Arun III is a hydro-electric project under construction on the Arun River in Sankhuwasabha District of Province 1, Nepal. The project is of 900 megawatts capacity and will be the largest hydropower plant in South Asia. It is constructed by SJVN Arun III Power Development Company Private Limited, a wholly owned subsidiary of SJVN Ltd.[1][2]

The estimated cost is US$1.6 billion including $156 million to develop the transmission line. It will generate about 4,018.87 million units of electricity annually. In February 2020, financial closure was done by the governments of India and Nepal. The project is constructed on a build-own-operate and transfer (BOOT) basis. SJVN will operate the plant for 30 years and then transfer the ownership to the Nepal government. During 30 years of operation, 21.9% of power will be provided to Nepal free of cost. The project’s construction is expected to generate 3,000 jobs in Nepal and India.[3]

Project details

The project consists of a 70m high and 466m wide concrete gravity dam across Arun River which will be able to store 13.94 million cubic meters of water. The dam will have six (now only five) sluice gates. There will be four underground desilting basins (they have since been removed from the proposal) having a length of 420m, a width of 16m and a height of 24m each. A 9.5m diameter tunnel having length of 11.74 km followed by 9.5m diameter two steel-lined pressure shafts and four penstocks will convey the flow to the powerhouse. The tailrace tunnel is 192m long and has a diameter of 10m. Four vertical Francis turbine units of 225MW each will be housed in an underground powerhouse. The gross head is 308m and the design net head is 286.21m. The power evacuation will be done via a 300 km-long, 400kV transmission line to India. It will be routed along Diding, Nepal to Dhalkebar, Nepal, and finally to Muzzafarpur, India.[3]

The civil contractor is Jaiprakash Associates. The hydro-mechanical contractor is Om Metals. The electro-mechanical contractor is BHEL. Total Management Services will monitor the environmental aspects. 269 families will be affected by the project construction, and they will be compensated by being provided with 30 units of electricity each free of cost every month.[3]

History

The project was formed by Nepal Government in 1992. However, the NGOs, environment protectors and individuals worried against rampant privatization in the culture and natural beauty of the Arun valley expressed numerous concerns against it. The criticism of the project included fear of increase of already-high electricity tariffs and whether the size of the project was appropriate. There was also a debate for the road to the project area concerning deforestation and habitat fragmentation. In 1995, the World Bank decided to withdraw their support, effectively cancelling the project.[4]

In November 2014, the project resurfaced and a Project Development Agreement was signed. The surplus power from the project will be exported to India from Dhalkebar, Nepal to Muzaffarpur, Bihar. In 2017, the cabinet of India approved the project for construction.[5]

See also

References

  1. "Arun 3 HEP". Arun 3 HEP. Archived from the original on June 30, 2019. Retrieved May 13, 2023.
  2. "Arun-III hydroelectric power project, Sankhuwasabha, Nepal". Retrieved 2022-07-28.
  3. 1 2 3 "Arun – III Hydropower Project". Power Technology. Retrieved 2022-07-28.
  4. Mahat, Ram. "The Loss of Arun III" (PDF). Nepal Study Center. Retrieved May 13, 2023.
  5. "Indian PM Modi likely to visit Nepal this month".

27°33′N 85°11′E / 27.550°N 85.183°E / 27.550; 85.183

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.