USS Patriot (MCM-7)
History
United States
NameUSS Patriot
BuilderMarinette Marine, Marinette, Wisconsin,
Laid down31 March 1987
Launched15 May 1990
Commissioned13 December 1991
HomeportSasebo, Japan
IdentificationMCM-7
Motto
Statusin active service
Badge
General characteristics
Class and typeAvenger-class mine countermeasures ship
Displacement1,367 long tons (1,389 t)
Length224 ft (68 m) o/a
Beam39 ft (12 m)
Draft13 ft (4.0 m)
Propulsion
Speed14 knots (26 km/h; 16 mph)
Complement6 officers and 75 enlisted
Sensors and
processing systems
  • AN/SLQ-48 (V) Mine Neutralization System
  • AN/SQL-37 (V) 3 Magnetic/Acoustic Influence Minesweeping Gear
  • Oropesa type 0 size 1 Mechanical Sweep Equipment
  • MDG 1701 Marconi Magnetometer Degaussing System
Electronic warfare
& decoys
Armament

USS Patriot (MCM-7), is an Avenger-class mine countermeasures ship of the United States Navy, and is the third Navy ship of that name. The hulls of the Avenger-class ships are constructed of wood with an external coat of fiberglass.

Patriot was laid down on 31 March 1987 by Marinette Marine in Marinette, Wisconsin; launched on 15 May 1990; and commissioned on 13 December 1991 in Charleston, South Carolina. Commander Michael J. O'Moore, a native of Brooklyn, New York, was the commissioning Commanding Officer. Patriot was originally homeported at NS Charleston until 1993, when she transferred to NS Ingleside, Texas.

History

In 1994 Patriot was called to serve in the Pacific, and since then has served as one of four forward-deployed MCMs in 7th Fleet's Amphibious Ready Group. Patriot is operationally assigned to MCMDiv 11, CTF 76, ComSeventhFlt, CinCPacFlt, and USCinCPac. Her administrative chain of command is CoMCMDiv 11, CoMCMRon 1, CoMineWarCom (NAS Corpus Christi, TX) recently merged with Naval Anti-Submarine Warfare Command into NMAWC (Naval Mine and Anti-Submarine Warfare Command), and ComNavSurfLant. Although Patriot was permanently assigned to Sasebo, Japan, her crew served on a rotational basis from Ingleside, Texas. Each rotation lasted approximately 6 months. In 1996 the crew assignments were changed to permanent overseas assignments.

Patriot and her sister ship Guardian were scheduled for a port visit to Hong Kong in the first week of August 1997. As preparations were completed, the Navy hierarchy realized that it would be the first US Navy port visit to the island after the handover to PRC control on 1 July 1997. Plans were quickly completed for USS Blue Ridge (LCC 19) to lead the port visit, and hold receptions for military and diplomatic dignitaries. Patriot and Guardian accompanied the flagship pierside.[1]

In March 2003 the major event was TSTA3/FEP. This Tailored Ship's Training Availability (TSTA3)/ Final Exercise Problem (FEP) initially designed to be a training assist visit to assess readiness, was turned into a graded scenario to prove her battle readiness. This advanced stage of training is designed to improve ships operations and give Patriot an opportunity to prove she is ready to perform her primary and secondary missions with utmost efficiency and skill.

Patriot executed her deployment phase during the 2003 calendar year. Along with conducting MINEX, she participated in Exercise Foal Eagle 2003, a combined naval exercise with the Republic of Korea. Patriot successfully accomplished 100 percent mine-warfare tasking during the integrated exercise. Patriot conducted a WESTPAC Deployment during the months of May and June conducting port visits in Okinawa, Fukuoka, JA, Pusan, ROK, Inchon, ROK, and Kagoshima, JA. Patriot also took part in the 50th Anniversary of the Korean War with a port visit to Pusan, South Korea.

Patriot routinely participates in a combined Mine Warfare training exercises with the Japanese Maritime Self-Defense Force as part of an annual MINEX and EODEX. MINEX/EODEX is a joint mine countermeasures (MCM) exercise designed to foster US Navy and Japanese Maritime Self Defense Force (JMSDF) interoperability through the use of the MCM Triad, surface MCM (SMCM) air MCM (AMCM) and Explosive Ordnance disposal (EOD) teams.

In 2005, Patriot conducted a Selected Maintenance Availability during which the ship was refitted with the most recent equipment upgrades and shipboard alterations. The maintenance period allowed the ship to re-train personnel and in preparations for the ship's Basic Training Phase and Interdeployment Training Cycle.

On 16 February 2007, Patriot was awarded the 2006 Battle "E" award.

In late November 2007, Patriot and sister minesweeper USS Guardian (MCM-5) sought refueling and refuge from an approaching storm in Hong Kong's Victoria Harbour, but were denied entry without explanation by the People's Republic of China.[2] Both ships were eventually refueled at sea and returned safely to their home ports in Japan.[2]

In June 2011, six crew members were given nonjudicial punishment and recommended for discharge from the Navy. The discipline was the result of a hazing incident which took place during the preceding Memorial Day weekend.[3]

References

  1. https://media.defense.gov/2019/Apr/10/2002112785/-1/-1/1/AH199711.pdf
  2. 1 2 "China's Port-Visit Denial Troubles Navy Admirals", The Washington Post, pp. A04, 2007-11-28, retrieved 2007-11-29
  3. Fuentes, Gidget, "6 mine ship sailors get NJP in hazing incident", Military Times, 3 June 2011.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.