Environmental Planning and Assessment Act 1979
Parliament of New South Wales
  • An Act to institute a system of environmental planning and assessment for the State of New South Wales.
Citation1979 No. 203
Enacted byParliament of New South Wales
Administered byDepartment of Planning and Environment
Status: Current legislation

The Environmental Planning and Assessment Act 1979 was passed in the Australian state of New South Wales.

It is an "Act to institute a system of environmental planning and assessment for the State of New South Wales".

The act incorporated a three-tiered system of state, regional (now repealed) and local levels of significance, and required the relevant planning authority to take into consideration the impacts to the environment (both natural and built) and the community of proposed development or land-use change.[1] Most development requires a Statement of Environmental Effects detailing the impacts to both natural and human environments, which should be taken into consideration by the regulatory authority, while larger projects require a more thorough environmental impact assessment and greater public scrutiny.

Parts of the Act

The Act covers the entire spectrum of environmental assessment and was divided into 11 Parts.

  • PART 1 - PRELIMINARY
  • PART 2 - ADMINISTRATION
  • PART 2A - PLANNING BODIES
  • PART 3 - ENVIRONMENTAL PLANNING INSTRUMENTS
  • PART 3A - (REPEALED)
  • PART 3B - STRATEGIC PLANNING
  • PART 4 - DEVELOPMENT ASSESSMENT
  • PART 4A - CERTIFICATION OF DEVELOPMENT
  • PART 4B - (REPEALED)
  • PART 4C - LIABILITY AND INSURANCE
  • PART 5 - ENVIRONMENTAL ASSESSMENT
  • PART 5A - (REPEALED)
  • PART 6 - IMPLEMENTATION AND ENFORCEMENT
  • PART 7 - FINANCE
  • PART 7A - LIABILITY IN RESPECT OF CONTAMINATED LAND
  • PART 8 - MISCELLANEOUS

It was amended in 2017 by the Environmental Planning and Assessment Amendment Act 2017 (commencing on 1 March 2018), and is now divided into 10 Parts.[2]

  • PART 1 - PRELIMINARY
  • PART 2 - PLANNING ADMINISTRATION
  • PART 3 - PLANNING INSTRUMENTS
  • PART 4 - DEVELOPMENT ASSESSMENT AND CONSENT
  • PART 5 - INFRASTRUCTURE AND ENVIRONMENTAL IMPACT ASSESSMENT
  • PART 6 - BUILDING AND SUBDIVISION CERTIFICATION
  • PART 7 - INFRASTRUCTURE CONTRIBUTIONS AND FINANCE
  • PART 8 - REVIEWS AND APPEALS
  • PART 9 - IMPLEMENTATION AND ENFORCEMENT
  • PART 10 – MISCELLANEOUS

Controversy over Part 3a

The Act gained considerable controversy with the introduction of section part 3a that effectively allowed the Planning Minister to declare a project as of “State significance” and assume direct approval delegation.[3] Although it was introduced to streamline the planning process and fast track the assessment of large infrastructure projects, a public perception of its misuse was a significant factor in the defeat of the Keneally government.

See also

References

  1. Environmental Planning And Assessment Act 1979 (NSW) s79c
  2. "Guide to the updated Environmental Planning and Assessment Act 1979". www.planning.nsw.gov.au. NSW Department of Planning, Industry and Environment.
  3. "What is Part3a". Archived from the original on 3 October 2013. Retrieved 27 September 2013.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.