Dumai-Malacca Cable System or DMCS is a submarine telecommunications cable system linking Indonesia and Malaysia across the Strait of Malacca
It has landing points in:
It has a design transmission capacity of 320 Gbit/s of which 20 Gbit/s were lit at inception, and a total cable length of 150 km. It was inaugurated on 17 February 2005.