Chaoyang–Linghai high-speed railway 朝凌高速铁路 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | China Railway High-speed | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 107 km (66 mi)[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | 350 km/h (217 mph) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Chaoyang–Linghai high-speed railway is a high-speed railway line in China. The railway is 107 kilometres (66 mi) long[1] and has a design speed of 350 kilometres per hour (220 mph).[2] The railway opened on August 3, 2021.[1]
History
Construction officially began in October 2017. Tracklaying was completed in December 2020.[3] The railway opened on August 3, 2021.[1]
Stations
Station Name[1] | Chinese | China Railway transfers/connections | ||||||||
---|---|---|---|---|---|---|---|---|---|---|
Liaoning Chaoyang | 辽宁朝阳 | Beijing–Shenyang high-speed railway | ||||||||
Batuying | 巴图营 | |||||||||
Jinzhou North | 锦州北 | |||||||||
Linghai South | 凌海南 | Qinhuangdao–Shenyang passenger railway |
References
- 1 2 3 4 5 唐佳丽 (2021-08-02). "朝凌高铁即将开通 昨日开始售票 大连、锦州至北京分别缩短47分钟和35分钟". Archived from the original on 2021-08-02. Retrieved 2021-08-02.
- ↑ "朝凌高铁桥梁施工进入关键阶段!通车后大连至北京缩短1.5小时" [Chaoyang-Linghai high-speed railway bridge construction into a critical stage! Dalian to Beijing will be shortened by 1.5 hours after opening]. China Railway (in Chinese). 20 September 2018. Retrieved 10 March 2021.
- ↑ "朝凌高铁完成无砟轨道施工" [Chaoling high-speed rail completed the construction of the track]. news.cnstock.com (in Chinese). 1 December 2020. Archived from the original on 2021-08-01. Retrieved 10 March 2021.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.