Cibubur Line
Trial run at Harjamukti Station
Overview
Other name(s)Service line 1 of LRT Jabodebek (working name)
Native nameLin Cibubur
StatusOperational
OwnerMinistry of Transportation
LocaleJakarta, West Java
Termini
Stations12
Service
TypeLight rail transit
SystemJabodebek LRT
Services1
Operator(s)Kereta Api Indonesia
Depot(s)Harjamukti (pit stop)
History
OpenedAugust 28, 2023 (2023-08-28)[1]
Completed2022 [2]
Technical
Line length25.94 km (16.12 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC Third rail system
Route map

planned extension to Grogol
DA
Dukuh Atas
ST
Setiabudi
RS
Rasuna Said
KN
Kuningan
PC
Pancoran
CK
Cikoko
CL
Ciliwung
CW
Cawang
to Jatimulya
TM
TMII
Jagorawi Toll Road│JORR
KR
Kampung Rambutan Kampung Rambutan Terminal
CI
Ciracas
HM
Harjamukti
planned extension to Baranangsiang

The Jabodebek LRT Cibubur Line (Indonesian: LRT Jabodebek Lin Cibubur) is one of the two light rail line of the Jabodebek LRT which connect Dukuh Atas to Harjamukti station, which is about 25.94 km in length. The line adopts elevated construction and stops at twelve stations.

Its Pancoran–Harjamukti section runs along the Jakarta Inner Ring Road and Jagorawi Toll Road. The planned next phase would extend the line to Bogor.[3]

History

The elevated route is built parallel with the Jagorawi Toll Road.

Like other public transportation systems in Jabodetabek area, the Jabodebek LRT system was built to break down congestion. The construction of the Cawang–Cibubur LRT Line and other lines in the first phase of the Jabodebek LRT construction began with the groundbreaking on 9 September 2015 by President Joko Widodo. It was carried out near the planned TMII Station which is a part of this route.[4]

Initially the phase 1 was targeted to be completed before the 2018 Asian Games. However, until the Asian Games were held, the overall progress was still 45%. Even so, at the time the Cawang–Cibubur route had already begun to be installed with rails.[5]

In March 2019, the entire track has been connected. All elevated construction work has been completed and continued with signaling and station construction. Therefore, the line is estimated to be ready for the trial run considering that the other lines have not yet completed their track construction.[6][7]

On October 11, 2019, the first train of Jabodebek LRT arrived in Jakarta. The shipment was carried out by land directly from INKA factory in Madiun, East Java. For the time being, the train has been parked near Harjamukti Station; considering that the LRT depot construction in Jatimulya, Bekasi has not yet been completed.[8][9]

In October 2020, the Jabodebek LRT trains began their trials. The trial was carried out on the Cawang–Cibubur route from TMII Station to Harjamukti Station. It was conducted to check signal and track readiness.[10][11]

Network

Route

The Cibubur Line has a track length of 25.94 kilometers.[12] Most of the trajectory of this route is using an elevated structure. From Dukuh Atas Station to Cawang Station, this line shares the route with Bekasi Line, goes along Jalan Rasuna Said then turns to the south side of the Jakarta Inner Ring Road (Cawang–Pluit section). In Cawang Station, the two lines split and the line follows the Jagorawi Toll Road alignment.[13] In a section from Cawang Station to TMII Station, the route follows the east side of the toll road; tracks are made at grade because it is close to the approach zone of Halim Perdanakusuma Airport. After TMII Station, the route moves to the west side until its terminus at Harjamukti Station.[14]

List of stations

Stations Transfer/Notes Location
Number Name City/Regency Province
Phase 1: Cibubur–Dukuh Atas
CB01 BK01 Dukuh Atas Terminus station.

Dukuh Atas BNI

Sudirman

BNI City

Koridor 1 Transjakarta Koridor 6 Transjakarta (13C) K1-9 Dukuh Atas 1

Koridor 4 Transjakarta Koridor 6 Transjakarta K4-17 Dukuh Atas 2

South Jakarta Jakarta
CB02 BK02 Setiabudi Koridor 4 Transjakarta Koridor 6 Transjakarta Koridor 6 Transjakarta (L13E) K6-17 Setiabudi Utara AINI
CB03 BK03 Rasuna Said Koridor 4 Transjakarta Koridor 6 Transjakarta Koridor 6 Transjakarta (L13E) K6-14 GOR Sumantri
CB04 BK04 Kuningan Koridor 4 Transjakarta Koridor 6 Transjakarta Koridor 6 Transjakarta (L13E) K6-13 Departemen Kesehatan
CB05 BK05 Pancoran Koridor 9 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta (13C) K9-10 Pancoran Barat
CB06 BK06 Cikoko Cawang

Koridor 9 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta K9-7 Cikoko Stasiun Cawang

CB07 BK07 Ciliwung Koridor 9 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta K9-6 Cawang Ciliwung East Jakarta
CB08 BK08 Cawang

Interchange station to

Koridor 5 Transjakarta Koridor 5 Transjakarta Koridor 7 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta Koridor 9 Transjakarta K7-10 Cawang BNN

CB09 Taman Mini Koridor 9 Transjakarta Koridor 9 Transjakarta K9-2 Garuda Taman Mini

Access to Taman Mini Indonesia Indah.

CB10 Kampung Rambutan Koridor 7 Transjakarta (7F) (10D) K7-1 Kampung Rambutan

Bus Terminal Kampung Rambutan Bus Terminal.

CB11 Ciracas
CB12 Harjamukti Terminal station (phase 1). Depok West Java
Phase 2: Cibubur–Bogor (under feasibility study)
Phase (?): Dukuh Atas–Senayan (under feasibility study)
CB01 BK01 Palmerah Palmerah Central Jakarta Jakarta
CB02 GBK
CB03 Senayan Senayan

Koridor 1 Transjakarta (6V) Koridor 9 Transjakarta (10H) Bundaran Senayan

Future development

In the phase 2 plan, the Cibubur Line is to be extended to Bogor and Senayan.[15][16] The Cibubur-Bogor route is planned to be built at grade, instead of elevated like the Cawang–Cibubur route. This aims to save construction costs by up to 50%.[17] Until recently, it is still in the design planning process.[18][19]

Incidents

  • On October 25, 2021, two LRT trains had an accident while undergoing trials on Cibubur Line, parallel to the Jagorawi Toll Road.[20][21]

References

  1. "Cara Naik LRT Jabodebek yang Baru Diresmikan Jokowi Hari Ini". CNN Indonesia (in Indonesian). August 28, 2023. Retrieved August 29, 2023.
  2. "Proyek LRT Jabodebek Molor ke 2022" (in Indonesian). June 5, 2020. Retrieved June 27, 2020.
  3. Dewi Rina Cahyani (ed.). "Proyek LRT Cibubur - Bogor Ditargetkan Rampung 3 Tahun" (in Indonesian). Retrieved November 11, 2019.
  4. "LRT JABODETABEK: Jokowi 'Groundbreaking' Hari Ini". Bisnis.com (in Indonesian). September 9, 2015. Retrieved January 4, 2023.
  5. "Konstruksi Sipil LRT Jabodebek Rampung Akhir 2018". KOMPAS.com (in Indonesian). August 21, 2018. Retrieved January 4, 2023.
  6. "Lintas Cawang-Cibubur Tersambung, Progres LRT Capai 60 Persen". CNN Indonesia (in Indonesian). Retrieved January 4, 2023.
  7. Alhikam, Herdi Alif. "Fakta Jalur LRT Cibubur-Cawang Sudah Tersambung". detikfinance (in Indonesian). Retrieved January 4, 2023.
  8. Lidyana, Vadhia. "Penampakan LRT Jabodebek yang Tiba di Jakarta". detikfinance (in Indonesian). Retrieved January 4, 2023.
  9. "Fakta-Fakta Terbaru LRT Jabodebek, Termasuk Tarif Rp12.000 Semua Halaman". merdeka.com. October 15, 2019. Retrieved January 4, 2023.
  10. Anwar, Muhammad Choirul. "Uji Coba LRT Cibubur: Mulai Mondar-Mandir, Kapan Operasi?". CNBC Indonesia (in Indonesian). Retrieved January 4, 2023.
  11. "Jam 2 Siang, Uji Coba LRT Jabodebek 4 kali Bolak-balik : Okezone Economy". Okezone (in Indonesian). October 22, 2020. Retrieved January 4, 2023.
  12. Media, Kompas Cyber (July 27, 2019). "Panduan Lengkap LRT Jabodebek, Rute dan Stasiun". KOMPAS.com (in Indonesian). Retrieved January 4, 2023.
  13. "Konstruksi Jalur LRT Berada di Sisi Kanan Tol Jagorawi". TEMPO.CO (in Indonesian). October 21, 2015. Retrieved January 4, 2023.
  14. Aditiasari, Dana. "Cibubur-Cawang Terhubung LRT, Ini Jalurnya". detikfinance (in Indonesian). Retrieved January 4, 2023.
  15. Aliya, Angga. "Ini Dia Rute-rute LRT Jokowi yang akan Dibangun Adhi Karya". detikfinance (in Indonesian). Retrieved January 4, 2023.
  16. "Ini Rute LRT dari Bekasi, Bogor, Depok dan Jakarta". suara.com (in Indonesian). September 9, 2015. Retrieved January 4, 2023.
  17. Pramisti, Nurul Qomariyah. "LRT Jabodebek Tahap 2 Arah Bogor Dibangun di Darat, Biaya Turun 50%". tirto.id (in Indonesian). Retrieved January 4, 2023.
  18. "Pembangunan Lintas Rel Terpadu Tahap II Rampung dalam 3 Tahun". Bisnis.com (in Indonesian). November 11, 2019. Retrieved January 4, 2023.
  19. Siregar, Efrem. "Kabar Gembira! LRT Cibubur-Sentul-Bogor Siap Dieksekusi". CNBC Indonesia (in Indonesian). Retrieved January 4, 2023.
  20. "BREAKING NEWS: LRT Jabodetabek Tabrakan di Atas Ruas Tol Jagorawi Jakarta Timur". Tribunnews.com (in Indonesian). Retrieved January 4, 2023.
  21. Liputan6.com (October 25, 2021). "LRT Jabodebek Tabrakan di Jalur Layang Cibubur, Adhi Karya Kirim Tim ke Lapangan". liputan6.com (in Indonesian). Retrieved January 4, 2023.{{cite web}}: CS1 maint: numeric names: authors list (link)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.