Boeing 737 MAX
A white plane with a navy blue eskimo on the tail and the word "Alaska" painted across the fuselage, in-flight over a blue sky
Alaska Airlines Boeing 737 MAX 9
Role Narrow-body jet airliner
National origin United States
Manufacturer Boeing Commercial Airplanes
First flight January 29, 2016[1]
Introduction May 22, 2017, with Malindo Air[2]
Status In service
Primary users Southwest Airlines
Produced 2014–present[n 1][4]
Number built 1,420 as of December 2023[5]
Developed from Boeing 737 Next Generation

The Boeing 737 MAX is the fourth generation of the Boeing 737, a narrow-body airliner manufactured by Boeing Commercial Airplanes, a division of American company Boeing. It succeeds the Boeing 737 Next Generation (NG) and competes with the Airbus A320neo family. The new series was announced on August 30, 2011. It took its maiden flight on January 29, 2016 and was certified by the United States Federal Aviation Administration (FAA) in March 2017. The first delivery was a MAX 8 in May 2017 to Malindo Air, with which it commenced service on May 22, 2017.

The 737 MAX is based on earlier 737 designs, with more efficient CFM International LEAP engines, aerodynamic changes including distinctive split-tip winglets, and airframe modifications. The 737 MAX series has been offered in four variants, offering 138 to 204 seats in typical two-class configuration, and a range of 3,300 to 3,850 nautical miles [nmi] (6,110 to 7,130 km; 3,800 to 4,430 mi). The 737 MAX 7, MAX 8, and MAX 9 are intended to replace the 737-700, -800, and -900 respectively, and a further-stretched 737 MAX 10 is available. As of December 2023, the 737 MAX has 4,783 unfilled orders and 1,420 deliveries.

The 737 MAX suffered a recurring failure in the Maneuvering Characteristics Augmentation System (MCAS), causing two fatal crashes, Lion Air Flight 610 and Ethiopian Airlines Flight 302, in which 346 people died. It was subsequently grounded worldwide from March 2019 to November 2020, with the FAA garnering criticism for being the last major authority to ground it.[6] Investigations faulted a Boeing cover-up of a defect and lapses in the FAA's certification of the aircraft for flight.[7] The accidents and grounding cost Boeing an estimated $20 billion in fines, compensation and legal fees as of 2020, with indirect losses of more than $60 billion from 1,200 cancelled orders.[8][9][10] In 2021, Boeing also paid US$2.5 billion in penalties and compensation to settle the DOJ's fraud conspiracy case against the company.[11][12] Further investigations also revealed that the FAA and Boeing had colluded on recertification test flights, attempted to cover up important information and that the FAA had retaliated against whistleblowers.[7]

The FAA cleared the return to service on November 18, 2020, subject to mandated design and training changes. Canadian and European authorities followed in late January 2021. Chinese authorities were among the last to lift the grounding in December 2021, at which time, over 180 countries out of 195 had cleared the 737 MAX to return to service.

In January 2024, the FAA mandated the grounding and inspections of all 737 MAX 9s with a configuration similar to that of Alaska Airlines Flight 1282, which suffered a mid-flight blow out of a door plug at an unused emergency exit, causing uncontrolled decompression of the aircraft.

Development

Background

In 2006, Boeing started considering the replacement of the 737 with a "clean sheet" design that could follow the Boeing 787 Dreamliner.[13] In June 2010, a decision on this replacement was postponed until 2011.[14]

On December 1, 2010, Boeing's competitor, Airbus, launched the Airbus A320neo family to improve fuel economy and operating efficiency with new engines: the LEAP from CFM International and the PW1000G from Pratt & Whitney.[15] In February 2011, Boeing CEO Jim McNerney said, "We're going to do a new airplane."[16] At the time, the company had been developing a new aircraft to replace the 737 as part of its Yellowstone Project.[17][18] In March 2011, Boeing Commercial Airplanes President James Albaugh told participants of a trade meeting that the company was not sure about a 737 re-engine, as Boeing CFO James A. Bell had said at an investor conference the same month.[19] The Airbus A320neo gathered 667 commitments at the June 2011 Paris Air Show bringing its order backlog to 1,029 units, setting an order record for a new commercial airliner.[20]

On July 20, 2011, American Airlines announced an order for 460 narrowbody jets including 130 A320ceo (current engine option), 130 A320neo, 100 737NG and intended to order 100 re-engined 737s with CFM LEAP if Boeing pursued the project.[21] The order broke Boeing's long-time monopoly with American.[22]

Program launch

The 737 MAX 9 mockup at the 2012 ILA Berlin

Faced with the news of record orders for Airbus and the defection of a long-time loyal customer, on August 30, 2011, Boeing's board of directors approved the launch of the re-engined 737, expecting a 4% lower fuel burn than the Airbus A320neo.[23] Studies for additional drag reduction were performed during 2011, including revised tail cone, natural laminar flow nacelle, and hybrid laminar flow vertical stabilizer.[24] To focus on the re-engine project, Boeing abandoned the development of a new design under its Yellowstone Project.[25] Boeing expected the 737 MAX to meet or exceed the range of the Airbus A320neo.[26] Firm configuration for the 737 MAX was scheduled for 2013.[27]

In March 2010, the estimated cost to re-engine the 737, according to Mike Bair, Boeing Commercial Airplanes' vice president of business strategy and marketing, would be US$2–3 billion, including the CFM engine development. During Boeing's Q2 2011 earnings call, CFO James Bell said the development cost for the airframe only would be 10–15% of the cost of a new program, which was estimated at US$10–12 billion at the time. Bernstein Research predicted in January 2012, that this cost would be twice that of the A320neo.[28] The MAX development cost could have been well over the internal target of US$2 billion, and closer to US$4 billion.[29] Fuel consumption is reduced by 14% from the 737NG.[30] Southwest Airlines was signed up as the launch customer in 2011.[31]

In November 2014, McNerney said the 737 would be replaced by a new airplane by 2030—probably using composite materials—that would be slightly bigger and have new engines but would retain the 737's general configuration.[32]

Production

Roll-out of the first Boeing 737 MAX in December 2015

On August 13, 2015, the first 737 MAX fuselage completed assembly at Spirit Aerosystems in Wichita, Kansas, for a test aircraft that would eventually be delivered to launch customer Southwest Airlines.[33] On December 8, 2015, the first 737 MAX—a MAX 8 named Spirit of Renton—was rolled out at the Boeing Renton Factory.[34][35][36]

Because GKN could not produce the titanium honeycomb inner walls for the thrust reversers quickly enough, Boeing switched to a composite part produced by Spirit to deliver 47 MAXs per month in 2017. Spirit supplies 69% of the 737 airframe, including the fuselage, thrust reverser, engine pylons, nacelles, and wing leading edges.[37]

A new spar-assembly line with robotic drilling machines was expected to increase throughput by 33%. The Electroimpact automated panel assembly line sped up the wing lower-skin assembly by 35%.[38] Boeing planned to increase its 737 MAX monthly production rate from 42 planes in 2017, to 57 planes by 2019.[39] The new spar-assembly line is designed by Electroimpact.[40] Electroimpact has also installed fully automated riveting machines and tooling to fasten stringers to the wing skin.[41]

The rate increase strained the production and by August 2018, over 40 unfinished jets were parked in Renton, awaiting parts or engine installation, as CFM engines and Spirit fuselages were delivered late.[42] After parked airplanes peaked at 53 at the beginning of September, Boeing reduced this by nine the following month, as deliveries rose to 61 from 29 in July and 48 in August.[43]

On September 23, 2015, Boeing announced a collaboration with Comac to build a completion and delivery facility for the 737,[44] in Zhoushan, China,[45] the first outside the United States.[46] This facility initially handles interior finishing only, but will subsequently be expanded to include paintwork. The first aircraft was delivered from the facility to Air China on December 15, 2018.[47]

The largest part of the suppliers cost are the aerostructures at US$10–12 million (35-34% of the US$28.5−35 million total), followed by the engines at US$7−9 million (25-26%), systems and interiors at US$5–6 million each (18-17%), then avionics at US$1.5–2 million (5-6%).[48]

Flight testing and certification

The first flight took place on January 29, 2016, at Renton Municipal Airport,[49] nearly 49 years after the maiden flight of the original 737-100, on April 9, 1967.[1] The first MAX 8, 1A001, was used for aerodynamic trials: flutter testing, stability and control, and takeoff performance-data verification, before it was modified for an operator and delivered. 1A002 was used for performance and engine testing: climb and landing performance, crosswind, noise, cold weather, high altitude, fuel burn and water-ingestion. Aircraft systems including autoland were tested with 1A003. 1A004, with an airliner layout, flew function-and-reliability certification for 300 hours with a light flight-test instrumentation.[50]

The 737 MAX gained FAA certification on March 8, 2017,[51][52] and in the same month was approved by EASA on March 27, 2017.[53] After completing 2,000 test flight hours and 180-minute ETOPS testing requiring 3,000 simulated flight cycles in April 2017, CFM International notified Boeing of a possible manufacturing quality issue with low pressure turbine (LPT) discs in LEAP-1B engines.[54] Boeing suspended 737 MAX flights on May 4,[55] and resumed flights on May 12.[56]

During the certification process, the FAA delegated many evaluations to Boeing, allowing the manufacturer to review their own product.[49][57] It was widely reported that Boeing pushed to expedite approval of the 737 MAX to compete with the Airbus A320neo, which hit the market nine months ahead of Boeing's model.[58]

Entry into service

The Boeing 737 MAX 8 entered service with Lion Air's subsidiary Malindo Air (wearing Batik Air Malaysia livery)

The first delivery was a MAX 8, handed over to Malindo Air (a subsidiary of Lion Air) on May 16, 2017; it entered service on May 22.[2] Norwegian Air International was the second airline to put a 737 MAX into service, when it performed its first transatlantic flight with a MAX 8 named Sir Freddie Laker on July 15, 2017, between Edinburgh Airport in Scotland and Bradley International Airport in the U.S. state of Connecticut.[59]

Boeing aimed for 737 MAX to match the 99.7% dispatch reliability of the 737 Next Generation (NG).[60] Southwest Airlines, the launch customer, took delivery of its first 737 MAX on August 29, 2017.[61] Boeing planned to deliver at least 50 to 75 aircraft in 2017, 10–15% of the more than five hundred 737s to be delivered in the year.[55]

Grounding and recertification

Some of the dozens of undelivered 737 MAX aircraft parked at Boeing Field in Seattle after the type was grounded by the FAA to allow its MCAS redesign, 2019

In 2019, the Boeing 737 MAX was grounded worldwide after a flight control system caused two new aircraft to crash in Indonesia (Lion Air Flight 610 on October 29, 2018) and Ethiopia (Ethiopian Airlines Flight 302 on March 10, 2019), killing all 346 people on board both flights.[62] China became the first air authority to ground the aircraft on March 11, 2019, setting a worldwide precedent as Singapore, India, Turkey, South Korea, the European Union, Australia and Malaysia followed the next day. The United States Federal Aviation Administration was one of the last to ground the aircraft, defending against groundings by issuing a Continued Airworthiness Notice to operators on March 11, garnering widespread controversy before finally grounding it on March 13, 2019. Investigations faulted a Boeing cover-up of a defect and lapses in the FAA's certification of the aircraft for flight. After being charged with fraud, Boeing settled to pay over US$2.5 billion in penalties and compensation. Further investigations also revealed that the United States Federal Aviation Administration and Boeing had colluded on recertification test flights, attempted to cover up important information and that the FAA had retaliated against whistleblowers.[7]

As Boeing faced layoffs and pressures for cost-cutting, the Boeing's 737 MAX software was reportedly outsourced to temporary workers and subcontractors, often utilizing recent college graduates from countries like India. The outsourcing raised concerns among Boeing engineers, as the software development became less efficient and more prone to errors. Boeing denied relying on these contractors for crucial systems linked to the 737 MAX accidents but acknowledged the use of global contractors.[63][64][65][66]

In the twenty months during the grounding, Boeing redesigned the computer architecture that supported the Maneuvering Characteristics Augmentation System (MCAS) while investigations faulted aircraft design and certification lapses. Flawed information from a single external sensor fed into the system caused it to repeatedly push the planes' noses down as pilots struggled to keep them in the air before both crashes.[67] Boeing faces legal and financial consequences, as no deliveries of the MAX could be made while the aircraft was grounded, and airlines canceled more orders than Boeing produced during this period. Boeing found foreign object debris in the fuel tanks of 35 of 50 grounded 737 MAX aircraft that were inspected, and had to check the remainder of the 400 undelivered planes.[68] Boeing had similar problems with 787s produced in South Carolina.[69] The FAA curtailed Boeing's delegated authority and invited global aviation stakeholders to comment on pending changes to the aircraft and to pilot training. The FAA lifted its grounding order in 2020;[70] all aircraft must be repaired to comply with various airworthiness directives.[71]

After being charged with fraud in connection of both crashes of the 737 MAX, Boeing settled by paying over $2.5 billion: a criminal monetary penalty of $243.6 million (10%), $1.77 billion in damages to airline customers (70%), and $500 million to a crash-victim beneficiaries fund (20%).[11][12] In April 2022, families of U.S. crash victims began petitioning a U.S. federal judge in Texas to scrap the settlement and reopen the criminal case, arguing that the U.S. Department of Justice (USDOJ) violated the Crime Victims' Rights Act in settling without consulting with the families, and that the USDOJ should not have agreed to shield senior Boeing executives from prosecution. USDOJ prosecutors assert that the settlement is lawful because it cannot be proven that a crime was committed against the crash victims.[72] On December 15, 2023, an appeals court ruled against the victims, describing the agreement as "careful".[73]

As part of the investigation by the FAA and the congressional committee, Boeing released internal emails where Boeing pilots noted "This airplane is designed by clowns, who in turn are supervised by monkeys", in discussing the 737 MAX.[74] Boeing spokespeople noted, in response to the release of this communication that it regretted its contents and had made changes to enhance safety processes, organizations, and culture.

Production slowdown and suspension

From mid-April 2019, Boeing announced that it was temporarily cutting production of the 737 aircraft from 52 per month to 42 amid the 737 MAX groundings.[75] Production of the LEAP-1B engine continued at an unchanged rate, enabling CFM to catch up its backlog within a few weeks.[76] As the 737 MAX recertification moved into 2020, Boeing suspended production from January to conserve funds and prioritize stored aircraft delivery.[77][78] The 737 MAX program was the company's largest source of profit.[79] Around 80% of the 737 production costs involve payments to parts suppliers, which may be as low as US$10 million per plane.[80] After the announcement, Moody's cut Boeing's debt ratings in December, citing the rising costs due to the grounding and the production halt including financial support to suppliers and compensation to airlines and lessors which could lower the program's margins and cash generation for years.[81] The rating agency also warned that the production halt would have wide and harmful impact to the whole aerospace and defense supply chain and the ramp-up would be slower than previously anticipated.[82] CFM International reduced production of the LEAP-1B for the 737 MAX, in favor of the LEAP-1A for the Airbus A320neo, but was prepared to meet demand for both aircraft.[83]

Boeing did not publicly say how long the suspension would last. The last pre-suspension fuselages entered final assembly in early January 2020. Boeing was reported to internally expect production to be halted for at least 60 days.[84] Industry observers began to question if Boeing's projection of record production rate of 57 per month would ever be reached.[85] In early April, the COVID-19 pandemic led Boeing to shut down its other airliner production lines[86] and further delayed recertification of the MAX.[87]

Recertification and return to service

The Brazilian low-cost carrier Gol was the first to resume 737 MAX revenue flight on December 9, 2020

In early January 2020, an issue was discovered in the MAX software update, which impacted its recertification effort.[88] As of mid-January, Boeing expected the MAX to return to service by mid-2020.[89] In late April, following the COVID-19 pandemic, Boeing then hoped to win regulatory approval by August 2020.[90] Between June 29 and July 1, the FAA and Boeing conducted a series of recertification test flights.[91] Transport Canada and EASA each concluded their own independent recertification flights in late August and early September. On November 18, the FAA announced that the MAX had been cleared to return to service. Before individual aircraft could resume service, repairs were required as set out in an airworthiness directive from the FAA. Airline training programs also required approval.[92]

On December 3, American Airlines made a demonstration flight for journalists to explain the FAA-required modifications, to regain public trust.[93] The first airline to resume regular passenger service was Brazilian low-cost Gol on December 9.[94] The first in the United States was American Airlines on December 29.[95]

Transport Canada and EASA both cleared the MAX in late January 2021, subject to additional requirements.[96][97] Other regulators worldwide progressively ungrounded the aircraft, including those in the UAE, Australia, Kenya, and Brazil. The Indian Directorate General of Civil Aviation (DGCA) rescinded its ban on MAX airplanes in late August on the condition that they meet the requirements set by the FAA and EASA.[98] China's civil aviation regulator (CAAC) cleared the 94 jets stored by 11 carriers in China to fly again in December 2021. Deliveries of Chinese airplanes stored by Boeing is expected to resume in 4Q 2023. However, EASA forbade airlines from performing RNP AR approaches with the MAX.[99]

Production ramp-up and recovery

In late January 2020, production was expected to restart in April and take a year and a half to clear the inventory of 400 airplanes, ramping up slowly and building over time: Boeing might have delivered 180 stored jets by year-end and produce an equal number.[100] Boeing did not disclose any possible effect on deliveries caused by the FAA's withdrawal of Boeing's delegated authority to certify the airworthiness of each aircraft.[101] MAX supplier Spirit AeroSystems said it does not expect to return production rate to 52 per month until late 2022.[102] On May 27, Boeing resumed 737 MAX production at a low production rate, with the rate planned to increase towards 31 per month in 2021.[3] On August 19, Boeing announced that it had received new orders for the 737 MAX for the first time in 2020. Per a statement from the company, Poland's Enter Air SA entered into an agreement to buy up to four 737s.[103][104] On October 28, Boeing indicated that it expected to deliver about half of the 450 stockpiled aircraft in 2021, and the majority of the remainder in 2022, noting that some of these aircraft will need to be re-marketed and potentially reconfigured. The delivery rate will also condition the production rate for new aircraft, to avoid compounding the problem.[105] In November, Boeing saw more than 1,000 order cancelations since the grounding in March 2019.[92] Some of these already-built aircraft have seen their order canceled and Boeing is working to find new customers to take delivery.[106]

In late January 2022, Boeing's Chief Financial Officer said the 737 program was producing at a rate of 27 aircraft a month and was on track to ramp up the production.[107] On March 4, Boeing reportedly had preliminary plans to ramp up production of the 737 MAX aircraft to about 47 a month by the end of 2023 as the company looked to extend its recovery from successive crises.[107] On July 12, the company said it had met its goal of increasing 737 production to 31 per month when it reported its June order and delivery tally.[108] In September, however, the company noted that it was regularly having to pause production due to component shortages and other supply chain problems.[109]

In late January 2023, Boeing announced that a fourth production line would open at the Boeing Everett Factory in Everett, Washington. The line will replace the discontinued Boeing 787 line at the factory.[110][111]

Certification of the MAX 7 and MAX 10

Following the recertification of the MAX 8 and MAX 9, Boeing resumed work to certify the MAX 7 and MAX 10.

In March 2022, there were rumors that Boeing would request an exemption from the U.S. Aircraft Safety and Certification Reform Act of 2020, a safety reform law passed in response to the MAX crashes. The act requires airliners to be fitted with an engine-indicating and crew-alerting system (EICAS) if type certificated after December 31, 2022. Adding this feature would make the MAX 10 different from other MAX variants, necessitating additional training for pilots.[112]

In November 2022, Boeing announced expected delays to the certification of the MAX 7 and MAX 10, now expected in early 2023 and early 2024 respectively.[113] In December, two proposals to exempt the MAX 7 and MAX 10 from the new requirements were considered for inclusion in a U.S. defense spending bill—one a simple two-year extension to the deadline, the second an exemption for aircraft whose certification applications were submitted before the law was enacted, combined with some equipment changes[114]—but neither proposal was included in the final spending bill.[115] In December 2022, the U.S. Congress agreed on a bill allowing Boeing to certify the MAX 7 and MAX 10 without EICAS, but it must install a third angle-of-attack sensor in all 737 MAX types as previously demanded by European and Canadian regulators. The company also must install a switch to disable the stick shaker, which distracted pilots during the MAX crashes. Boeing would have to retrofit these design changes to all 737 MAXs already delivered in Canada, Europe, and the U.S. within three years of MAX 10 certification.[116][117] Boeing is seeking to get exemptions for the MAX 7 to allow it to enter service.[118]

Replacement airliner

In November 2014, Boeing talked about developing a clean sheet aircraft to replace the 737. The conceived aircraft was to have a fuselage similar to the 737 though slightly larger, and would make use of the advanced composite technology developed for the 787 Dreamliner.[119] Boeing also considered a parallel development along with the 757 replacement, similar to the development of the 757 and 767 in the 1970s.[120]

Design

In mid-2011, one design objective was matching fuel burn of the 737 MAX to that of the Airbus A320neo's 15% fuel-burn advantage. The initial 737 MAX reduction was 10–12%; it was later enhanced to 14.5%. The fan was widened from 61 inches (150 cm) to 69.4 in (176 cm) by raising the nose gear and placing the engine higher on the wing and further forward. The split tip winglet added 1–1.5% fuel burn reduction and a re-lofted tail cone another 1%. Electronically controlling the bleed air system improved efficiency. The new engine nacelle included chevrons, similar to those of the Boeing 787, which also helped to reduce engine noise.[121]

Aerodynamic changes

Boeing's new split-tip winglet on the 737 MAX

The 737 MAX uses a split-tip winglet, designed to reduce vortex drag, which improves fuel efficiency[122] by maximizing lift, while staying in the same ICAO aerodrome reference code letter C gates as current Boeing 737s.[123] It resembles a three-way hybrid of a blended winglet, wingtip fence, and raked wingtip. A split-tip wingtip was first proposed for the McDonnell Douglas MD-12, a 1990s twin-deck aircraft concept.[123] A MAX 8 with 162 passengers on a 3,000-nautical-mile (5,600 km; 3,500 mi) flight is projected to have a 1.8% lower fuel burn than a blended winglet-equipped aircraft (like many 737NG aircraft) and 1% lower over 500 nmi (930 km; 580 mi) at Mach 0.79.[123] The new winglet has a total height of 9 feet 6 inches (2.90 m).[124]

Other improvements include a re-contoured tail cone, revised auxiliary power unit inlet and exhaust, aft body vortex generator removal, and other small aerodynamic improvements.[30]

The engines on the 737 MAX were also repositioned, the top of the new engine slightly higher than the top surface of the wing, resulting in a change to the aerodynamic characteristics of the airframe. Due to the aircraft's close proximity to the ground, the larger and more fuel-efficient engines did not have enough clearance. As a result, the engines were mounted higher on the wings and further forward, changing the aerodynamic characteristics of the aircraft compared to the 737NG.[125] The MCAS software-based flight control law was implemented to account for the undesirable aerodynamic changes.[125]

Structural and other changes

The 8-inch (20 cm) taller nose-gear strut maintains the same 17-inch (43 cm) ground clearance of previous 737 engine nacelles.[30] New struts and nacelles for the heavier engines add bulk, the main landing gear and supporting structure have been reinforced, and fuselage skins are thicker in some places—thus adding 6,500 pounds (2,900 kg) to the MAX 8's empty aircraft weight.[30] To preserve fuel and payload capacity, its maximum takeoff weight is 7,000 lb (3,200 kg) heavier.[30]

Rockwell Collins was selected to supply four 15.1 in (380 mm) landscape liquid crystal displays (LCD), as used on the 787, to improve pilots' situation awareness and efficiency.[126] Boeing plans no major modifications for the 737 MAX flight deck, as it wants to maintain commonality with the 737 Next Generation family. Boeing Commercial Airplanes CEO Jim Albaugh said in 2011, that adding more fly-by-wire control systems would be "very minimal".[127] However, the 737 MAX extended spoilers are fly-by-wire controlled.[124] Most of the systems are carried from the 737NG to allow for a short differences-training course to upgrade flight crews.[30]

In addition to the Speed Trim System (STS), the automatic stabilizer control system has been enhanced to include MCAS. Compared to STS, MCAS has greater authority and cannot be disengaged with the aft and forward column cutout switches. The center console stabilizer-trim cutout switches have been re-wired. Unlike previous versions of the 737, the automatic stabilizer trim control functions cannot be turned off while retaining electric trim switches functionality.[128]

MCAS was deemed necessary by Boeing to meet its internal objective of minimizing training requirements for pilots already qualified on the 737NG. MCAS was to automatically mitigate the pitch-up tendency of the new flight geometry due to the engines being located farther forward and higher than on previous 737 models.[129] During a reassessment of the aircraft in February 2020, both FAA and EASA determined that the stability and stall characteristics of the plane would have been acceptable with or without MCAS.[130]

As a production standard, the 737 MAX features the Boeing Sky Interior with overhead bins and LED lighting based on the Boeing 787's interior.[131]

Engines

CFM LEAP engine nacelle with chevrons for noise reduction

In 2011, the CFM LEAP-1B engine was initially 10–12% more efficient than the previous 61-inch (156 cm) CFM56-7B of the 737NG.[132] The 18-blade, woven carbon-fiber fan enables a 9:1 bypass ratio (up from 5.1:1 with the previous 24-blade titanium fan) for a 40% smaller noise footprint.[30] The CFM56 bypass ranges from 5.1:1 to 5.5:1.[133] The two-spool design has a low-pressure section comprising the fan and three booster stages driven by five axial turbine stages and a high-pressure section with a 10-stage axial compressor driven by a two-stage turbine.[30] The 41:1 overall pressure ratio increased from 28:1, and advanced hot-section materials enabling higher operating temperatures permit a 15% reduction in thrust-specific fuel consumption (TSFC), along with 20% lower carbon emissions, 50% lower nitrogen-oxide emissions, though each engine weighs 849 pounds (385 kg) more at 6,129 pounds (2,780 kg).[30]

In August 2011, Boeing had to choose between 66-inch (168 cm) or 68-inch (173 cm) fan diameters, necessitating landing gear changes to maintain a 17 in (43 cm) ground clearance beneath the new engines; Boeing Commercial Airplanes chief executive officer Jim Albaugh stated "with a bigger fan you get more efficiency because of the bypass ratio [but also] more weight and more drag", with more airframe changes.[134]

In November 2011, Boeing selected the larger fan diameter, necessitating a 6–8 in (15–20 cm) longer nose landing gear.[135][136] In May 2012, Boeing further enlarged the fan to 69.4 in (176 cm), paired with a smaller engine core within minor design changes before the mid-2013 final configuration.[137][138]

The nacelle features chevrons for noise reduction like the 787.[139] A new bleed air digital regulator will improve its reliability.[140] The new nacelles being larger and more forward possess aerodynamic properties which act to further increase the pitch rate. The larger engine is cantilevered ahead of and slightly above the wing, and the laminar flow engine nacelle lipskin is a GKN Aerospace one-piece, spun-formed aluminum sheet inspired by the 787.[124]

Operational history

After one year of service, 130 MAXs had been delivered to 28 customers, logging over 41,000 flights in 118,000 hours and flying over 6.5 million passengers. Flydubai observed 15% more efficiency than the NG, more than the 14% promised, and dependability reached 99.4%. Long routes include 24 over 2,500 nautical miles (4,630 km; 2,877 mi), including a daily Aerolíneas Argentinas service from Buenos Aires to Punta Cana over 3,252 nmi (6,023 km; 3,742 mi).[141]

In 2019, Moody's had estimated Boeing's operating margin to be US$12–15 million for each 737 MAX 8 at its list price of $121.6 million (~$138 million in 2022), although the list price is usually discounted 50–55% in practice. This high margin was made possible by the efficiencies of production volume and the amortization of development costs and capital investment over the decades of the program run. However, costs have since risen significantly and the margin reduced following the two crashes, the FAA grounding, and the severe disruption to production.[142][143] Boeing estimated it would cost an additional $6.3 billion to produce the remaining 737 MAX program, $4 billion for "future abnormal costs" as production restarted, plus an estimated $8.3 billion for concessions and compensation to customers.[144][145][146] The rising costs also led Moody's to downgrade Boeing's credit rating.[81]

Variants

The 737-700, -800 and -900ER, the most widespread versions of the previous 737NG,[147] are succeeded by the 737 MAX 7, MAX 8 and MAX 9, respectively[148] (FAA type certificate and marketing designation (since 2020):[103] 737-7, -8, and -9[51]). The 737 MAX 8 entered service in May 2017,[2] the MAX 9 entered service in March 2018,[149] and the MAX 200 (a high-density version of the MAX 8) entered service in June 2021.[150] Deliveries for the MAX 7 and the MAX 10 are expected to begin in 2024, after years of delays.[151]

In February 2018, Boeing forecast that 60–65% of demand for the airliner would be for the 737 MAX 8 variant, 20–25% for the MAX 9 and MAX 10, and 10% for the MAX 7.[152]

737 MAX 7

Boeing 737 MAX 7 at the 2018 Farnborough Airshow

At the July 2016 Farnborough Air Show, Boeing announced that the MAX 7, originally based on the 737-700, will accommodate two more seat rows than the 737-700 for 138 seats.[153][154] Compared to the 737-700, the MAX 7 has a pair of over-wing exits rather than the single-door, a 46-inch longer aft fuselage and a 30-inch longer forward fuselage, structural re-gauging and strengthening, and systems and interior modifications to accommodate the longer length.[155] The MAX 7 also uses the same wing and landing gear as the MAX 8. It is expected to fly 1,000 nmi (1,900 km; 1,200 mi) farther than the -700 with 18% lower fuel costs per seat. Boeing predicts that the MAX 7 will carry 12 more passengers 400 nmi (740 km; 460 mi) farther than A319neo with seven percent lower operating costs per seat.[156]

Production on the first 65-foot-long (20 m) wing spar for the 737-7 began in October 2017.[157] Assembly of the first flight-test aircraft began on November 22, 2017,[158] and was rolled out of the factory on February 5, 2018.[159] The MAX 7 took off for its first flight on March 16, 2018, from the factory in Renton, Washington, and flew for three hours over Washington state.[160] It reached 250 knots (460 km/h) and 25,000 ft (7,600 m), performed a low approach, systems checks and an inflight engine restart, and landed at Boeing's flight test center in Moses Lake, Washington.[161]

Entry into service with launch operator Southwest Airlines was originally expected in January 2019.[157] WestJet also converted its order for MAX 7s, originally due for delivery in 2019, into MAX 8s, not expecting to take any MAX 7s until at least 2021.[162] In March 2021, Southwest placed an order for 100 MAX 7s[163] and exercised options for another 34 in 2021,[164] bringing their total orders to 234; WestJet had 22.[156] In July 2022, Southwest announced that it did not expect to receive any MAX 7 aircraft until 2023 due to the ongoing certification delays and that it would instead take delivery of MAX 8 aircraft in the interim.[165] That same November, Boeing announced that it expects MAX 7 certification in early 2023.[113] By October 2023, deliveries were anticipated in early 2024.[166] Southwest Airlines said in November 2023 that it expected to begin flying the aircraft in revenue service by November 2024.[167]

737 MAX 8

A top view of the 737 MAX 8 showing double overwing exits

The first variant developed in the 737 MAX series, the MAX 8 replaces the 737-800 with a longer fuselage than the MAX 7. In 2016, Boeing planned to improve its range from 3,515 nautical miles (6,510 km; 4,045 mi) to 3,610 nmi (6,690 km; 4,150 mi) after 2021.[168] On July 23, 2013, Boeing completed the firm configuration for the 737 MAX 8.[169] The MAX 8 has a lower empty weight and higher maximum takeoff weight than the A320neo. During a test flight conducted for Aviation Week, while cruising at a true airspeed of 449 knots (517 mph; 832 km/h) and a weight of 140,500 pounds (63,700 kg), at a lower than optimal altitude (FL350 vs. the preferred FL390) and with an "unusually far forward" center of gravity, the test aircraft consumed 4,460 lb (2,020 kg) of fuel per hour.[30]

The Boeing 737 MAX 8 completed its first flight test in La Paz, Bolivia. The 13,300-foot (4,100 m) altitude at El Alto International Airport tested the MAX's capability to take off and land at high altitudes.[170] Its first commercial flight was operated by Malindo Air on May 22, 2017, between Kuala Lumpur and Singapore as Flight OD803.[2] In early 2017, a new -8 was valued at $52.85 million, rising to below $54.5 million by mid 2018.[171]

737 MAX 8-200

A 737 MAX 8-200 of Ryanair with the extra pair of exit doors

In September 2014, Boeing launched a high-density version of the 737 MAX 8, the 737 MAX 8-200, named for seating for up to 200 passengers in a single-class high-density configuration with slimline seats; an extra pair of exit doors is required because of the higher passenger capacity. Boeing states that this version would be 20% more cost-efficient per seat than current 737 models and would be the most efficient narrow-body on the market when delivered, including 5% lower operating costs than the 737 MAX 8.[172][173] Three of eight service trolleys are removed to accommodate more passenger space.[174] An order with Ryanair for 100 aircraft was finalized in December 2014.[175]

In mid-November 2018, the first of then 135 ordered by Ryanair rolled out, in a 197-seat configuration.[176] It was first flown from Renton on January 13, 2019,[177] and was due to enter service in April 2019, with another four MAX 200s expected later in 2019,[178] though certification and deliveries were deferred while the MAX was grounded. In November 2019, Ryanair informed its pilots that, due to an unspecified design issue with the additional over-wing exit doors, it did not expect to receive any MAX 200s until late April or early May 2020.[179] In 2020, at the height of the COVID travel slump, Ryanair renegotiated its order and purchased an additional 75 MAX 8-200 aircraft at one-third of the list price.[180]

The high-density variant was certified by the FAA on March 31, 2021.[181] Ryanair took delivery of its first MAX 8-200 in June 2021.[150] Besides launch customer Ryanair, other customers include International Airlines Group and low-cost airlines Akasa Air of India, Allegiant Air of the US, Arajet of the Dominican Republic and Vietnam's VietJet.[182]

Proposed 737-8ERX

Airlines have been shown a 737-8ERX concept based on the 737 MAX 8 with a higher 194,700-pound (88.3 t) maximum take-off weight and a longer range of 4,000 nautical miles (7,400 km; 4,600 mi) using the wings, landing gear, and central section from the MAX 9. The range of this aircraft would be closer to the Airbus A321LR, although with a smaller 150 seat capacity.[183]

737 MAX 9

737 MAX 9 first flight on April 13, 2017

The 737 MAX 9 replaces the 737-900 and has a longer fuselage than the MAX 8. In 2016, Boeing planned to improve its range from 3,510 nautical miles (6,500 km; 4,040 mi) to 3,605 nmi (6,676 km; 4,149 mi) after 2021.[168] Lion Air was the launch customer with an order for 201 in February 2012.[38] It made its roll-out on March 7, 2017, and first flight on April 13, 2017;[184] it took off from Renton Municipal Airport and landed at Boeing Field after a 2 hr 42 min flight.[185] It was presented at the 2017 Paris Air Show.[186]

Boeing 737-9 flight tests were scheduled to run through 2017, with 30% of the -8 tests repeated; aircraft 1D001 was used for auto-land, avionics, flutter, and mostly stability-and-control trials, while 1D002 was used for environment control system testing.[50] It was certified by February 2018.[187] Asian low-cost carrier Lion Air Group took delivery of the first on March 21, 2018, before entering service with Thai Lion Air.[149] As the competing A321neo attracts more orders, the sale value of a 737-9 is the same as a 2018 737-8 at $53 million (~$61.1 million in 2022).[188]

737 MAX 10

Boeing 737 MAX 10 prototype in its roll-out ceremony

Loyal customers, such as Korean Air and United Airlines, pressed Boeing, in order to compete with the Airbus A321neo, to develop a variant larger than the MAX 9, of which Boeing revealed studies in early 2016.[189] As the Airbus A321neo had outsold the MAX 9 five-to-one, the proposed MAX 10 included a larger engine, stronger wings, and telescoping landing gear in mid-2016.[190] In September 2016, it was reported that the variant would be simpler and lower-risk, with a modest stretch of 6–7 feet (1.83–2.13 m) for a length of 143–144 ft (43.6–43.9 m), seating 12–18 more passengers for 192–198 in a dual-class layout or 226-232 for a single class, needing an uprated 31,000 pounds-force (140 kN) LEAP-1B that could be available by 2019, or 2020, and would likely require a landing-gear modification to move the rotation point slightly aft.[191]

In October 2016, Boeing's board of directors granted authority to offer the stretched variant with two extra fuselage sections forward and aft with a 3,100 nautical miles (5,700 km; 3,600 mi) range, reduced from the 3,300 nmi (6,100 km; 3,800 mi) range of the MAX 9.[189] In early 2017, Boeing showed a 66 inches (1.7 m) stretch to 143 ft (44 m), enabling seating for 230 in a single class or 189 in two-class capacity, compared to 193 in two-class seating for the A321neo. The modest stretch of the MAX 10 enables the aircraft to retain the existing wing, and the Leap 1B engine from the MAX 9 with a trailing-link main landing gear as the only major change.[192] Boeing 737 MAX Vice President and General Manager Keith Leverkuhn said the design had to be frozen in 2018, for a 2020 introduction.[189]

Boeing hopes that 737 operators and 737 MAX customers like United Airlines, Delta Air Lines, Alaska Airlines, Air Canada, Lion Air, and Chinese airlines will be interested in the new variant.[193] Boeing predicts a 5% lower trip cost and seat cost compared to the A321neo.[194] Air Lease Corporation wants it a year sooner; its CEO John Pleuger stated, "It would have been better to get the first airplane in March 2019, but I don't think that's possible."[195] AerCap CEO Aengus Kelly is cautious and said the -9 and -10 "will cannibalize each other".[189]

The 737 MAX 10 was launched on June 19, 2017, with 240 orders and commitments from more than ten customers.[196][197] United Airlines will be the largest 737 MAX 10 customer, converting 100 of their 161 orders for the MAX 9 into orders for the MAX 10.[198] Boeing ended the 2017 Paris Air Show with 361 orders and commitments, including 214 conversions, from 16 customers,[199] including 50 orders from Lion Air.[200]

The variant configuration was firmed up by February 2018,[201] and by mid-2018, the critical design review was completed. As of August 2018, assembly was underway with a first flight planned for late 2019. The semi-levered landing gear design has a telescoping oleo-pneumatic strut with a down-swinging lever to permit 9.5 inches (24 cm) taller gear. Driven by the existing retraction system, a shrink-link mechanical linkage mechanism at the top of the leg, inspired by carrier aircraft designs, allows the gear to be drawn in and shortened while being retracted into the existing wheel well.[202][203] Entry into service was slated for July 2020.[204]

On November 22, 2019, Boeing unveiled the first MAX 10 to employees in its Renton factory, Washington, scheduled for the first flight in 2020.[205] At the time, 531 MAX 10s were on order, compared to 3,142 Airbus A321neos sold, capable of carrying 244 passengers or to fly up to 4,700 nautical miles (8,700 km; 5,400 mi) in its heaviest A321XLR variant.[206] The MAX 10 has similar capacity as the A321XLR, but shorter range and much poorer field performance, greatly hindering its potential to service smaller airports as compared to the A321XLR.[207]

By early 2021, Boeing expected 737 MAX 10 deliveries to start in 2023.[208] The variant made its maiden flight on June 18, 2021, initiating its flight test and certification program.[209]

On June 29, 2021, United Airlines placed an order for another 150 of the Boeing 737 MAX 10. These MAX 10s will replace a large number of United's older Boeing 757-200s.[210]

In September 2021, Ryanair failed to reach an agreement with Boeing over an order of MAX 10s, citing cost as a primary concern.[211] However, in May 2023, Ryanair announced the order of 150 MAX 10s and an option to purchase a further 150.[212]

In November 2022, Boeing Commercial Airplanes CEO Stanley Deal told investors at a conference that the MAX 10 was expected to enter service in 2024.[113] By October 2023, deliveries were anticipated in early 2025.[166]

Boeing Business Jet

The BBJ MAX 8 and BBJ MAX 9 are business jet variants of the 737 MAX 8 and 9, with new CFM LEAP-1B engines and advanced winglets providing 13% better fuel burn than the Boeing Business Jet; the BBJ MAX 8 has a 6,325 nautical miles (11,710 km; 7,280 mi) range, and the BBJ MAX 9 a 6,255 nmi (11,580 km) range.[213] The BBJ MAX 7 was unveiled in October 2016, with a 7,000 nmi (12,960 km; 8,060 mi) range and 10% lower operating costs than the original BBJ, while being larger.[214] The BBJ MAX 8 first flew on April 16, 2018, before delivery later the same year, and has a range of 6,640 nmi (12,300 km; 7,640 mi) with an auxiliary fuel tank.[215]

Operators

As of October 2023, the five largest operators of the Boeing 737 MAX were Southwest Airlines (207), United Airlines (145), Ryanair Holdings (126), Alaska Airlines (62), and American Airlines (54).[216]

Orders and deliveries

American Airlines was the first disclosed customer. By November 17, 2011, there were 700 commitments from nine customers, including Lion Air and SMBC Aviation Capital.[217][218] By December 2011, the 737 MAX had 948 commitments and firm orders from thirteen customers.[219] On September 8, 2014, Ryanair agreed to 100 firm orders with 100 options.[220] In January 2017, aircraft leasing company GECAS ordered 75.[221] By January 2019 the 737 MAX had 5,011 firm orders from 78 identified customers,[147] with the top three being Southwest Airlines with 280, flydubai with 251, and Lion Air with 251.[147] The first 737 MAX 8 was delivered to Malindo Air on May 16, 2017.[55]

Following the groundings in March 2019, Boeing suspended all deliveries of 737 MAX aircraft,[222] reduced production from 52 to 42 aircraft per month,[75] and on December 16, 2019, announced that production would be suspended from January 2020 to conserve cash.[77] At the time of the grounding, the 737 MAX had 4,636 unfilled orders[223] valued at an estimated $600 billion.[224][225] Boeing produced over 450 MAX aircraft awaiting delivery, about half of which are expected to be delivered in 2021, and the majority of the remainder in 2022.[105] By November 30, 2020, at the time of the ungrounding, the unfilled orders stood at 4,039 aircraft.[226] In November 2021, during the Dubai Airshow, Boeing received 72 firm orders from a new 737 MAX customer, India based Akasa Air,[227] to be fulfilled over a 4-year period with first delivery in June 2022.[228] In late January 2022 Boeing was working to clear the remaining inventory of 335 MAX aircraft and estimated most of them would be delivered by the end of 2023.[107] In December 2022, the 1000th 737 MAX was delivered.[5] In July 2023, Boeing first revealed the 737 MAX sub-type orders as follows: 2,751 MAX 8 (63%), 810 MAX 10 (19%), 344 MAX 200 (8%), 297 MAX 7 (7%), and 137 MAX 9 (3%).[229] As of December 2023, the 737 MAX has 4,783 unfilled orders and 1,420 deliveries.[5]

Boeing 737 MAX orders and deliveries[5]
2011201220132014201520162017201820192020202120222023Total
Orders150914708891410540774662[lower-alpha 1]−136[lower-alpha 2]−529[lower-alpha 3]375[lower-alpha 4]5618836,203
Deliveries7425657272453743871,420
  1. In 2018, there were 675 net orders for 737 program, of which 13 orders were for 737NG.[230]
  2. In 2019, there were 47 orders, but 183 cancellations of 737 MAX.[231]
  3. In 2020, there were 112 orders, but 641 cancellations of 737 MAX.[232]
  4. In 2021, there were 749 orders, but 374 cancellations of 737 MAX.[5]

Cumulative Boeing 737 MAX orders and deliveries

Orders

Deliveries

As of December 2023[5]

Accidents and incidents

Between March 2017 and March 2019, the global fleet of 387 aircraft operated 500,000 flights and experienced two fatal crashes, having a fatal accident rate of four accidents per million flights, whereas the previous Boeing 737 generations averaged 0.2 fatal accidents per million flights.[233]

Lion Air Flight 610

The 737 MAX 8 involved in the crash of Lion Air Flight 610

On October 29, 2018, Lion Air Flight 610, a 737 MAX 8, crashed into the Java Sea 13 minutes after takeoff from Soekarno–Hatta International Airport, Jakarta, Indonesia. The flight was a scheduled domestic flight to Depati Amir Airport, Pangkal Pinang, Indonesia. All 189 people on board died. This was the first fatal aviation crash and first hull loss of a 737 MAX. The aircraft had been delivered to Lion Air two months earlier.[234][235] People familiar with the investigation reported that during a flight piloted by a different crew on the day before the crash, the same aircraft experienced a similar malfunction but an extra pilot sitting in the cockpit jumpseat correctly diagnosed the problem and told the crew how to disable the malfunctioning MCAS flight-control system.[236] Indonesia's National Transportation Safety Committee released its final report into the crash on October 25, 2019,[237] attributing the crash to the MCAS pushing the aircraft into a dive due to data from a faulty angle-of-attack sensor. Following the Lion Air crash, Boeing issued an operational manual guidance, advising airlines on how to address erroneous cockpit readings.[238]

Ethiopian Airlines Flight 302

The 737 MAX 8 involved in the crash of Ethiopian Airlines Flight 302

On March 10, 2019, Ethiopian Airlines Flight 302, a 737 MAX 8, crashed approximately six minutes after takeoff from Addis Ababa, Ethiopia,[239] on a scheduled flight to Nairobi, Kenya,[240] killing all 149 passengers and 8 crew members on board. The aircraft was four months old at the time.[241] The cause of the crash was initially unclear, though the aircraft's vertical speed after takeoff was reported to be unstable.[242] Evidence retrieved on the crash site suggests, that at the time of the crash, the aircraft was configured to dive, similar to Lion Air Flight 610.[243] On April 4, Ethiopian transport minister Dagmawit Moges stated that the crew "performed all the procedures repeatedly provided by the manufacturer but was not able to control the aircraft."[244]

The similarity of the physical and flight data evidence from the accidents led to the global 737 MAX groundings beginning on the day of the second accident.[245]

Alaska Airlines Flight 1282

The 737 MAX 9 involved in the decompression of Alaska Airlines Flight 1282

On January 5, 2024, Alaska Airlines Flight 1282, a 737 MAX 9, suffered an uncontrolled decompression shortly after takeoff from Portland International Airport.[246] The MAX 9, like the 737-900ER, features a rear mid-cabin exit door on each side behind the wings that is required when used with dense seating configurations. On less densely configured aircraft, those exit doors are not required and door plugs are installed in their place, as was the case on this aircraft. During the climb, a door plug blew out, causing the decompression.[247]

The plane returned to Portland, and there were no fatalities or significant injuries among the 171 passengers and 6 crew on board. Some small personal belongings, along with cabin trim such as seat covers and headrests, were sucked out of the opening. According to some passengers, a child seated in row 25 had his shirt pulled off and sucked out of the aircraft while his mother held him.[248][249] The FAA, Boeing, Alaska Airlines, and the NTSB quickly acknowledged the accident and an investigation was launched.[250] As a precautionary measure, Alaska Airlines grounded their 737 MAX 9 aircraft fleet.[251] Hours later, the FAA ordered the grounding and inspection of 171 aircraft from the global 737 MAX 9 fleet with similar configuration to the incident aircraft, along with corrective action if necessary.[252] Alaska Airlines and United Airlines both reported finding loose door plug bolts on some of the aircraft inspected.[253]

Specifications

  1. Includes 737 MAX 200
  2. When configured as 737 MAX 200
  3. With eight auxiliary center fuel tanks: 10,921 US gal (41,340 L)  73,171 lb (33,190 kg)
  4. MAX 200: 2,700 nmi (5,000 km; 3,100 mi)[261]
  5. 1 2 With one auxiliary center fuel tank

See also

Related development

Aircraft of comparable role, configuration, and era

Notes

  1. Production halted between January and late May 2020[3]

References

  1. 1 2 "Boeing's 737 MAX takes wing with new engines, high hopes". The Seattle Times. January 29, 2016. Archived from the original on April 9, 2019. Retrieved January 29, 2016.
  2. 1 2 3 4 Hashim, Firdaus (May 22, 2017). "Malindo operates world's first 737 Max flight". FlightGlobal. Archived from the original on November 13, 2018. Retrieved May 22, 2017.
  3. 1 2 Hemmerdinger, Jon (May 27, 2020). "Boeing restarts 737 Max production". Flightglobal. Archived from the original on June 6, 2020. Retrieved May 29, 2020.
  4. "Production begins on first 737 MAX parts". Boeing Commercial Airplanes. October 13, 2014. Archived from the original on February 3, 2016. Retrieved January 29, 2016.
  5. 1 2 3 4 5 6 "Boeing: Orders and Deliveries (updated monthly)". Boeing. December 31, 2023. Archived from the original on January 12, 2021. Retrieved January 9, 2024.
  6. "The US is increasingly alone in not grounding the Boeing 737 Max". Quartz. March 13, 2019. Archived from the original on July 9, 2022. Retrieved September 12, 2022.
  7. 1 2 3 "FAA and Boeing manipulated 737 Max tests during recertification". The Verge. December 18, 2020. Archived from the original on July 10, 2022. Retrieved August 25, 2022.
  8. "FAA clears Boeing 737 Max to fly again 20 months after grounding over deadly crashes". November 18, 2020. Archived from the original on November 18, 2020. Retrieved November 18, 2020.
  9. Isidore, Chris (November 17, 2020). "Boeing's 737 Max debacle could be the most expensive corporate blunder ever". CNN. Archived from the original on December 21, 2020. Retrieved December 21, 2020.
  10. Gates, Dominic (November 18, 2020). "Boeing 737 MAX can return to the skies, FAA says". Archived from the original on November 30, 2020. Retrieved November 18, 2020.
  11. 1 2 "Boeing Charged with 737 Max Fraud Conspiracy and Agrees to Pay over $2.5 Billion" (Press release). The United States Department of Justice. January 7, 2021. Archived from the original on January 8, 2021. Retrieved January 8, 2021.
  12. 1 2 Gates, Dominic; Kamb, Lewis (January 7, 2021). "Boeing agrees to pay $2.5B+ to settle criminal fraud charges over 737 MAX". The Seattle Times. Archived from the original on January 10, 2021. Retrieved January 8, 2021.
  13. "Boeing firms up 737 replacement studies by appointing team". Flight International. FlightGlobal. March 3, 2006. Archived from the original on October 14, 2016. Retrieved July 17, 2016.
  14. Hamilton, Scott (June 24, 2010). "737 decision may slip to 2011: Credit Suisse". Flight International. FlightGlobal. Archived from the original on October 8, 2017. Retrieved May 14, 2017.
  15. "Airbus offers new fuel saving engine options for A320 Family". Airbus (Press release). December 1, 2010. Archived from the original on April 9, 2016. Retrieved May 14, 2017.
  16. Freed, Joshua (February 10, 2011). "Boeing CEO: 'new airplane' to replace 737". NBC News. Associated Press. Archived from the original on August 14, 2017. Retrieved August 14, 2017.
  17. Sanders, Peter; Cameron, Doug (January 26, 2011). "Boeing Confident on Deliveries This Year". Wall Street Journal. ISSN 0099-9660. Retrieved November 16, 2023.
  18. Ostrower, John (September 24, 2010). "Boeing patent may provide glimpse into 737 replacement plan". FlightGlobal. Archived from the original on October 6, 2014. Retrieved November 16, 2023.
  19. "Most airlines taking cautious approach to next gen aircraft". CAPA Centre for Aviation. April 11, 2011. Archived from the original on November 7, 2017. Retrieved November 3, 2017.
  20. "Airbus with new order record at Paris Air Show 2011". Airbus (Press release). June 23, 2011. Archived from the original on March 17, 2017. Retrieved May 14, 2017.
  21. "AMR Corporation Announces Largest Aircraft Order in History With Boeing and Airbus". American Airlines (Press release). July 20, 2011. Archived from the original on April 30, 2019. Retrieved April 30, 2019.
  22. Clark, Nicola (July 20, 2011). "Jet Order by American is a Coup for Boeing's Rival". The New York Times. Archived from the original on June 18, 2018. Retrieved March 12, 2019.
  23. "Boeing Launches 737 New Engine Family with Commitments for 496 Airplanes from Five Airlines" (Press release). Boeing. August 30, 2011. Archived from the original on October 4, 2015. Retrieved May 14, 2017.
  24. Ostrower, Jon (August 30, 2011). "More details emerge on configuration of re-engined 737". Flight International. FlightGlobal. Archived from the original on March 30, 2019. Retrieved September 5, 2011.
  25. O'Keeffe, Niall (September 12, 2011). "Caution welcomed: Boeing's 737 Max". Flight International. Archived from the original on December 30, 2013. Retrieved May 16, 2013.
  26. Ostrower, Jon (February 19, 2012). "Boeing says 737 Max to meet or exceed A320neo range". Air Transport Intelligence News. FlightGlobal. Archived from the original on February 17, 2012. Retrieved February 20, 2012.
  27. Ostrower, Jon (November 7, 2011). "Boeing completes initial review of 737 Max configuration". Air Transport Intelligence News. FlightGlobal. Archived from the original on November 8, 2011. Retrieved November 7, 2011.
  28. Hamilton, Scott (January 27, 2012). "Boeing disputes 737 Max development cost report". Air Transport Intelligence News. FlightGlobal. Archived from the original on October 8, 2017. Retrieved May 11, 2017.
  29. Hamilton, Scott (October 7, 2019). "Pontifications: Muilenburg's departure wouldn't go far enough". Leeham News. Archived from the original on October 7, 2019. Retrieved October 7, 2019.
  30. 1 2 3 4 5 6 7 8 9 10 George, Fred (May 12, 2017). "Pilot Report: Flying the 737-8, Boeing's New Narrowbody Breadwinner". Aviation Week & Space Technology. Archived from the original on May 12, 2017. Retrieved May 12, 2017.
  31. "First Firm Order for 737 MAX", Aviation News, February 2012, p. 5
  32. Carvalho, Stanley (November 5, 2014). "Boeing plans to develop new airplane to replace 737 MAX by 2030". Reuters. Archived from the original on October 21, 2017. Retrieved June 30, 2017.
  33. Siebenmark, Jerry (August 13, 2015). "Spirit AeroSystems completes first Boeing 737 Max fuselage". Wichita Eagle. Archived from the original on August 17, 2015. Retrieved August 13, 2015.
  34. Gates, Dominic (December 8, 2015). "Boeing unveils the first 737 MAX and its new production line". The Seattle Times. Archived from the original on January 5, 2016. Retrieved December 9, 2015.
  35. DeMay, Daniel (December 8, 2015). "Photos: Boeing rolls out new 737 MAX 8 airplane". Seattle Post-Intelligencer. Archived from the original on December 9, 2015. Retrieved December 9, 2015.
  36. "Max Makes Debut" Airliner World February 2016 p. 5.
  37. Trimble, Stephen (December 1, 2016). "First redesigned thrust reverser delivered for 737 Max". FlightGlobal. Archived from the original on April 11, 2017. Retrieved April 10, 2017.
  38. 1 2 Norris, Guy (February 15, 2017). "In Pictures: First Boeing 737-9 Noses Toward Rollout". Aviation Week & Space Technology. Archived from the original on February 15, 2017. Retrieved February 16, 2017.
  39. Trimble, Stephen (April 10, 2017). "Boeing prepares for unprecedented 737 Max ramp-up". FlightGlobal. Archived from the original on April 11, 2017. Retrieved April 10, 2017.
  40. Gates, Dominic (February 14, 2017). "Boeing ramps up automation, innovation as it readies 737MAX". The Seattle Times. Archived from the original on January 29, 2020. Retrieved January 29, 2020.
  41. Gates, Dominic (April 18, 2015). "Boeing retools Renton plant with automation for 737's big ramp-up". The Seattle Times. Archived from the original on July 27, 2020. Retrieved January 29, 2020.
  42. Gates, Dominic (August 2, 2018). "Boeing's 737 ramp-up slows as unfinished planes pile up in Renton". The Seattle Times. Archived from the original on August 3, 2018. Retrieved August 3, 2018.
  43. Gates, Dominic (October 9, 2018). "Boeing finally begins to reduce its 737 delivery backlog Originally". The Seattle Times. Archived from the original on October 12, 2018. Retrieved October 11, 2018.
  44. "Boeing-Hosts-China-President-Xi-Jinping-Announces-Airplane-Sales-Expanded-Collaboration-with-Chinas-Aviation-Industry" (Press release). Boeing. September 23, 2015. Archived from the original on November 14, 2017. Retrieved December 17, 2018.
  45. "Boeing to build plant in Zhoushan". Shanghai Daily. March 14, 2017. Archived from the original on March 6, 2020. Retrieved January 10, 2020.
  46. Thompson, Loren. "Boeing To Build Its First Offshore Plane Factory In China As Ex-Im Bank Withers". Forbes. Archived from the original on August 24, 2019. Retrieved September 23, 2015.
  47. "Pictures: Boeing delivers first China-completed 737 Max". FlightGlobal. December 15, 2018. Archived from the original on December 16, 2018. Retrieved December 17, 2018.
  48. Michaels, Kevin (January 27, 2020). "MAX production shutdown". Aviation Week & Space Technology. p. 12.
  49. 1 2 Gates, Dominic (March 17, 2019). "Flawed analysis, failed oversight: How Boeing, FAA certified the suspect 737 MAX flight control system". The Seattle Times. Archived from the original on March 20, 2021. Retrieved March 18, 2019.
  50. 1 2 Goold, Ian (November 8, 2017). "Boeing Forges Ahead with Flight-test Campaigns". AIN. Archived from the original on November 13, 2017. Retrieved November 13, 2017.
  51. 1 2 3 4 5 "Type Certificate Data Sheet No. A16WE" (PDF). FAA. March 8, 2017. Archived (PDF) from the original on November 13, 2017. Retrieved May 16, 2017.
  52. "Boeing 737 MAX 8 Earns FAA Certification". Boeing. March 9, 2017. Archived from the original on March 30, 2019. Retrieved March 30, 2019.
  53. "Type Certificate Data Sheet No.: IM.A.120" (PDF). EASA. March 27, 2017. Archived from the original (PDF) on March 30, 2019. Retrieved March 14, 2019.
  54. Karp, Aaron (May 10, 2017). "Boeing suspends 737 MAX flights, cites 'potential' CFM LEAP-1B issue". Air Transport World. Aviation Week Network. Archived from the original on February 18, 2019. Retrieved May 11, 2017.
  55. 1 2 3 Trimble, Stephen (May 16, 2017). "Boeing delivers first 737 Max". FlightGlobal. Archived from the original on December 29, 2018. Retrieved May 17, 2017.
  56. Trimble, Stephen (May 12, 2017). "Boeing resumes 737 Max 8 test flights". FlightGlobal. Archived from the original on March 30, 2019. Retrieved May 14, 2017.
  57. Robison, Peter; Levin, Alan (March 18, 2019). "Boeing Drops as Role in Vetting Its Own Jets Comes Under Fire". Fortune. Bloomberg. Archived from the original on March 19, 2019. Retrieved March 18, 2019.
  58. Stieb, Matt (March 17, 2019). "Report: The Regulatory Failures of the Boeing 737 MAX". New York. Archived from the original on March 20, 2019. Retrieved March 21, 2019.
  59. Moores, Victoria (July 18, 2017). "Norwegian performs first transatlantic 737 MAX flight". Aviation Week Network. Penton. Archived from the original on July 18, 2017. Retrieved July 19, 2017.
  60. Waldron, Greg (April 13, 2017). "Boeing optimistic for early 737 Max dispatch reliability". FlightGlobal. Archived from the original on April 13, 2017. Retrieved April 13, 2017.
  61. Schlangenstein, Mary; Johnsson, Julie (August 30, 2017). "Southwest Quietly Takes Delivery of Its First Boeing 737 Max". Bloomberg. Archived from the original on August 30, 2017. Retrieved August 30, 2017.
  62. Austen, Ian; Gebrekidan, Selam (March 13, 2019). "Trump Announces Ban of Boeing 737 Max Flights". The New York Times. Archived from the original on September 13, 2019.
  63. Robison, Peter (June 28, 2019). "Boeing's 737 Max Software Outsourced to $9-an-Hour Engineers". Bloomberg. Archived from the original on June 29, 2019. Retrieved January 15, 2024.
  64. "Boeing engaged $9-an-hour Indian engineers to build 737 Max Software". business-standard.com.
  65. Loh, Chris (June 30, 2019). "Boeing Outsourced 737 MAX Software Development". Simple Flying. Retrieved January 15, 2024.
  66. Premack, Rachel. "Who developed the Boeing 737 Max's flawed software? Low-paid temp workers and recent college grads, according to report". Business Insider. Retrieved January 15, 2024.
  67. Laris, Michael (June 19, 2019). "Changes to flawed Boeing 737 Max were kept from pilots, DeFazio says". The Washington Post. Archived from the original on December 5, 2020.
  68. "Debris found in fuel tanks of 70% of inspected 737 Max jets". Associated Press. February 22, 2020. Archived from the original on February 24, 2020. Retrieved February 24, 2020 via ABC News.
  69. "Boeing Finds Fuel-Tank Debris in Two-Thirds of 737 MAX Jets Inspected". The Wall Street Journal. February 22, 2020. Archived from the original on February 24, 2020. Retrieved February 24, 2020.
  70. Gates, Dominic (November 18, 2020). "Boeing 737 MAX can return to the skies, FAA says". Archived from the original on November 30, 2020. Retrieved November 18, 2020.
  71. "Boeing 737-8 and 737-9 Airplanes: Return to Service" (PDF). Federal Aviation Administration. November 18, 2020. Archived (PDF) from the original on November 18, 2020. Retrieved November 19, 2020.
  72. Arnold, Kyle (April 28, 2022). "Families of 737 Max crash victims push to reopen criminal case against Boeing". The Dallas Morning News. Dallas, Texas. Archived from the original on April 28, 2022. Retrieved April 28, 2020.
  73. "5th Circ. Won't Block Boeing And DOJ's 737 Max Deal". Law360. December 16, 2023.
  74. "'Designed by clowns...supervised by monkeys:' Internal Boeing messages slam 737 Max". Fortune. Retrieved January 6, 2024.
  75. 1 2 "Statement from Boeing CEO Dennis Muilenburg: We Own Safety – 737 MAX Software, Production and Process Update" (Press release). Boeing. April 5, 2019. Archived from the original on April 6, 2019. Retrieved April 6, 2019.
  76. Bruno, Michael; Dubois, Thierry (April 11, 2019). "Leap-1B Eyes Catch Up as 737 Production Slows". MRO Network. Archived from the original on April 11, 2019. Retrieved April 11, 2019.
  77. 1 2 "Boeing Statement Regarding 737 MAX Production" (Press release). Boeing. December 16, 2019. Archived from the original on December 17, 2019. Retrieved December 16, 2019.
  78. "Boeing has temporarily stopped making 737 Max airplanes". CNN. January 21, 2020. Archived from the original on April 14, 2020. Retrieved April 8, 2020.
  79. "Boeing's jet deliveries slide as 737 Max grounding takes a toll". Los Angeles Times. July 9, 2019. Archived from the original on February 24, 2020. Retrieved February 24, 2020.
  80. Johnson, Eric M.; Hepher, Tim (December 18, 2019). "Boeing 737 MAX freeze divides suppliers into haves and have-nots". Reuters. Archived from the original on January 11, 2020. Retrieved January 17, 2020.
  81. 1 2 "Moody's cuts Boeing's debt ratings as 737 MAX problems deepen". Reuters. December 18, 2019. Archived from the original on January 25, 2020. Retrieved January 24, 2020.
  82. McCoy, Daniel (December 31, 2019). "Moody's downgrades aerospace outlook due to 737 MAX". Wichita Business Journal. Archived from the original on May 27, 2021. Retrieved February 1, 2020.
  83. Root, Al (January 3, 2020). "The Boeing 737 MAX Could Have a New Problem---Not Enough Engines". Barron's. Archived from the original on January 8, 2020. Retrieved January 8, 2020.
  84. Hamilton, Scott (January 7, 2020). "Exclusive: Boeing, internally, sees production halt at least 60 days". Leeham News. Archived from the original on January 7, 2020.
  85. McCoy, Daniel (January 15, 2020). "Analyst sees 737 MAX production restarting at fewer than 20 aircraft per month". Wichita Business Journals. Archived from the original on September 16, 2020. Retrieved February 1, 2020.
  86. Bogaisky, Jeremy (April 6, 2020). "Boeing Moves To Completely Shut Down Airliner Production". Forbes. Archived from the original on June 5, 2020. Retrieved April 8, 2020.
  87. "Regulator test flight of Boeing 737 MAX delayed to May: sources". RFI. April 7, 2020. Archived from the original on April 8, 2020. Retrieved April 8, 2020.
  88. "Boeing addresses new 737 MAX software issue that could keep plane grounded longer". Reuters. January 17, 2020. Archived from the original on September 15, 2020. Retrieved January 17, 2020.
  89. "Boeing Statement on 737 MAX Return to Service". MediaRoom (Press release). January 21, 2020. Archived from the original on May 29, 2020.
  90. Shepardson, David (April 28, 2020). "Boeing 737 MAX expected to remain grounded until at least August: sources". Reuters. Archived from the original on June 3, 2020. Retrieved May 27, 2020.
  91. "FAA Updates on Boeing 737 MAX". faa.gov. July 1, 2020. Archived from the original on September 1, 2019. Retrieved July 2, 2020.
  92. 1 2 "FAA clears Boeing 737 Max to fly again 20 months after grounding over deadly crashes". November 18, 2020. Archived from the original on November 18, 2020. Retrieved November 18, 2020.
  93. Genovese, Daniella (December 3, 2020). "Journalists board American Airlines Boeing 737 Max in first public flight since grounding". FOXBusiness. Archived from the original on December 3, 2020. Retrieved December 4, 2020.
  94. "Boeing 737 Max: Brazilian airline resumes passenger flights". BBC News. December 9, 2020. Archived from the original on December 9, 2020. Retrieved December 9, 2020.
  95. Wallace, Gregory (December 29, 2020). "Boeing's troubled 737 Max is back in the air after nearly two years". CNN Business. Archived from the original on December 31, 2020. Retrieved December 31, 2020.
  96. "Transport Canada introduces additional requirements to allow for the return to service of the Boeing 737 MAX" (Press release). Transport Canada. January 18, 2021. Archived from the original on January 28, 2021. Retrieved January 28, 2021.
  97. "Boeing 737 Max cleared to fly in Europe after crashes". BBC News. January 27, 2021. Archived from the original on January 28, 2021. Retrieved January 28, 2021.
  98. "DGCA 26 August 2021". August 27, 2021. Archived from the original on August 27, 2021. Retrieved August 27, 2021.
  99. "EASA drafts 737 MAX return conditions, differences with FAA". November 25, 2020. Archived from the original on June 1, 2022. Retrieved April 10, 2022.
  100. Hamilton, Scott (January 29, 2020). "Boeing MAX production will restart, build slowly". Leeham News. Archived from the original on January 30, 2020.
  101. Hemmerdinger, Jon (January 29, 2020). "Boeing will need a 'few years' to recapture previous 737 Max production rate plans". Flight Global. Archived from the original on February 1, 2020. Retrieved February 1, 2020.
  102. Kilgore, Tomi (January 30, 2020). "Spirit AeroSystems to restart 737 MAX planes 'slowly,' won't hit 52/month production rate for more than 2 years". MarketWatch. Archived from the original on February 1, 2020.
  103. 1 2 agencies, Guardian staff and (August 20, 2020). "Boeing publicises new name for 737 Max planes after crashes". the Guardian. Archived from the original on August 20, 2020. Retrieved August 21, 2020.
  104. "Boeing Formally Restarts 737 MAX Production | Aviation Week Network". Archived from the original on September 14, 2022. Retrieved May 28, 2020.
  105. 1 2 Hemmerdinger, Jon (October 28, 2020). "Boeing revises 2021 737 Max delivery pace, reflecting depressed demand". Flight Global. Archived from the original on October 31, 2020. Retrieved October 29, 2020.
  106. "U.S. ends Boeing 737 MAX flight ban after crash probes". November 18, 2020. Archived from the original on November 18, 2020. Retrieved November 18, 2020.
  107. 1 2 3 Eric M. Johnson and Tim Hepher (March 5, 2022). "EXCLUSIVE Boeing aims to nearly double 737 MAX production by end-2023 -sources". Reuters. Archived from the original on March 5, 2022. Retrieved March 5, 2022.
  108. "Boeing says 737 production hit 31-per-month rate in June as backlog jumps". FflightGlobal. July 12, 2022. Archived from the original on July 12, 2022. Retrieved July 13, 2022.
  109. Hemmerdinger, Jon (September 16, 2022). "Boeing still pausing 737 production as it works through supply troubles". Flight Global.
  110. Ostrower, Jon (January 30, 2023). "Boeing to open 737 Max line at Everett plant". The Air Current. Retrieved January 30, 2023.
  111. Gates, Dominic (January 30, 2023). "Boeing to set up a fourth 737 MAX assembly line in Everett". The Seattle Times. Retrieved January 30, 2023.
  112. Dominic Gates (March 9, 2022). "Boeing may ask Congress to extend MAX 10 exemption from safety rule". The Seattle Times. Archived from the original on March 9, 2022. Retrieved March 9, 2022.
  113. 1 2 3 Hemmerdinger, Jon (November 2, 2022). "Boeing pushes back 737 Max 7 and Max 10 certifications". Flight Global. Retrieved December 23, 2022. Boeing has again delayed certification timelines for its two outstanding 737 Max variants, now estimating the Federal Aviation Administration will clear the Max 7 by early 2023 and the Max 10 by early 2024.
  114. Hemmerdinger, Jon (December 1, 2022). "Top US lawmakers to decide fate of 737 Max 7 and Max 10 regulatory exemption". Flight Global.
  115. Hemmerdinger, Jon (December 8, 2022). "Congress excludes Max 7 and 10 exemption from defence spending bill". Flight Global.
  116. "Congress clears FAA to certify Boeing 737 MAX 7, MAX 10 unchanged". The Seattle Times. December 19, 2022. Retrieved December 21, 2022.
  117. "If Congress doesn't mandate Boeing 737 MAX safety retrofits, Europe will". The Seattle Times. December 2, 2022. Retrieved December 21, 2022.
  118. "Boeing wants FAA to exempt MAX 7 from safety rules to get it in the air"
  119. "Boeing plans to develop new airplane to replace 737 MAX by 2030". Reuters. November 5, 2014. Archived from the original on October 30, 2017. Retrieved January 24, 2020.
  120. Guy Norris and Jens Flottau (December 12, 2014). "Boeing Revisits Past In Hunt For 737/757 Successors". Aviation Week & Space Technology. Archived from the original on December 14, 2014. Retrieved December 14, 2014.
  121. Trimble, Stephen (June 15, 2017). "737 Max cutaway and technical description". FlightGlobal. Archived from the original on June 15, 2017. Retrieved June 15, 2017.
  122. "Boeing: The most efficient winglet on any airplane". boeing.com. Archived from the original on November 26, 2021. Retrieved November 26, 2021.
  123. 1 2 3 Norris, Guy (December 2, 2013). "Laminar Flow Boosts 737 MAX Long-Range Performance". Aviation Week & Space Technology. Archived from the original on June 5, 2016. The configuration is designed to maximize lift for a wingspan restricted to the same Category C-sized gates as current 737s.
  124. 1 2 3 Norris, Guy (February 15, 2017). "In Pictures: First Boeing 737-9 Noses Toward Rollout". Aviation Week & Space Technology. Archived from the original on February 15, 2017. Retrieved February 16, 2017.
  125. 1 2 Herbert, Joseph (2020). The Boeing 737 MAX: Lessons for Engineering Ethics. Dordrecht: Springer Netherlands. pp. 2957–2974.
  126. Rockwell Collins (November 15, 2012). "Rockwell Collins wins Boeing 737 MAX contract for large-format flight displays" (Press release). Archived from the original on February 17, 2017. Retrieved February 16, 2017 via Businesswire.
  127. "Boeing aims to minimise 737 Max changes". Air Transport Intelligence News. FlightGlobal. August 31, 2011. Archived from the original on December 4, 2018. Retrieved February 16, 2017.
  128. Lemme, Peter (October 28, 2019). "Flawed Assumptions Pave a Path to Disaster". Archived from the original on November 2, 2019. Retrieved November 2, 2019.
  129. Ostrower, Jon (November 13, 2018). "What is the Boeing 737 Max Maneuvering Characteristics Augmentation System". The Air Current. Archived from the original on April 7, 2019. Retrieved June 11, 2019.
  130. "Boeing's MCAS may not have been needed on the 737 Max at all". The Air Current. January 10, 2021. Archived from the original on January 10, 2021. Retrieved January 10, 2021.
  131. "Boeing Introduces 737 MAX With Launch of New Aircraft Family" (Press release). Boeing. August 30, 2011. Archived from the original on August 20, 2017. Retrieved May 14, 2017.
  132. Ostrower, Jon (August 30, 2011). "More details emerge on configuration of re-engined 737". Flight International. FlightGlobal. Archived from the original on March 30, 2019. Retrieved September 5, 2011.
  133. "CFM56-7B". Safran. June 1, 2015. Archived from the original on March 30, 2019. Retrieved June 14, 2018.
  134. Ostrower, Jon (August 31, 2011). "Boeing narrows 737 Max engine fan size options to two". FlightGlobal. Archived from the original on March 27, 2019. Retrieved May 14, 2017.
  135. Ostrower, Jon (November 3, 2011). "Boeing reveals 737 Max configuration details". FlightGlobal. Archived from the original on December 22, 2018. Retrieved March 26, 2019.
  136. "Boeing cites 600 commitments for revamped 737". Reuters. November 3, 2011. Archived from the original on December 4, 2018. Retrieved June 30, 2017.
  137. Ostrower, Jon (May 17, 2012). "Boeing Tweaks Engine for New 737 Max". The Wall Street Journal. Archived from the original on December 5, 2018. Retrieved August 3, 2017.
  138. Nicas, Jack; Kitroeff, Natalie; Gelles, David; Glanz, James (June 1, 2019). "Boeing Built Deadly Assumptions Into 737 Max, Blind to a Late Design Change". The New York Times. ISSN 0362-4331. Archived from the original on June 1, 2019. Retrieved July 27, 2019.
  139. Polek, Gregory (November 13, 2011). "Boeing Takes Minimalist Approach to 737 MAX". Aviation International News. Archived from the original on November 7, 2018. Retrieved May 14, 2017.
  140. Trimble, Stephen (July 23, 2013). "Boeing locks in 737 Max 8 configuration". FlightGlobal. Archived from the original on April 9, 2019. Retrieved March 26, 2019.
  141. Tinseth, Randy (May 22, 2018). "737 MAX: a year of serving the globe". Boeing. Archived from the original on May 23, 2018. Retrieved May 22, 2018.
  142. Zhang, Benjamin (March 13, 2019). "Here's how much Boeing is estimated to make on each 737 Max 8 plane". Business Insider. Archived from the original on March 6, 2020. Retrieved January 23, 2020.
  143. "Boeing Stock Falls As Trump, FAA Ground Boeing 737 Max Jets In U.S. | Investor's Business Daily". Investor's Business Daily. March 14, 2019. Archived from the original on January 31, 2020. Retrieved January 31, 2020.
  144. Polek, Gregory (January 29, 2020). "Amid Big Losses, Boeing To 'Reassess' NMA, Cut 787 Rate". Aviation International News. Archived from the original on January 31, 2020. Retrieved January 31, 2020.
  145. "Boeing to Recognize Charge and Increased Costs in Second Quarter Due to 737 MAX Grounding – Jul 18, 2019". MediaRoom. Archived from the original on May 19, 2020. Retrieved January 31, 2020.
  146. Hemmerdinger, Jon (January 29, 2020). "Boeing estimates 737 Max crisis will cost $18.6 billion". Flight Global. Archived from the original on January 29, 2020. Retrieved February 2, 2020.
  147. 1 2 3 "Boeing Commercial Airplanes – Orders and Deliveries – 737 Model Summary". Boeing. October 2018. Archived from the original on November 21, 2018. Retrieved February 12, 2021.
  148. Ostrower, Jon (August 30, 2011). "Boeing designates 737 MAX family". Air Transport Intelligence News. FlightGlobal. Archived from the original on September 25, 2011. Retrieved August 31, 2011.
  149. 1 2 "Boeing Delivers First 737 MAX 9" (Press release). Boeing. March 21, 2018. Archived from the original on September 11, 2020. Retrieved March 22, 2018.
  150. 1 2 "Ryanair Takes Delivery Of 1st Boeing 737 "Gamechanger" Aircraft – Ryanair's Corporate Website". corporate.ryanair.com. Archived from the original on June 21, 2022. Retrieved June 21, 2022.
  151. Insinna, Valerie; Shepardson, David (July 26, 2023). "First delivery of Boeing 737 MAX 7 delayed to 2024". Reuters. Retrieved November 13, 2023.
  152. Kingsley-Jones, Max (February 7, 2018). "Detailed design starts on 737 Max 10". FlightGlobal. Archived from the original on February 12, 2018. Retrieved February 11, 2018.
  153. "Farnborough: Boeing's Execution on 737 MAX Sparkles as MAX 7.5 and MAX 10X Loom". Airways Magazine. July 10, 2016. Archived from the original on July 11, 2016. Retrieved July 17, 2016.
  154. "Boeing confirms 737 Max 7 redesign". FlightGlobal. July 11, 2016. Archived from the original on November 29, 2019. Retrieved July 11, 2016.
  155. "Boeing Upscales 737-700". Aviation International News. July 12, 2016. Archived from the original on May 27, 2021. Retrieved July 13, 2016.
  156. 1 2 Norris, Guy (March 16, 2018). "Boeing Begins 737-7 Flight Test Program". Aviation Week Network. Archived from the original on October 17, 2018. Retrieved March 20, 2018.
  157. 1 2 Trimble, Stephen (October 4, 2017). "Boeing starts building first 737 Max 7". FlightGlobal. Archived from the original on May 10, 2019. Retrieved October 5, 2017.
  158. Trimble, Stephen (November 23, 2017). "Boeing starts assembling first Max 7". FlightGlobal. Archived from the original on December 1, 2017. Retrieved November 23, 2017.
  159. Gates, Dominic (February 5, 2018). "Boeing debuts MAX 7 jet, smallest and slowest-selling of its 737 MAX family". The Seattle Times. Archived from the original on February 5, 2018. Retrieved February 6, 2018.
  160. "Boeing 737 Max 7 narrowbody jetliner makes maiden flight". Reuters. March 16, 2018. Archived from the original on March 16, 2018. Retrieved March 16, 2018.
  161. Trimble, Stephen (March 16, 2018). "Boeing launches 737 Max 7 into flight testing". FlightGlobal. Archived from the original on March 17, 2018. Retrieved March 17, 2018.
  162. "Canada's WestJet defers maiden B737 MAX 7 to 2021". ch-aviation. August 1, 2018. Archived from the original on June 8, 2019. Retrieved June 8, 2019.
  163. Josephs, Leslie (March 29, 2021). "Southwest Airlines agrees to buy 100 of Boeing's smallest 737 Max model". CNBC. Archived from the original on August 31, 2021. Retrieved September 22, 2021.
  164. Bertoletti, Mario (June 8, 2021). "Southwest Airlines Orders 34 Boeing 737 MAX 7". Airways Magazine. Archived from the original on September 22, 2021. Retrieved September 22, 2021.
  165. "Southwest Airlines Reports Second Quarter 2022 Results". Southwest Airlines Newsroom (Press release). July 28, 2022. Archived from the original on September 14, 2022.
  166. 1 2 Guy Norris; Sean Broderick (October 25, 2023). "Boeing Closing In On 737-7, 737-10 Certification Milestones". Aviation Week.
  167. Singh, Rajesh Kumar; Shepardson, David (November 10, 2023). "Exclusive: Southwest Airlines expects certification of Boeing's 737 MAX 7 by April, company executive says". Reuters. Retrieved November 13, 2023.
  168. 1 2 "Boeing plans performance upgrade for 737 Max after 2021". FlightGlobal. October 31, 2016. Archived from the original on November 1, 2016. Retrieved October 31, 2016.
  169. "Boeing Completes 737 MAX 8 Firm Configuration" Archived September 23, 2015, at the Wayback Machine. Boeing, July 23, 2013.
  170. "737 MAX 8 performs first international flight". AeroLatin News. May 3, 2016. Archived from the original on April 8, 2019. Retrieved March 12, 2019.
  171. "End of Line B737-800 Values Show Fatigue". Aircraft Value News. September 17, 2018. Archived from the original on September 17, 2018. Retrieved September 17, 2018.
  172. "Boeing Launches 737 MAX 200 with Ryanair" (Press release). Boeing. September 8, 2014. Archived from the original on September 9, 2014. Retrieved September 10, 2014.
  173. Gates, Dominic (September 8, 2014). "Ryanair makes big order for 737 MAX jets that can carry 200". The Seattle Times. Archived from the original on May 12, 2019. Retrieved January 18, 2017.
  174. "Update 5-Ryanair buys 100 Boeing 737 MAX jets, sees fare price war". Reuters. September 8, 2014. Archived from the original on September 30, 2015. Retrieved June 30, 2017.
  175. "Ryanair, Boeing Finalize Max 200 Deal". Aviation International News. December 1, 2014. Archived from the original on June 17, 2015. Retrieved June 17, 2015.
  176. Noëth, Bart (November 19, 2018). "Ryanair's first Boeing 737 MAX 200 aircraft has rolled out of Boeing's final assembly line". Aviation24.be. Archived from the original on August 17, 2020. Retrieved May 28, 2019.
  177. "First High-Capacity Boeing 737-8 Enters Flight Test Jan 23, 2019 Guy Norris". Aviation Week Network. Archived from the original on January 26, 2019. Retrieved January 24, 2019.
  178. Clark, Oliver (February 14, 2019). "Ryanair Max to make debut at Stansted". FlightGlobal. Archived from the original on November 29, 2019. Retrieved February 15, 2019.
  179. Ostrower, Jon (November 26, 2019). "Boeing 737 Max re-certificaton likely to slide into 2020, Ryanair model faces new design issue". The Air Current. Archived from the original on November 29, 2019. Retrieved November 27, 2019.
  180. "Every setback is an opportunity for Ryanair". The Economist. March 23, 2023.
  181. Pilar Wolfsteller (April 1, 2021). "FAA certificates Boeing 737 Max 8-200 variant". Flightglobal. Archived from the original on April 1, 2021. Retrieved April 1, 2021.
  182. "Boeing: Commercial". boeing.com. Archived from the original on October 2, 1999. Retrieved May 24, 2022.
  183. "Boeing showing 737-8ERX concept in response to A321LR". Leeham News. March 12, 2015. Archived from the original on March 23, 2017. Retrieved March 23, 2017.
  184. "Boeing's 737 MAX 9 takes off on first flight". The Seattle Times. April 13, 2017. Archived from the original on August 18, 2020. Retrieved April 13, 2017.
  185. "Boeing completes 737 Max 9 maiden flight". FlightGlobal. April 13, 2017. Archived from the original on April 14, 2017. Retrieved April 14, 2017.
  186. "Civil Aviation Programs To Watch". Aviation Week & Space Technology. June 9, 2017. Archived from the original on May 27, 2021. Retrieved June 13, 2017.
  187. Trimble, Stephen (February 16, 2018). "Boeing 737 Max 9 receives certification". FlightGlobal. Archived from the original on May 10, 2019. Retrieved February 16, 2018.
  188. "B737-9 EASA Certification Does Nothing for Values". Aircraft Value News. November 12, 2018. Archived from the original on November 13, 2018. Retrieved November 13, 2018.
  189. 1 2 3 4 Flottau, Jens (March 10, 2017). "Customers Press Boeing To Launch New Midsize Widebody Aircraft Soon". Aviation Week & Space Technology. Archived from the original on March 10, 2017. Retrieved March 10, 2017.
  190. Trimble, Stephen (July 4, 2016). "Farnborough: Proposed stretch of 737 Max 9 possible, but challenging". FlightGlobal. Archived from the original on July 5, 2016. Retrieved July 4, 2016.
  191. Norris, Guy (September 30, 2016). "Simpler 737-10X, New Midsize Airplane Both 'Doable'". Aviation Week & Space Technology. Archived from the original on September 30, 2016. Retrieved September 30, 2016.
  192. Norris, Guy (January 10, 2017). "Boeing Defines Final 737 MAX Stretch Offering". Aviation Week & Space Technology. Archived from the original on January 31, 2017. Retrieved January 11, 2017.
  193. Ostrower, Jon (January 12, 2017). "Boeing chases airlines for stretch 737". CNN. Archived from the original on October 19, 2020. Retrieved August 3, 2020.
  194. Tinseth, Randy (March 6, 2017). "MAX 10X". Boeing. Archived from the original on November 26, 2017. Retrieved March 7, 2017.
  195. Johnsson, Julie (March 7, 2017). "Boeing's Longest 737 Max Can't Debut Too Soon for One Buyer". Bloomberg. Archived from the original on March 8, 2017. Retrieved March 9, 2017.
  196. "Boeing Launches Larger Capacity 737 MAX 10 at 2017 Paris Air Show" (Press release). Boeing. June 19, 2017. Archived from the original on June 26, 2017. Retrieved June 19, 2017.
  197. Trimble, Stephen (June 19, 2017). "Boeing launches 737 Max 10". Flightglobal. Archived from the original on May 10, 2019. Retrieved June 19, 2017.
  198. Dron, Alan (June 20, 2017). "United converts 100 MAX to -10 variant; CALC includes -10s in order". Aviation Week Network. Archived from the original on June 23, 2017. Retrieved June 22, 2017.
  199. "Propelled by MAX 10, Boeing thumps Airbus at Paris Air Show". Leeham. June 22, 2017. Archived from the original on January 10, 2019. Retrieved June 22, 2017.
  200. "Boeing, Lion Air Group Announce Commitment for 50 737 MAX 10s" (Press release). Boeing. June 19, 2017. Archived from the original on June 30, 2017. Retrieved July 5, 2017.
  201. "Boeing 737 MAX 10 Reaches Firm Configuration" (Press release). Boeing. February 6, 2018. Archived from the original on September 19, 2020. Retrieved February 11, 2018.
  202. Norris, Guy (August 30, 2018). "Boeing Unveils 737-10 Extended Main Landing Gear Design Details". Aviation Week & Space Technology. Archived from the original on September 2, 2018. Retrieved August 30, 2018.
  203. Norris, Guy (February 9, 2018). "Boeing Completes Configuration For Final 737 MAX Derivative". Aviation Week & Space Technology. Archived from the original on February 12, 2018. Retrieved February 11, 2018.
  204. "Airport Compatibility Brochure Boeing 737 MAX 10" (PDF). Boeing. Retrieved February 12, 2019.
  205. "Boeing 737 MAX 10 Makes its Debut" (Press release). Boeing. November 22, 2019. Archived from the original on September 15, 2020. Retrieved November 23, 2019.
  206. Hemmerdinger, Jon (November 23, 2019). "Muted Boeing unveils 737 Max 10". Flightglobal. Archived from the original on November 25, 2019. Retrieved November 24, 2019.
  207. "Why the A321XLR makes sense for Alaska Airlines". Leeham News and Analysis. February 23, 2020. Archived from the original on March 12, 2021. Retrieved February 24, 2020.
  208. Jon Hemmerdinger (February 2, 2021). "Boeing delays 737 Max 10 deliveries two years, to 2023". Flightglobal. Archived from the original on February 2, 2021. Retrieved February 2, 2021.
  209. Hemmerdinger, Jon (June 18, 2021). "Boeing 737 Max 10 makes maiden flight". Flight Global. Archived from the original on June 27, 2021. Retrieved June 18, 2021.
  210. Dominic Gates (June 29, 2021). "United orders 200 Boeing 737 MAX planes in huge boost for the jet program". The Seattle Times. Archived from the original on July 5, 2021. Retrieved July 5, 2021.
  211. "Ryanair Fail To Reach Agreement Over Boeing MAX10's – Travel Radar". Travel Radar – Aviation News. September 6, 2021. Archived from the original on September 14, 2021. Retrieved September 14, 2021.
  212. Goodbody, Will (May 9, 2023). "Ryanair inks $40bn Boeing deal for up to 300 new 737-MAX-10 aircraft". RTE News. Retrieved May 9, 2023.
  213. "Boeing Business Jets to Offer the BBJ MAX" (Press release). Boeing. October 29, 2012. Archived from the original on November 3, 2016. Retrieved November 1, 2016.
  214. "Boeing Business Jets Unveils BBJ MAX 7" (Press release). Boeing. October 31, 2016. Archived from the original on October 31, 2018. Retrieved November 1, 2016.
  215. "Milestone paves the way for delivery of the newest version of the best-selling business jetliner" (Press release). Boeing. April 16, 2018. Archived from the original on October 31, 2018. Retrieved April 17, 2018.
  216. "Boeing 737 MAX (-7/-8/-9/-10) Production List". planespotters.net. Retrieved November 5, 2023.
  217. "Lion Air commits to up to 380 Boeing 737s". Air Transport Intelligence News. FlightGlobal. November 17, 2011. Archived from the original on November 19, 2011. Retrieved November 18, 2011.
  218. "ACG Becomes third identified 737 Max customer". November 17, 2011. Archived from the original on November 20, 2011. Retrieved November 18, 2011.
  219. "737 Max commitments top 948". Air Transport Intelligence News. FlightGlobal. December 13, 2011. Archived from the original on December 30, 2013. Retrieved December 15, 2011.
  220. "Ryanair places $22bn order with Boeing, buys up to 200 new aircraft". Independent.ie. September 5, 2014. Archived from the original on June 8, 2015. Retrieved April 1, 2015.
  221. "Boeing, GECAS Announce Order for 75 737 MAXs" (Press release). Boeing. January 4, 2017. Archived from the original on January 5, 2017. Retrieved January 4, 2017.
  222. "Lion Air Said to Plan Airbus Order Switch After Boeing 737 Crash". Bloomberg. March 12, 2019. Archived from the original on March 30, 2019. Retrieved April 30, 2019.
  223. Sutherland, Brooke (March 19, 2019). "China's Boeing Threat Has More Bite Than Bark". Bloomberg News. Archived from the original on May 3, 2019. Retrieved March 5, 2020.
  224. Genga, Bella; Odeh, Layan (March 13, 2019). "Boeing's 737 Max Problems Put $600 Billion in Orders at Risk". Bloomberg News. Archived from the original on March 24, 2020. Retrieved March 5, 2020.
  225. Lee, Liz; Freed, Jamie (January 15, 2020). "Malaysia Airlines suspends Boeing 737 MAX deliveries due to jet's grounding". Reuters. Archived from the original on January 16, 2020. Retrieved January 18, 2020.
  226. Johnsson, Julie (December 8, 2020). "Boeing Loses 23 Max Orders as Virgin Australia Remakes Fleet". Bloomberg News. Archived from the original on January 8, 2021. Retrieved January 6, 2021.
  227. "Akasa Air Orders 72 Fuel-Efficient 737 MAX Airplanes to Launch Service in Fast-Growing Indian Market". Archived from the original on July 22, 2022. Retrieved June 27, 2022.
  228. Chowdhury, Anirban. "Rakesh Jhunjhunwala-owned Akasa Air receives first Boeing aircraft". The Economic Times. Archived from the original on June 27, 2022. Retrieved June 27, 2022.
  229. Hamilton, Scott (August 9, 2023). "Boeing reveals sub-type orders for MAX, 777X for the first time". Leeham News. Retrieved August 10, 2023.
  230. Oestergaard, J. Kasper (January 15, 2019). "Airbus and Boeing Report December and Full-Year 2018 Commercial Aircraft Orders and Deliveries". Forecast International.
  231. Hawkins, Andrew (January 14, 2020). "Boeing had more cancellations than orders in 2019 as 737 Max crisis deepens". The Verge.
  232. Johnson, Eric (January 12, 2021). "Boeing limps into 2021 with more 737 MAX cancellations, delayed 787 deliveries". Reuters.
  233. "The Boeing 737 Max is now the deadliest mainstream jetliner". finance.yahoo.com. March 11, 2019. Archived from the original on August 5, 2019. Retrieved August 5, 2019.
  234. "Lion Air: How could a brand new plane crash?". BBC News Online. October 29, 2018. Archived from the original on March 28, 2019. Retrieved March 14, 2019.
  235. Kami, Indah Mutiara (October 29, 2018). "Breaking News: Basarnas Pastikan Pesawat Lion Air JT 610 Jatuh". Detik.com. Archived from the original on October 29, 2018. Retrieved October 30, 2018.
  236. Levin, Alan; Suhartono, Harry (March 20, 2019). "Pilot Who Hitched a Ride Saved Lion Air 737 Day Before Deadly Crash". Bloomberg. Archived from the original on March 20, 2019. Retrieved March 20, 2019.
  237. "Aircraft Accident Investigation Report. PT. Lion Airlines Boeing 737 (MAX); PK-LQP Tanjung Karawang, West Java, Republic of Indonesia 29 October 2018" (PDF). Komite Nasional Keselamatan Transportasi. Archived (PDF) from the original on October 25, 2019. Retrieved October 25, 2019.
  238. "Boeing issues operational manual guidance to airlines following Lion Air crash". CNN. November 7, 2018. Archived from the original on November 7, 2018. Retrieved October 8, 2018.
  239. "Ethiopian Airlines: 'No survivors' on crashed Boeing 737". BBC News Online. March 10, 2019. Archived from the original on March 10, 2019. Retrieved March 10, 2019.
  240. "Official pressrelease". ethiopianairlines.com. Archived from the original on November 6, 2018. Retrieved March 10, 2019.
  241. Hilsz-Lothian, Aaron (March 10, 2019). "Ethiopian Airlines Boeing 737 MAX involved in fatal crash". SamChui.com. Archived from the original on March 27, 2019. Retrieved March 10, 2019.
  242. Watts, Jonathan; Burke, Jason (March 10, 2019). "Ethiopian Airlines crash: inquiry to explore how 'excellent' pilot was unable to avert disaster". The Guardian. Archived from the original on March 10, 2019. Retrieved March 10, 2019.
  243. Lazo, Luz; Schemm, Paul; Aratani, Lori. "Investigators find 2nd piece of key evidence in crash of Boeing 737 Max 8 in Ethiopia". The Washington Post. Archived from the original on March 17, 2019. Retrieved March 16, 2019.
  244. "Ethiopian Airlines crew 'followed rules, unable to control jet'". Al Jazeera. April 4, 2019. Archived from the original on April 5, 2019. Retrieved April 5, 2019.
  245. Asquith, James (August 19, 2019). "When Will the Boeing 737 MAX Fly Again? Not This Year". Forbes. Archived from the original on August 21, 2019. Retrieved August 21, 2019.
  246. Yoon, John. "Alaska Airlines Plane Forced to Land at Oregon Airport Shortly After Takeoff", The New York Times, January 5, 2024. Retrieved January 5, 2024.
  247. Petchenik, Ian (January 6, 2024). "Alaska Airlines 737-9 MAX exit door separates in flight". Flightradar24 Blog. Archived from the original on January 6, 2024. Retrieved January 6, 2024.
  248. McAvoy, Audrey; Koenig, David (January 6, 2024). "Federal officials order grounding of some Boeing 737 Max 9 jetliners after plane suffers a blowout". Associated Press.
  249. Hradecky, Simon (January 6, 2024). "Accident: Alaska B39M at Portland on Jan 5th 2024, emergency exit and panel separated in flight". The Aviation Herald. Archived from the original on January 6, 2024. Retrieved January 6, 2024.
  250. Shepeardson, David & Insinna, Valerie. "U.S. safety board investigating Alaska Airlines Boeing 737 MAX 9 emergency landing". Reuters, January 5, 2024. Retrieved January 5, 2024.
  251. "Alaska Airlines grounds Boeing 737 Max 9 planes after mid-air window blowout". theguardian.com, January 6, 2024.
  252. "Federal officials order grounding of Boeing 737-9 Max jetliners after a plane suffers a blowout". Apnews.com, January 6, 2024.
  253. "Boeing 737 Max 9: United Airlines finds loose bolts in jet inspections". January 8, 2024.
  254. "737 MAX Airplane Characteristics for Airport Planning" (PDF) (Rev. F ed.). Boeing. February 2021. Archived (PDF) from the original on November 24, 2021. Retrieved December 29, 2021.
  255. "Boeing 737 MAX". Boeing. Archived from the original on April 17, 2021. Retrieved July 14, 2021.
  256. "Boeing 737 MAX by design". Boeing. Archived from the original on February 21, 2019. Retrieved February 21, 2019.
  257. "737 MAX Airplane Characteristics for Airport Planning" (PDF) (Rev. A ed.). Boeing. August 2017. Archived (PDF) from the original on October 23, 2017. Retrieved October 22, 2017.
  258. "LEAP Brochure" (PDF). CFM International. 2013. Archived from the original (PDF) on September 23, 2015.
  259. "737MAX and the MD-12". Aviation Week. December 9, 2013. Archived from the original on August 19, 2016. Retrieved July 6, 2016.
  260. "737 MAX". Boeing. Technical Specs. Archived from the original on November 27, 2018. Retrieved October 11, 2021.
  261. "Boeing Revises "Obsolete" Performance Assumptions". FlightGlobal. August 3, 2015. Archived from the original on October 5, 2016. Retrieved May 5, 2016.
  262. "DOC 8643 – Aircraft Type Designators". ICAO. Archived from the original on July 10, 2017. Retrieved July 1, 2017.

Further reading

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.