BrightStar Gold Project
Location
BrightStar Gold Mine is located in Western Australia
BrightStar Gold Mine
BrightStar Gold Mine
Location in Western Australia
LocationLaverton
StateWestern Australia
CountryAustralia
Coordinates28°50′28″S 122°38′49″E / 28.84111°S 122.64694°E / -28.84111; 122.64694
Production
ProductsGold
Production0[1]
Financial year2021
History
Opened2009
Active2009–2011
Closed2011
Owner
CompanyBrightstar Resources Limited
Websitewww.brightstarresources.com.au
Year of acquisition2002

The BrightStar Gold Mine is a gold project located 35 km south-east of Laverton, Western Australia. Operations at Brightstar are suspended with the processing plant under care and maintenance.[2]

Owned by Stone Resources Australia Limited, it was in production from December 2009 to 2011.[3][4] Stone Resources Australia Limited is owned and controlled to 55.61% by Chinese company Stone Resources Limited, which currently funds the company's activities.[5]

History

Gold mines in the Kalgoorlie - Leonora region

Stone Resources Australia, as A1 Minerals, was formed in May 2002 and listed on the Australian Securities Exchange in December 2003.[6] A1 Minerals Limited changed its name to Stone Resources Australia Limited on 30 November 2011. The BrightStar gold project was an asset of the company at the time of listing on the ASX.[7]

The mine is located within an area subject to the Wongatha native title claim. The Wongatha group is a shareholder of Stone Resources. In exchange for the consent of the Wongatha people to any current or future mining tenements, Stone agreed to protect all aboriginal sites, offer training and employment and issue shares in the value of $220,000 to the Wongatha.[8]

Stone expanded BrightStar by acquiring the historical Mikado Gold Mine (28°50'25.71"S 122°38'38.45"E) in July 2005 from Deep Yellow Limited, which had previously mined the deposit in 2004. The deposit had also been mined from 1900 to 1911, when 9,916 ounces of gold had been recovered.[9][10]

In July 2008, Stone purchased a second-hand gold processing plant, which it relocated from Kalgoorlie to the Mikado mine site.[11] In May 2009, Stone signed a $1.7 million contract for the refurbishment of the plant.[12] In July 2009, the company received the necessary approvals from the state mining regulator for the mine project.[13]

The expanded BrightStar project included a number of proposed and existing open pits. Stone planned to recommence mining the existing Alpha (Brightstar) and Beta (Mikado) pits, producing 30,000 ounces of gold per annum. New pits were proposed for Gamma, Delta, Epsilon, Zeta, Eta and Theta (in the Corktree Well and King of Creation areas, 30 to 50 km north of Laverton).[14]

Mining commenced in May 2010 with 2,700 ounces of gold produced for the second quarter of 2010.[15][16]

The mine continuously underperformed after start up, staying below the targeted production of 2,500 ounces of gold per month, with a low point of just 702 ounces produced in April 2011. Stone went into a lengthy ASX trading halt in July 2011 during an attempt to secure more funding.

In 2014 additional plant modifications were proposed to improve gold recovery.[17][18] Mining at BrightStar ceased in September 2011, with remaining ore processed in the following month. By the companies own admission, the 21,726 ounces of gold and 14,586 ounces of silver produced during the mine's operation were a disappointing result in comparison to the expectations for the project. The company's stated reasons for the underperformance of the operation were inaccurate geological data, poor open pit design and poor mill maintenance. The process plant continued to operate until September 2012, treating ore from third parties.[19]

In December 2020, Stone Resources became Brightstar Resources, having previously been A1 Minerals until November 2011.[20]

In May 2021 it was announced that Brightstar Resources planned to spend A$5.5 million on upgrading the Brightstar process plant. The upgrade is part of a plan to recommence mining from three different locations within a 65km radius of the plant.[21][1]

Production

Production figures for the mine:[18][19]

Year Production Grade Cost per ounce
2008–09 inactive
2009–10 2,700 ounces
2010–11 14,287 ounces
2011–12 4,972 ounces
2011–present inactive

References

  1. 1 2 "Brightstar Resources Annual report 2021" (PDF). www.brightstarresources.com.au. Brightstar Resources. Retrieved 27 April 2022.
  2. Yong Han (28 January 2015). "December Quarter Activity Report" (pdf). ASX. Cloverdale WA: Stone Resources Australia Limited. p. 2. Retrieved 28 July 2015.
  3. BrightStar update A1 minerals ASX announcement, published: 23 December 2009, accessed: 11 January 2010
  4. New Western Australian gold mine due by Christmas mineweb.com, accessed: 11 January 2010
  5. "Notice of change of interests of substantial holder" (PDF). Australian Securities Exchange. Stone Resources Australia Limited. 2 December 2019. Retrieved 26 February 2020.
  6. INVEST IN THE FUNDAMENTALS A1 website, accessed: 11 January 2010
  7. Update on Progress at BrightStar Gold Project A1 minerals ASX announcement, published: 19 December 2003, accessed: 11 January 2010
  8. A1 reaches agreement with Native title Claimants A1 minerals ASX announcement, published: 22 July 2004, accessed: 11 January 2010
  9. A1 Acquires Mikdao Gold Mine A1 minerals ASX announcement, published: 18 July 2005, accessed: 11 January 2010
  10. MINEDEX website - Brightstar - Mikado search result Archived September 11, 2008, at the Wayback Machine accessed: 11 January 2010
  11. A1 Secures Gold Processing Plant A1 minerals ASX announcement, published: 17 July 2008, accessed: 11 January 2010
  12. A1 signs Plant Construction and Refurbishment Contract A1 minerals ASX announcement, published: 11 May 2009, accessed: 11 January 2010
  13. Key Treatment Plant and Environmental approvals obtained A1 website, accessed: 30 July 2010
  14. BrightStar Gold Project A1 website, accessed: 11 January 2010
  15. Gold Production Begins A1 minerals ASX announcement, published: 24 May 2010, accessed: 29 July 2010
  16. June 2010 Quarterly Activities Report A1 minerals ASX announcement, published: 28 July 2010, accessed: 29 July 2010
  17. Yong Han (28 February 2014). "Refurbishment of Brightstar Plant" (pdf). ASX. Cloverdale, WA: Stone Resources Australia. Retrieved 6 December 2016.
  18. 1 2 June 2011 Quarterly Activities A1 ASX announcement, published: 29 July 2011, accessed: 5 August 2011
  19. 1 2 "Stone Resources Annual report 2021" (PDF). www.brightstarresources.com.au. Stone Resources. Retrieved 27 April 2022.
  20. "Brightstar Resources Limited (W02454)". minedex.dmirs.wa.gov.au. Department of Mines, Industry Regulation and Safety. Retrieved 27 April 2022.
  21. McKinnon, Stuart (5 May 2021). "Brightstar to refurbish gold processing plant". Australian Mining. Retrieved 27 April 2022.

Bibliography

  • Louthean, Ross (ed.). The Australian Mines Handbook: 2003-2004 Edition. Louthean Media Pty Ltd.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.