Cairo Fair Station محطة المعرض | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Cairo Metro Rapid transit | |||||||||||
General information | |||||||||||
Location | Egypt | ||||||||||
Coordinates | 30°04′24″N 31°18′03″E / 30.07333°N 31.30091°E | ||||||||||
Operated by | Cairo Metro - The Egyptian Co. for Metro Management & Operation[1] | ||||||||||
Line(s) | Line 3 | ||||||||||
Platforms | 2 side platforms (Cairo International Airport - Imbaba) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground[2] | ||||||||||
Platform levels | 3 | ||||||||||
History | |||||||||||
Opened | 7 May 2014[3] | ||||||||||
Electrified | Third rail | ||||||||||
Services | |||||||||||
|
Fair Zone or Cairo Fair (Arabic: محطة المعرض / أرض المعارض) is a station on Cairo Metro, part of phase 2 of Line 3.[4] It is located on Salah Salem Street in front of the Cairo International Fair Ground, one of the most important commercial and administrative centers of Cairo.[5]
Overview
Cairo Fair Station was inaugurated on 7 May 2014 as part of phase 2 of Line 3.[3]
In addition, the station has a contactless fare collection system as well as an integrated supervision and communication system supplied by the Thales Group.[6]
Station layout
G | Street Level | Entrances/Exits (Elevator) |
B1 | Underground Level 1 | to entrances/exits, fare control |
B2 | Underground Level 2 | Engine Rooms/Maintenance |
P Platform level |
Side platform, doors will open on the left | |
Eastbound | → Cairo Metro Line 3 toward Airport (Cairo Stadium) → | |
Westbound | ← Cairo Metro Line 3 toward Imbaba (Abassiaa) | |
Side platform, doors will open on the left |
Notable places nearby
- Cairo International Book Fair[5]
- State Information Service[5]
- General Authority for Investment[5]
See also
References
- ↑ "About Company". Cairo Metro. Archived from the original on 17 August 2014. Retrieved 11 September 2014.
- ↑ Giulini-Leonardi, Sylvie; Gastebled, Oliver J.; Mahdi, Samy (2011). "A compact design for shaft-tunnel junction adopted for Greater Cairo Metro Line 3: design aspects and use of advanced numerical methods" (PDF). In Redmond, Steve; Romero, Victor (eds.). Rapid Excavation and Tunneling Conference 2011 Proceedings. Englewood, Colo: Society for Mining, Metallurgy, and Exploration, Inc. pp. 880–890. ISBN 978-0-87335-343-4.
- 1 2 "Cairo metro Line 3 extension opens". railwaygazette.com. railwaygazette.com. 8 May 2014. Retrieved 12 September 2014.
- ↑ "Phase 2 of Line 3". National Authority for Tunnels. Retrieved 11 September 2014.
- 1 2 3 4 "Cairo Fair Station". National Authority for Tunnels. Retrieved 11 September 2014.
- ↑ "Thales awarded ticketing and supervision system contract for Line 3 of the Cairo Metro". Thales Group. 21 June 2009. Archived from the original on 18 May 2015. Retrieved 9 May 2015.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.