Collgar Wind Farm | |
---|---|
Country | Australia |
Location | Near Merredin |
Coordinates | 31°32′35″S 118°27′16″E / 31.5430556°S 118.4545833°E |
Status | Operational |
Construction began | June 2010 |
Commission date | March 2012 |
Construction cost | A$750m |
Owner(s) | Retail Employees Superannuation Trust |
Wind farm | |
Type | Onshore |
Hub height | 80 metres (262 ft) |
Rotor diameter | 90 metres (295 ft) |
Site area | 18,000 hectares (180.00 km2) |
Power generation | |
Units operational | 111 × 2.0 MW |
Make and model | Vestas V90-2MW |
Nameplate capacity | 222 MW |
Capacity factor | 34.24% (average 2012-2020) |
Annual net output | 665.8 GWh (average 2012-2020) |
External links | |
Website | [www.collgarwindfarm.com.au] |
Collgar Wind Farm is a wind farm located approximately 25 kilometres south-east of Merredin, Western Australia.[1] It is operated by Collgar Renewables. With 111 Vestas V90-2.0MW wind turbines,[2][3] and a total installed capacity of 222 MW registered with AEMO,[4] it is Western Australia's largest wind farm. It became fully operational in October 2011[5] and is expected to generate 750 GWh per year on average over the 30-year life of the project.[1]
History
Feasibility studies were carried out between 2006 and 2008, and planning approval was granted in September 2008. In March 2010, Collgar Wind Farm Pty Ltd was sold to UBS International Infrastructure Fund and Retail Employees Superannuation Trust and in June 2019, Retail Employees Superannuation Trust became the sole shareholder.[6]
Construction began in June 2010, the wind farm was connected to the grid in April 2011,[1] and the first 50 turbines started operation in May 2011.[3][7] The wind farm became fully operational in October 2011.[5]
While Collgar's wind turbines were initially de-rated to 1.856 MW, limiting output to 206 MW, they were returned to their design capacity of 2.0 MW during March and April 2020, increasing output to the current 222 MW.[5]
Operations
AEMO records begin in June 2011 for the wind farm. The generation table uses AEMO Facility SCADA to obtain generation values for each month. Collgar's code is INVESTEC_COLLGAR_WF1, so that is used as part of a SUMIF operation (shown below) on the table to get the total. Note that each month's values start 8 hours into the respective month and extend 8 hours into the next month.
=SUMIF(E2:E Last Row,"*INVESTEC_COLLGAR_WF1*",F2:F Last Row)
Year | Total | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2011 | 287,225 | N/A | N/A | N/A | N/A | N/A | 14,614* | 26,360* | 31,306* | 46,699* | 53,002* | 58,121 | 57,123 |
2012 | 640,200 | 66,373 | 56,733 | 67,198 | 50,610 | 47,758 | 53,930 | 13,487* | 44,554 | 61,583 | 68,524 | 56,789 | 52,661 |
2013 | 647,963 | 67,685 | 57,569 | 52,933 | 33,712 | 45,245 | 37,273 | 47,667 | 56,082 | 61,154 | 53,857 | 72,971 | 61,815 |
2014 | 679,954 | 71,733 | 65,506 | 62,400 | 40,677 | 38,987 | 51,386 | 54,859 | 53,317 | 57,979 | 55,815 | 58,518 | 68,777 |
2015 | 681,676 | 76,184 | 48,963 | 49,333 | 62,347 | 53,540 | 55,564 | 47,088 | 52,165 | 55,576 | 56,859 | 55,722 | 68,335 |
2016 | 671,039 | 62,672 | 65,039 | 68,050 | 50,132 | 33,708 | 41,450 | 58,669 | 54,861 | 49,771 | 65,709 | 53,228 | 67,750 |
2017 | 659,380 | 60,082 | 63,272 | 61,459 | 44,549 | 41,218 | 43,654 | 59,908 | 57,077 | 43,134 | 62,263 | 62,389 | 60,375 |
2018 | 679,894 | 76,105 | 56,132 | 66,050 | 42,218 | 63,290 | 37,984 | 66,252 | 58,378 | 46,871 | 56,306 | 53,382 | 56,926 |
2019 | 660,021 | 63,699 | 56,889 | 58,262 | 58,831 | 44,249 | 62,698 | 44,437 | 55,378 | 48,264 | 54,667 | 58,579 | 54,068 |
2020 | 672,377 | 61,484 | 69,644 | 55,677 | 42,007 | 54,245 | 55,691 | 55,141 | 56,439 | 46,360 | 58,293 | 51,588 | 65,808 |
Note: Asterisk indicates power output was limited during the month.
See also
References
- 1 2 3 Quinn, Russell: WA's biggest wind farm is now online Archived 18 April 2011 at the Wayback Machine, in Perth Now, 15 April 2011
- ↑ Collgar Wind Farm: Site location and layout, retrieved 12 May 2011
- 1 2 Merredin Mercury: First power generated, 11 May 2011
- ↑ Collgar Fact Sheet, retrieved 30 August 2022
- 1 2 3 Collgar Wind Farm: About, retrieved 30 August 2022
- ↑ Rest takes control of Collgar Wind Farm, retrieved 30 August 2022
- ↑ Giant WA wind farm spins up a storm in the Australian Financial Review, 12 May 2011