Charles de Gaulle Plaza | |
---|---|
Location within Romania | |
General information | |
Status | Completed |
Type | Office building |
Location | Bucharest, Romania |
Coordinates | 44°27′55″N 26°05′15″E / 44.4653°N 26.0874°E |
Completed | 2003 |
Opening | 2005 |
Cost | US$ 50.000.000 |
Owner | Avrig 35 |
Height | |
Roof | 70 m (230 ft) |
Technical details | |
Floor count | 17[1] |
Floor area | over 23,000 m2 (250,000 sq ft)[1] |
Lifts/elevators | Four panoramic elevators |
Design and construction | |
Architect(s) | Westfourth Architecture |
Developer | Avrig 35 |
Engineer | Emanuel E. Necula, Consulting Engineers P.C. |
Main contractor | BogArt |
Charles de Gaulle Plaza is a "class A" office building in the Charles de Gaulle Square, Bucharest, Romania. It is constructed entirely out of concrete, steel and glass. It has 16 floors and a gross lettable area of 22,000 m2 (240,000 sq ft). There are an additional five floors underground that serve as a parking space with 350 places. The elevators are the fastest in Romania having a speed of 2.5 m/s (8.2 ft/s).[2]
See also
References
- 1 2 "Charles deGaulle Plaza". Retrieved 11 October 2023.
- ↑ THE BUILDING
External links
Wikimedia Commons has media related to Charles de Gaulle Square Business Center, Bucharest.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.