Genesee Generating Station
Genesee Generating Station in 2020
Country
  • Canada
LocationGenesee, Alberta
Coordinates53°20′35″N 114°18′11″W / 53.343°N 114.303°W / 53.343; -114.303
StatusOperational
Commission date1989 (G2), 1994 (G1), 2005 (G3)
Owner(s)Capital Power
Thermal power station
Primary fuelCoal (81%)
Natural gas (19%)
Turbine technologySteam turbine
Cooling sourceGenesee cooling pond
Power generation
Units operational2 × 430 MW subcritical coal-fired steam
1 × 516 MW supercritical coal-fired steam
Units planned2 × 530 MW combined cycle gas turbines (both 50% Capital Power Corporation, 50% ENMAX Corporation)
Nameplate capacity1,376 MW

Genesee Generating Station is a coal fired station owned by Capital Power Corporation, located near Genesee, Alberta, Canada; 71 km (44 miles) southwest of Edmonton, Alberta. Fuel is provided by the nearby coal mine, a joint venture of EPCOR and Westmoreland Prairie Resources. The Genesee cooling pond is a reservoir covering 735 hectares (1,820 acres). The pond is topped up with water from the North Saskatchewan River.

The station consists of three units.

Description

The Genesee Generating Station consists of:[1][2]

  • G1 - one 400 net MW unit (commissioned in May 1994)
  • G2 - one 400 net MW unit (commissioned in October 1989)
  • G3 - one 466 net MW unit (commissioned in March 2005)

The boilers were supplied by Combustion Engineering/Hitachi while the turbines/generator are supplied by GEC/Hitachi.[3] The plant has two smokestacks, one 138 m (453 ft) tall, the other 121 m (397 ft) tall.[4]

Conversion to natural gas

On 18 June 2019, Capital Power announced plans to expand the "dual-fuel" capabilities of all three units to running off 50% coal and 50% natural gas, with the intent to convert the power station to 100% natural gas use by 2030. Capital Power submitted applications in 2020 and received approval from the AUC and AEP in 2021 to convert Units 1 and 2 to Natural Gas Combined Cycle (NGCC) technology. The project also includes addition of a 210 MW Battery Energy Storage System (BESS). [5] Unit 3 was converted to a 60/40 ratio of coal to natural gas in spring 2021 and will be converted to enable 100% gas firing in 2023. [6] According to Capital Power, all units were to be off coal by 2023.[7] The date for units 1 and 2 has since been delayed to 2024.[8]

See also

References

  1. "Presentation on G3" (PDF). Retrieved 13 November 2018.
  2. "Archived copy" (PDF). Archived from the original (PDF) on 2017-08-09. Retrieved 2017-08-09.{{cite web}}: CS1 maint: archived copy as title (link)
  3. Coal Fired Power Plants in Canada - Power Plants Around the World Archived 5 December 2012 at archive.today
  4. "Environment and Climate Change Canada - NPRI Data Search". ec.gc.ca. Retrieved 13 November 2018.
  5. "Repowering of Genesee 1 & 2". Retrieved 2023-01-17.
  6. "Genesee Generating Station 3". Retrieved 2023-01-17.
  7. "Genesee Generating Station". Capital Power. Retrieved 2023-04-04.
  8. "Genesee Generating Station Repowering Genesee 1 & 2". Capital Power. Retrieved 21 August 2023.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.