Boisar high-speed railway station | |
---|---|
Mumbai-Ahmedabad High-Speed Railway station | |
General information | |
Location | Warangade, Boisar, Maharashtra, India |
Coordinates | 19°47′25″N 72°47′35″E / 19.7904°N 72.7930°E |
Elevation | 22 metres (72 ft) |
Owned by | National High Speed Rail Corporation Limited |
Operated by | National High Speed Rail Corporation Limited |
Line(s) | Mumbai–Ahmedabad high-speed rail corridor |
Platforms | 2 |
Tracks | 4 |
Construction | |
Structure type | Elevated |
Parking | Yes |
Other information | |
Status | Land acquisition underway[1][2] |
History | |
Opened | 2028[3] |
Electrified | Yes |
Location | |
Boisar high-speed railway station Location within Maharashtra Boisar high-speed railway station Boisar high-speed railway station (India) | |
Interactive map |
Boisar high-speed railway station is a proposed high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. This station is located in Warangade, Boisar, Maharashtra, India. It is the fourth station of the Mumbai–Ahmedabad high-speed rail corridor, after Virar station and before Vapi station.[4][5]
Construction
The National High-Speed Rail Corporation Limited (NHSRCL) had invited tenders for Package "C3" of the Mumbai-Ahmedabad high-speed rail corridor (MAHSR) in November 2022, with a deadline of around 4.5 years.[6] In June 2023, Larsen and Toubro won the tender.[7] The NSHRCL signed a letter of agreement (LoA) with Larsen and Toubro for the design and construction of Thane depot, Thane, Virar and Boisar stations in July 2023.[8] As of October 2023, land acquisition near Warangade in Boisar for the station, and for the high-speed railway viaduct in the region is still underway since 2019.[2]
Lines
The station will be served by the Mumbai–Ahmedabad high-speed rail corridor, and will be the fourth station of the Mumbai–Ahmedabad high-speed rail corridor in Boisar.[9]
Structure
The station will have two platforms and two tracks for regular services. It will have three levels–the platform, concourse and service floor as the entrance level. The exterior design of the station building will be inspired by the Arabian Sea because of its close location to it. The station area will have 2 platforms of 425 m (1,394 ft) length for 16-coach E5 Series Shinkansen trains.[10]
Features
The station will have all modern and advanced facilities and amenities for customers and passengers, distinct from Indian Railway stations and similar to airports. Its design has been made to accommodate sufficient space for passenger movement and amenities at the concourse and platform areas. There will be ticketing and waiting areas, a business-class lounge, a nursery, restrooms, smoking rooms, information booths, retail centres and a public information and announcement system. Moreover, skylight provisions will be present on the roof and exterior sides for natural lighting and reduced energy usage. The station will be developed as a transport hub through integration with all basic modes of transportation for better, faster and hassle-free connectivity to and from the station, such as autos, buses and taxis. Such features will be available in all 12 stations of the Mumbai-Ahmedabad high-speed rail corridor.[10]
Connectivity
Road
An approach road to the station will be built to connect it with Boisar and the under-construction Delhi–Mumbai Expressway through Boisar Road.
Rail
The nearest railway station after the station's completion will be Boisar railway station, located 6 km (3.7 mi) west from the station.
Metro
A possible extension of Line 13 (Purple Line) of Mumbai Metro is being considered by the Mumbai Metropolitan Region Development Authority (MMRDA) to link Boisar with Mumbai, as part of the proposed expansion plan of Mumbai Metropolitan Region. If implemented, then Lines 13, 9, and 7 of Mumbai Metro will directly connect the station with Chhatrapati Shivaji Maharaj International Airport.[11][1]
Air
The nearest airport after the station's completion will be Chhatrapati Shivaji Maharaj International Airport in Mumbai, located around 100 km (62 mi) south from the station.
Land acquisition issues
When the National High Speed Rail Corporation Limited (NHSRCL) began acquiring land in the Boisar region, the Warli tribals living in the region began protests against NHSRCL and blocked surveyors from creating land surveys and soil testing required to start the construction, fearing that the project's implementation would lead to loss of their lands and residences. Such actions from people as well as from state government departments in Vasai-Virar, who challenged the development plan of the Mumbai Metropolitan Region that includes the high-speed railway project to pass through the region, had delayed land acquisition altogether in the entire Maharashtra section of the Mumbai-Ahmedabad high-speed rail corridor, that continued until 2022. Officials from the main funding agency of the Mumbai-Ahmedabad high-speed rail corridor project, the Japan International Cooperation Agency (JICA), met the tribals for negotiations, and hence, solved the problem.[1][12]
See also
References
- 1 2 3 Nair, Sandhya (15 February 2019). "Vasai-Virar civic body opposes govt on bullet train plan". The Times of India. Retrieved 5 October 2023.
- 1 2 Lewis, Clara (28 October 2018). "With bullet train, MMRDA feels new BKC can be built in Boisar". The Times of India. Retrieved 6 October 2023.
- ↑ Sen, Anindita (13 September 2023). "Bullet Train Project in India! 32-metre deep BKC station to be ready in 2028, work starts in Mumbai". The Financial Express. Retrieved 4 October 2023.
- ↑ "Mumbai – Ahmedabad High Speed Rail – Information, Route Map, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 5 October 2023.
- ↑ Tiwari, Neeraj (5 December 2018). "Bullet train: 3 growth centres planned along corridor". The Indian Express. Retrieved 6 October 2023.
- ↑ "Information on MAHSR C-3 Package". National High Speed Rail Corporation Limited. 15 November 2022. Retrieved 6 October 2023.
- ↑ "L&T wins ₹15,697 cr civil contract package C3 of Mumbai-Ahmedabad Bullet Train project". Metro Rail Today. 16 June 2023. Retrieved 6 October 2023.
- ↑ "L&T Awarded Mumbai – Ahmedabad Bullet Train's C3 Contract in Maharashtra". The Metro Rail Guy. 20 July 2023. Retrieved 6 October 2023.
- ↑ "Joint Feasibility Study for Mumbai-Ahmedabad High Speed Railway Corridor Final Report Volume 6" (PDF). Japan International Cooperation Agency (JICA). Retrieved 6 October 2023.
- 1 2 Aklekar B., Rajendra (10 February 2023). "Maharashtra: Designs of four bullet train stations unveiled". Mid-Day. Mumbai. Retrieved 5 October 2023.
- ↑ "Mumbai Metro Line 13 (Mumbai Metro Purple Line): Stations, Route, And Status". Times Property. 12 September 2023. Retrieved 6 October 2023.
- ↑ Pant, Manish (7 December 2022). "EXCLUSIVE: Maharashtra land acquisition for country's first bullet train nears completion as project returns on fast track". Business Today. Retrieved 6 October 2023.