Gavin Power Plant
CountryUnited States
LocationCheshire, Ohio
Coordinates38°56′09″N 82°07′00″W / 38.93583°N 82.11667°W / 38.93583; -82.11667
StatusOperational
Commission date1974-1975
Owner(s)Lightstone Generation LLC
Thermal power station
Primary fuelCoal
Power generation
Nameplate capacity2,600 MW
External links
CommonsRelated media on Commons

General James M. Gavin Power Plant is a 2,600-megawatt supercritical coal-fired power station in the village of Cheshire, Ohio, United States. It is owned by Lightstone Generation LLC, a 50–50 joint venture of The Blackstone Group L.P. and ArcLight Capital Partners. Gavin is the largest coal-fired power facility in Ohio,[1] and one of the largest in the US, capable of powering two million homes. In February 2017, the plant represented slightly more than 11% of the total electric generation capacity in Ohio according to the Energy Information Administration (EIA).[2] The plant was named in honor of James Maurice "Jumpin' Jim" Gavin, the third Commanding General (CG) of the 82nd Airborne Division during World War II.

History

Gavin's two units, rated at 1,300 MW each, were placed into service in 1974 and 1975. The power plant is connected to the electric transmission grid by 765-kilovolt transmission lines.

In 2002, to avoid lawsuits relating to air pollution in the village of Cheshire, the American Electric Power (AEP) corporation decided to buy out the town, by paying every homeowner 3.5 times the market value of their home to move. The total deal came to around $20 million.[1]

AEP sold Gavin along with three other plants to Blackstone and ArcLight as a part of a $2.17 billion deal in 2016.[3]

The power plant has been using unlined pits to store its fly ash, which could contaminate groundwater. The facility's owners applied for a permit from the United States Environmental Protection Agency (EPA) to continue operating and using the unlined pits.[4] In November 2022, the EPA ordered the utility to stop dumping coal ash into unlined storage ponds and speed cleanup of the site. The plant may have to pause or even cease operations in order to comply with the order. The order becomes effective 135 days after publication in the Federal Register. If additional time is needed, the order included a process to address demonstrated grid reliability issues.[5]

Operations

Gavin is equipped with a suite of air quality controls. These include selective catalytic reduction units that reduce nitrogen oxide (NOx) emissions by 82%; flue-gas desulfurization (FGD) units (scrubbers) that remove 94% of sulfur dioxide (SO2) emissions and electrostatic precipitators for particulate control. Together the controls reduce mercury emissions by up to 91% and particulates by 99%.

The plant contributes approximately $6 million a year in property taxes that support the Gallia County school system and government. The plant is Gallia County's largest taxpayer and makes annual contributions of more than $50,000 to local charities and non-profits.

See also

References

  1. 1 2 Martin, Richard (October 16, 2016). "For $20 Million, a Coal Utility Bought an Ohio Town and a Clear Conscience". The Atlantic. Retrieved November 27, 2017.
  2. Monthly data eia.gov
  3. Johnson, Michael (September 14, 2016). "AEP sells Gavin Plant in Cheshire". Gallipolis Daily Tribune. Retrieved June 9, 2018.
  4. "Midwest power plants face shutdown after EPA proposes denying requests to keep using unlined coal ash ponds". Utility Dive. Retrieved January 12, 2022.
  5. Daly, Matthew (November 18, 2022). "EPA orders Ohio power plant to stop dumping toxic coal ash". AP News. Retrieved November 20, 2022.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.