Five Ways Tower
Five Ways Tower in 2010
General information
StatusUnder Demolition
TypeCommercial
Architectural styleModernism
LocationFrederick Road, Five Ways, Birmingham, England
Coordinates52°28′16.74″N 1°54′58.78″W / 52.4713167°N 1.9163278°W / 52.4713167; -1.9163278
Completed1979 (1979)
Closed2005 (2005)
Demolished2023 (Ongoing)
Height76 metres (249 ft)
Technical details
Structural systemSteel, Concrete
MaterialBrick, Concrete, Steel, Reinforced Concrete, Precast Concrete, Glass
Floor count23
Floor area100,000 square feet (9,290 m2)
Lifts/elevators6 (installed by Schindler Elevator Corporation)
Design and construction
Architect(s)Philip Bright
Architecture firmProperty Services Agency

Five Ways Tower was a 23-storey commercial building, completed in 1979, on a 2.1-acre (8,500 m2) prime site located in the Birmingham City Centre by the corner of Frederick Road and Islington Road, near to the Five Ways roundabout and close to Five Ways Station, at the gateway to the Edgbaston area of Birmingham 15, England.

The building became vacant with the last tenants evacuating the building in 2005 due to ill health amongst the workforces. It was discovered that the building suffered from sick building syndrome, and although several hotels expressed interest in acquiring the building from its owners, since its solid concrete design could be converted into a business class hotel, it was decided to be demolished due to it being too expensive to refurbish to modern standards.

Over the last couple of years, the building had become a target for trespassers. The building suffered extensively from external damage including many smashed and missing windows, graffiti and structural damage, despite the owner’s extensive efforts to prevent this by installing more fencing, this continued.

The building was in excess of 100,000 sq ft (9,300 m2) of existing net office space, six lifts, basement storage, and a double height floor at the top. The building held a carpark for approximately 200 cars allocated to the Tower.

As of November 2023, the building is undergoing a demolition phase, in which the majority of the tower's car park and office space have already been torn down to make way for a structure of similar scale together with two smaller blocks for student/residential uses.

The building's architect was Philip Bright of the Property Services Agency. Andy Foster described it as being similar to the work of James Stirling.[1]

See also

References

  1. Foster, Andy (2007) [2005]. Birmingham. Pevsner Architectural Guides. Yale University Press. p. 238. ISBN 978-0-300-10731-9.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.