E. 79th St. | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | 2700 East 79th Street Cleveland, Ohio | ||||||||||
Coordinates | 41°29′10″N 81°38′00″W / 41.48611°N 81.63333°W | ||||||||||
Owned by | Greater Cleveland Regional Transit Authority | ||||||||||
Line(s) | NS Lake Erie District | ||||||||||
Platforms | 1 island platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | RTA: 2[1] | ||||||||||
Construction | |||||||||||
Structure type | Below-grade | ||||||||||
Bicycle facilities | Racks[2] | ||||||||||
Accessible | Yes[2] | ||||||||||
Other information | |||||||||||
Website | riderta | ||||||||||
History | |||||||||||
Opened | March 15, 1955 | ||||||||||
Rebuilt | 2021 | ||||||||||
Original company | Cleveland Transit System | ||||||||||
Services | |||||||||||
|
East 79th station (signed as East 79th Street) is a station on the RTA Red Line in Cleveland, Ohio. It is located on the west side of East 79th Street between Woodland Avenue and Grand Avenue. The entrance is on the east side of East 79th Street.
The station opened along with CTS Rapid Transit on March 15, 1955.[3] It originally served nearby industrial facilities, such as the Van Dorn Company, as well as a connection for the East 79th Street bus line. With the closing of most of the industrial facilities adjacent to the station, passenger boardings have decreased so that it has become one of the least used stations on the Red Line. RTA had considered closing the station or moving it to the intersection of Woodland Avenue and Buckeye Road.[4][5] In early 2020, the RTA made the decision to renovate the station, with construction scheduled to finish in the summer of 2021.[6] The station renovation was completed ahead of schedule, and reopened on March 10, 2021.[7]
Station layout
G | Street level | Entrance/exit, buses |
P Platform level |
Lake Erie District |
← NS freight service |
NS freight service → | ||
Westbound | ← Red Line toward Airport (East 55th) | |
Island platform , doors open on the left | ||
Eastbound | Red Line toward Windermere (East 105th–Quincy) → |
Station photos
- Station platform in 2021
- Former CTS station platform in 2016
References
- ↑ "Red Line Schedule" (PDF). Greater Cleveland Regional Transit Authority. December 11, 2022. Retrieved May 8, 2023.
- 1 2 "E. 79 (Red Line) Rapid Station". Greater Cleveland Regional Transit Authority. Retrieved May 8, 2023.
- ↑ Exner, Rich (March 14, 2005). "Red Line rapid marks 50 years in service". The Plain Dealer. pp. A1. Retrieved June 2, 2007.
- ↑ McIntyre, Michael K. (January 6, 1999). "RTA plans new sites, upgrades for Red Line on east side". The Plain Dealer. pp. 1B. Retrieved June 2, 2007.
- ↑ Sweeney, James F. (October 27, 1999). "RTA considers closing 3 stations on Red Line". The Plain Dealer. pp. 3B. Retrieved June 2, 2007.
- ↑ "E. 79 St. Closure". April 1, 2020. Archived from the original on March 30, 2020.
- ↑ "Greater Cleveland Regional Transit Authority". Twitter. Retrieved March 10, 2021.
External links
Media related to East 79th station (GCRTA Red Line) at Wikimedia Commons