(s) | Barqi Tojik |
Commission date | 1962-1963 |
Hydraulic head | 31 m (102 ft) |
Turbines | 3 x 35 MW, 3 x 45 MW Kaplan-type |
Installed capacity | 240 MW |
Annual generation | 900 GWh |
The Golovnaya Dam is an earth-fill embankment dam on the Vakhsh River just east of Sarband in Khatlon Province, Tajikistan. It serves to provide water to a system of irrigation canals and generate hydroelectric power. The first generator was commissioned in 1962 and the last in 1963. Between 1984 and 1989 three of the Kaplan turbines were upgraded from 35 MW to 45 MW. Two of the turbines in the 240 MW power station discharge water into a canal on the left bank of the river. Water from this canal serves to irrigate but also supplies the 29.9 MW Perepadnaya and 15.1 MW Centralnaya Hydroelectric Power Plants located further down. The reservoir has a design storage volume of 96,000,000 m3 (78,000 acre⋅ft) by an estimated 80 percent of this is now silt.[1][2][3]
References
- ↑ "Tajikistan: Power Rehabilitation Phase II" (PDF). Asian Development Bank. August 2006. Retrieved 16 January 2015.
- ↑ "Hydroelectric Plants in Tajikistan". IndustCards. Retrieved 16 January 2015.
- ↑ "Vakhsh Cascade" (in Russian). Barqi Tojik. Archived from the original on 2015-01-18. Retrieved 16 January 2015.