Function | Heavy-lift launch vehicle |
---|---|
Manufacturer | Lockheed Martin |
Country of origin | United States |
Cost per launch | $432 million (USD) |
Size | |
Height | 50-62 m (164-207 ft) |
Diameter | 3.05 m (10 ft) |
Mass | 943,050 kg (2,079,060 lb) |
Stages | 3-5 |
Capacity | |
Payload to LEO | |
Mass | 21,680 kg(47,790 lb) |
Payload to Polar LEO | |
Mass | 17,600 kg(38,800 lb) |
Payload to GSO | |
Mass | 5,760 kg(12,690 lb) |
Payload to HCO | |
Mass | 5,660 kg(12,470 lb) |
Associated rockets | |
Family | Titan |
Comparable | Atlas V, Delta IV Heavy, Falcon 9 |
Launch history | |
Status | Retired |
Launch sites | SLC-40/41, Cape Canaveral SLC-4E, Vandenberg AFB |
Total launches | 39[1] (IVA: 22, IVB: 17) |
Success(es) | 35 (IVA: 20, IVB: 15) |
Failure(s) | 4 (IVA: 2, IVB: 2) |
First flight | IV-A: 14 June 1989 IV-B: 23 February 1997 |
Last flight | IV-A: 12 August 1998 IV-B: 19 October 2005 |
Type of passengers/cargo | Lacrosse DSP Milstar Cassini-Huygens |
Boosters (IV-A) – UA1207 | |
No. boosters | 2 |
Powered by | United Technologies UA1207 |
Maximum thrust | 14.234 MN (3,200,000 lbf) |
Specific impulse | 272 seconds (2667 N·s/kg) |
Burn time | 120 seconds |
Propellant | PBAN |
Boosters (IV-B) – SRMU | |
No. boosters | 2 |
Powered by | Hercules USRM[2] |
Maximum thrust | 15.12 MN (3,400,000 lbf) |
Specific impulse | 286 seconds (2805 N·s/kg) |
Burn time | 140 seconds |
Propellant | HTPB |
First stage | |
Powered by | LR87 |
Maximum thrust | 2,440 kN (548,000 lbf) |
Specific impulse | 302 seconds (2962 N·s/kg) |
Burn time | 164 seconds |
Propellant | N2O4 / Aerozine 50 |
Second stage | |
Powered by | 1 LR91 |
Maximum thrust | 467 kN (105,000 lbf) |
Specific impulse | 316 seconds (3100 N·s/kg) |
Burn time | 223 seconds |
Propellant | N2O4 / Aerozine 50 |
Third stage (Optional) – Centaur-T | |
Powered by | 2 RL10 |
Maximum thrust | 147 kN (33,100 lbf) |
Specific impulse | 444 seconds (4354 N·s/kg) |
Burn time | 625 seconds |
Propellant | LH2/LOX |
Titan IV was a family of heavy-lift space launch vehicles developed by Martin Marietta and operated by the United States Air Force from 1989 to 2005.[3] Launches were conducted from Cape Canaveral Air Force Station, Florida[4] and Vandenberg Air Force Base, California.[5]
The Titan IV was the last of the Titan family of rockets, originally developed by the Glenn L. Martin Company in 1958. It was retired in 2005 due to their high cost of operation and concerns over its toxic hypergolic propellants, and replaced with the Atlas V and Delta IV launch vehicles under the EELV program. The final launch (B-30) from Cape Canaveral occurred on 29 April 2005, and the final launch from Vandenberg AFB occurred on 19 October 2005.[6] Lockheed Martin Space Systems built the Titan IVs near Denver, Colorado, under contract to the US government.[1]
Two Titan IV vehicles are currently on display at the National Museum of the United States Air Force in Dayton, Ohio and the Evergreen Aviation and Space Museum in McMinnville, Oregon.
Vehicle description
The Titan IV was developed to provide assured capability to launch Space Shuttle–class payloads for the Air Force. The Titan IV could be launched with no upper stage, the Inertial Upper Stage (IUS), or the Centaur upper stage.
The Titan IV was made up of two large solid-fuel rocket boosters and a two-stage liquid-fueled core. The two storable liquid fuel core stages used Aerozine 50 fuel and nitrogen tetroxide oxidizer. These propellants are hypergolic (ignite on contact) and are liquids at room temperature, so no tank insulation is needed. This allowed the launcher to be stored in a ready state for extended periods, but both propellants are extremely toxic.
The Titan IV could be launched from either coast: SLC-40 or 41 at Cape Canaveral Air Force Station near Cocoa Beach, Florida and at SLC-4E, at Vandenberg Air Force Base launch sites 55 miles northwest of Santa Barbara California. Launches to polar orbits occurred from Vandenberg, with most other launches taking place at Cape Canaveral.
Titan IV-A
Titan IV-A flew with steel-cased solid UA1207 rocket motors (SRMs) produced by Chemical Systems Division.[7][8][9]
Titan IV-B
The Titan IV-B evolved from the Titan III family and was similar to the Titan 34D.
While the launcher family had an extremely good reliability record in its first two decades, this changed in the 1980s with the loss of a Titan 34D in 1985 followed by the disastrous explosion of another in 1986 due to a SRM failure. Due to this, the Titan IV-B vehicle was intended to use the new composite-casing Upgraded Solid Rocket Motors.[10] Due to development problems the first few Titan IV-B launches flew with the old-style UA1207 SRMs.
- Titan IVA
- Titan-4(01)A Centaur
- Titan IVB Centaur
- LR91-AJ-11 rocket engine thrust chamber and injector
- Bottom of first stage of Titan IVB rocket
General characteristics
- Builder: Lockheed-Martin Astronautics
- Power Plant:
- Stage 0 consisted of two solid-rocket motors.
- Stage 1 used an LR87-AJ-11 liquid-propellant rocket engine.
- Stage 2 used the LR91-AJ-11 liquid-propellant engine.
- Optional upper stages included the Centaur and Inertial Upper Stage.
- Guidance System: A ring laser gyro guidance system manufactured by Honeywell.
- Thrust:
- Stage 0: Solid rocket motors provided 1.7 million pounds force (7.56 MN) per motor at liftoff.
- Stage 1: LR87-AJ-11 provided an average of 548,000 pounds force (2.44 MN)
- Stage 2: LR91-AJ-11 provided an average of 105,000 pounds force (467 kN).
- Optional Centaur (RL10A-3-3A) upper stage provided 33,100 pounds force (147 kN) and the Inertial Upper Stage provided up to 41,500 pounds force (185 kN).
- Length: Up to 204 feet (62 m)
- Lift Capability:
- Could carry up to 47,800 pounds (21,700 kg) into low Earth orbit
- up to 12,700 pounds (5,800 kg) into a geosynchronous orbit when launched from Cape Canaveral AFS, Fla.;
- and up to 38,800 pounds (17,600 kg) into a low Earth polar orbit when launched from Vandenberg AFB.
- into geosynchronous orbit:
- with Centaur upper stage 12,700 pounds (5,800 kg)
- with Inertial Upper Stage 5,250 pounds (2,380 kg)
- Payload fairing:[11]
- Manufacturer: McDonnell Douglas Space Systems Co
- Diameter: 16.7 feet (5.1 m)
- Length: 56, 66, 76, or 86 ft
- Mass: 11,000, 12,000, 13,000, or 14,000 lb
- Design: 3 sections, isogrid structure, Aluminum
- Maximum Takeoff Weight: Approximately 2.2 million pounds (1,000,000 kg)
- Cost: Approximately $250–350 million, depending on launch configuration.
- Date deployed: June 1989
- Launch sites: Cape Canaveral AFS, Fla., and Vandenberg AFB, Calif.
Upgrades
Solid Rocket Motor Upgrade test stand
In 1988–89, The R. M. Parsons Company designed and built a full-scale steel tower and deflector facility, which was used to test the Titan IV Solid Rocket Motor Upgrade (SRMU).[12] The launch and the effect of the SRMU thrust force on the Titan IV vehicle were modeled. To evaluate the magnitude of the thrust force, the SRMU was connected to the steel tower through load measurement systems and launched in-place. It was the first full-scale test conducted to simulate the effects of the SRMU on the Titan IV vehicle.[13]
Proposed aluminum-lithium tanks
In the early 1980s, General Dynamics developed a plan to assemble a lunar landing spacecraft in-orbit under the name Early Lunar Acccess. A Space Shuttle would lift a lunar lander into orbit and then a Titan IV rocket would launch with a modified Centaur G-Prime stage to rendezvous and dock. The plan required upgrading the Space Shuttle and Titan IV to use lighter aluminium-lithium alloy propellant tanks.[14] The plan never came to fruition, but in the 1990s the Shuttle's External Tank was converted to aluminum-lithium tanks to rendezvous with the highly inclined orbit of the Russian Mir Space Station.[15]
Type identification
The IV A (40nA) used boosters with steel casings, the IV B (40nB) used boosters with composite casings (the SRMU).
Type 401 used a Centaur 3rd stage, type 402 used an IUS 3rd stage. The other 3 types (without 3rd stages) were 403, 404, and 405:
History
The Titan rocket family was established in October 1955 when the Air Force awarded the Glenn L. Martin Company (later Martin-Marietta, now part of Lockheed Martin) a contract to build an intercontinental ballistic missile (SM-68). The resulting Titan I was the nation's first two-stage ICBM and complemented the Atlas ICBM as the second underground, vertically stored, silo-based ICBM. Both stages of the Titan I used liquid oxygen and RP-1 as propellants.
A subsequent version of the Titan family, the Titan II, was a two-stage evolution of the Titan I, but was much more powerful and used different propellants. Designated as LGM-25C, the Titan II was the largest missile developed for the USAF at that time. The Titan II had newly developed engines which used Aerozine 50 and nitrogen tetroxide as fuel and oxidizer in a self-igniting, hypergolic propellant combination, allowing the Titan II to be stored underground ready to launch. Titan II was the first Titan vehicle to be used as a space launcher.
Development of the space launch only Titan III began in 1964, resulting in the Titan IIIA, eventually followed by the Titan IV-A and IV-B.
CELV
By the mid-1980s the United States government worried that the Space Shuttle, designed to launch all American payloads and replace all unmanned rockets, would not be reliable enough for military and classified missions. In 1984 Under Secretary of the Air Force and Director of the National Reconnaissance Office (NRO) Pete Aldridge decided to purchase Complementary Expendable Launch Vehicles (CELV) for ten NRO payloads; the name came from the government's expectation that the rockets would "complement" the shuttle. Later renamed Titan IV,[17] the rocket would only carry three military payloads[18] paired with Centaur stages and fly exclusively from LC-41 at Cape Canaveral. However, the Challenger accident in 1986 caused a renewed dependence on expendable launch systems, with the Titan IV program significantly expanded. At the time of its introduction, the Titan IV was the largest and most capable expendable launch vehicle used by the USAF.[19]
The post-Challenger program added Titan IV versions with the Inertial Upper Stage (IUS) or no upper stages, increased the number of flights, and converted LC-40 at the Cape for Titan IV launches. As of 1991, almost forty total Titan IV launches were scheduled and a new, improved SRM (solid rocket motor) casing using lightweight composite materials was introduced.
Program cost
In 1990, the Titan IV Selected Acquisition Report estimated the total cost for the acquisition of 65 Titan IV vehicles over a period of 16 years to US$18.3 billion (inflation-adjusted US$ 41 billion in 2024).[20]
Cassini–Huygens launch
In October 1997, a Titan IV-B rocket launched Cassini–Huygens, a pair of probes sent to Saturn. It was the only use of a Titan IV for a non-Department of Defense launch. Huygens landed on Titan on January 14, 2005. Cassini remained in orbit around Saturn. The Cassini Mission ended on September 15, 2017, when the spacecraft was sent into Saturn's atmosphere to burn up.
Retirement
While an improvement over the shuttle, the Titan IV was expensive and unreliable.[17] By the 1990s, there were also growing safety concerns over its toxic propellants. The Evolved Expendable Launch Vehicle (EELV) program resulted in the development of the Atlas V, Delta IV, and Delta IV Heavy launch vehicles, which replaced Titan IV and a number of other legacy launch systems. The new EELVs eliminated the use of hypergolic propellants, reduced costs, and were much more versatile than the legacy vehicles.
Surviving examples
In 2014, the National Museum of the United States Air Force in Dayton, Ohio, began a project to restore a Titan IV-B rocket. This effort was successful, with the display opening June 8, 2016.[21] The only other surviving Titan IV components are at the Wings Over the Rockies Air and Space Museum in Denver, Colorado which has two Titan Stage 1 engines, one Titan Stage 2 engine, and the interstage ‘skirt’ on outdoor display;[22] and at the Evergreen Aviation and Space Museum in McMinnville, Oregon, including the core stages and parts of the solid rocket motor assembly.[23]
Launch history
Date / Time (UTC) |
Launch Site | S/N | Type | Payload | Outcome | Remarks |
---|---|---|---|---|---|---|
14 June 1989 13:18 |
CCAFS LC-41 | K-1 | 402A / IUS | USA-39 (DSP-14) | Success | |
8 June 1990 05:21 |
CCAFS LC-41 | K-4 | 405A | USA-60 (NOSS) USA-61 (NOSS) USA-62 (NOSS) USA-59 Satellite Launch Dispenser Communications (SLDCOM) |
Success | |
13 November 1990 00:37 |
CCAFS LC-41 | K-6 | 402A / IUS | USA-65 (DSP-15) | Success | |
8 March 1991 12:03 |
VAFB LC-4E | K-5 | 403A | USA-69 (Lacrosse) | Success | |
8 November 1991 07:07 |
VAFB LC-4E | K-8 | 403A | USA-74 (NOSS) USA-76 (NOSS) USA-77 (NOSS) USA-72 SLDCOM |
Success | |
28 November 1992 21:34 |
VAFB LC-4E | K-3 | 404A | USA-86 (KH-11) | Success | |
2 August 1993 19:59 |
VAFB LC-4E | K-11 | 403A | NOSS x3 SLDCOM |
Failure | SRM exploded at T+101s due to damage caused during maintenance on ground. |
7 February 1994 21:47 |
CCAFS LC-40 | K-10 | 401A / Centaur | USA-99 (Milstar-1) | Success | |
3 May 1994 15:55 |
CCAFS LC-41 | K-7 | 401A / Centaur | USA-103 (Trumpet) | Success | |
27 August 1994 08:58 |
CCAFS LC-41 | K-9 | 401A / Centaur | USA-105 (Mercury) | Success | |
22 December 1994 22:19 |
CCAFS LC-40 | K-14 | 402A / IUS | USA-107 (DSP-17) | Success | |
14 May 1995 13:45 |
CCAFS LC-40 | K-23 | 401A / Centaur | USA-110 (Orion) | Success | |
10 July 1995 12:38 |
CCAFS LC-41 | K-19 | 401A / Centaur | USA-112 (Trumpet) | Success | |
6 November 1995 05:15 |
CCAFS LC-40 | K-21 | 401A / Centaur | USA-115 (Milstar-2) | Success | |
5 December 1995 21:18 |
VAFB LC-4E | K-15 | 404A | USA-116 (KH-11) | Success | |
24 April 1996 23:37 |
CCAFS LC-41 | K-16 | 401A / Centaur | USA-118 (Mercury) | Success | |
12 May 1996 21:32 |
VAFB LC-4E | K-22 | 403A | USA-120 (NOSS) USA-121 (NOSS) USA-122 (NOSS) USA-119 (SLDCOM) USA-123 Tethers in Space Physics Satellite (TiPS) USA-124 (TiPS) |
Success | |
3 July 1996 00:30 |
CCAFS LC-40 | K-2 | 405A | USA-125 (SDS) | Success | |
20 December 1996 18:04 |
VAFB LC-4E | K-13 | 404A | USA-129 (KH-11) | Success | NROL-2 |
23 February 1997 20:20 |
CCAFS LC-40 | B-24 | 402B / IUS | USA-130 (DSP-18) | Success | |
15 October 1997 08:43 |
CCAFS LC-40 | B-33 | 401B / Centaur | Cassini Huygens |
Success | |
24 October 1997 02:32 |
VAFB LC-4E | A-18 | 403A | USA-133 (Lacrosse) | Success | NROL-3 |
8 November 1997 02:05 |
CCAFS LC-41 | A-17 | 401A / Centaur | USA-136 (Trumpet) | Success | NROL-4 |
9 May 1998 01:38 |
CCAFS LC-40 | B-25 | 401B / Centaur | USA-139 (Orion) | Success | NROL-6 |
12 August 1998 11:30 |
CCAFS LC-41 | A-20 | 401A / Centaur | NROL-7 (Mercury) | Failure | Guidance system short-circuited at T+40s due to frayed wire, vehicle lost control and destroyed by range safety. |
9 April 1999 17:01 |
CCAFS LC-41 | B-27 | 402B / IUS | USA-142 (DSP-19) | Failure | Spacecraft failed to separate from IUS stage. |
30 April 1999 16:30 |
CCAFS LC-40 | B-32 | 401B / Centaur | USA-143 (Milstar-3) | Failure | Centaur software database error caused loss of attitude control, insertion burns done incorrectly. Satellite deployed into useless orbit. |
22 May 1999 09:36 |
VAFB LC-4E | B-12 | 404B | USA-144 (Misty) | Success | NROL-8 |
8 May 2000 16:01 |
CCAFS LC-40 | B-29 | 402B / IUS | USA-149 (DSP-20) | Success | |
17 August 2000 23:45 |
VAFB LC-4E | B-28 | 403B | USA-152 (Lacrosse) | Success | NROL-11 |
27 February 2001 21:20 |
CCAFS LC-40 | B-41 | 401B / Centaur | USA-157 (Milstar-4) | Success | |
6 August 2001 07:28 |
CCAFS LC-40 | B-31 | 402B / IUS | USA-159 (DSP-21) | Success | |
5 October 2001 21:21 |
VAFB LC-4E | B-34 | 404B | USA-161 (KH-11) | Success | NROL-14 |
16 January 2002 00:30 |
CCAFS LC-40 | B-38 | 401B / Centaur | USA-164 (Milstar-5) | Success | |
8 April 2003 13:43 |
CCAFS LC-40 | B-35 | 401B / Centaur | USA-169 (Milstar-6) | Success | |
9 September 2003 04:29 |
CCAFS LC-40 | B-36 | 401B / Centaur | USA-171 (Orion) | Success | NROL-19 |
14 February 2004 18:50 |
CCAFS LC-40 | B-39 | 402B / IUS | USA-176 (DSP-22) | Success | |
30 April 2005 00:50 |
CCAFS LC-40 | B-30 | 405B | USA-182 (Lacrosse) | Success | NROL-16 |
19 October 2005 18:05 |
VAFB LC-4E | B-26 | 404B | USA-186 (KH-11) | Success | NROL-20 |
Launch failures
The Titan IV experienced four catastrophic launch failures.
1993 booster explosion
On August 2, 1993, Titan IV K-11 lifted from SLC-4E carrying a NOSS SIGNIT satellite. Unusually for DoD launches, the Air Force invited civilian press to cover the launch, which became more of a story than intended when the booster exploded 101 seconds after liftoff. Investigation found that one of the two SRMs had burned through, resulting in the destruction of the vehicle in a similar manner as the earlier 34D-9 failure. An investigation found that an improper repair job was the cause of the accident.[24]
After Titan 34D-9, extensive measures had been put in place to ensure proper SRM operating condition, including X-raying the motor segments during prelaunch checks. The SRMs that went onto K-11 had originally been shipped to Cape Canaveral, where X-rays revealed anomalies in the solid propellant mixture in one segment. The defective area was removed by a pie-shaped cut in the propellant block. However, most of CSD's qualified personnel had left the program by this point and so the repair crew in question did not know the proper procedure. After replacement, they neglected to seal the area where the cut in the propellant block had been made. Post repair X-rays were enough for CC personnel to disqualify the SRMs from flight, but the SRMs were then shipped to Vandenberg and approved anyway. The result was a near-repeat of 34D-9; a gap was left between the propellant and SRM casing and another burn-through occurred during launch.
1998 IV-A electrical failure
1998 saw the failure of Titan K-17 with a Navy ELINT Mercury (satellite) from Cape Canaveral around 40 seconds into the flight. K-17 was several years old and the last Titan IV-A to be launched. The post-accident investigation showed that the booster had dozens of damaged or chafed wires and should never have been launched in that operating condition, but the Air Force had put extreme pressure on launch crews to meet program deadlines. The Titan's fuselage was filled with numerous sharp metal protrusions that made it nearly impossible to install, adjust, or remove wiring without it getting damaged. Quality control at Lockheed's Denver plant, where Titan vehicles were assembled, was described as "awful".
The proximal cause of the failure was an electrical short that caused a momentary power dropout to the guidance computer at T+39 seconds. After power was restored, the computer sent a spurious pitch down and yaw to the right command. At T+40 seconds, the Titan was traveling at near supersonic speed and could not handle this action without suffering a structural failure. The sudden pitch downward and resulting aerodynamic stress caused one of the SRMs to separate. The ISDS (Inadvertent Separation Destruct System) automatically triggered, rupturing the SRM and taking the rest of the launch vehicle with it. At T+45 seconds, the Range Safety Officer sent the destruct command to ensure any remaining large pieces of the booster were broken up.[25]
An extensive recovery effort was launched, both to diagnose the cause of the accident and recover debris from the classified satellite. All of the debris from the Titan had impacted offshore, between three and five miles downrange, and at least 30% of the booster was recovered from the sea floor. Debris continued to wash ashore for days afterward, and the salvage operation continued until October 15.
The Air Force had pushed for a "launch on demand" program for DOD payloads, something that was almost impossible to pull off especially given the lengthy preparation and processing time needed for a Titan IV launch (at least 60 days). Shortly before retiring in 1994, General Chuck Horner referred to the Titan program as "a nightmare". The 1998-99 schedule had called for four launches in less than 12 months. The first of these was Titan K-25 which successfully orbited an Orion SIGNIT satellite on May 9, 1998. The second was the K-17 failure, and the third was the K-32 failure.
Stage failure to separate
After a delay caused by the investigation of the previous failure, the 9 April 1999 launch of K-32 carried a DSP early warning satellite. The IUS second stage failed to separate, leaving the payload in a useless orbit. Investigation into this failure found that wiring harnesses in the IUS had been wrapped too tightly with electrical tape so that a plug failed to disconnect properly and prevented the two IUS stages from separating.
Programming error
The fourth launch was K-26 on April 30, 1999, carrying a Milstar communications satellite. During the Centaur coast phase flight, the roll control thrusters fired open-loop until the RCS fuel was depleted, causing the upper stage and payload to rotate rapidly. On restart, the Centaur cartwheeled out of control and left its payload in a useless orbit. This failure was found to be the result of an incorrectly programmed equation in the guidance computer. The error caused the roll rate gyro data to be ignored by the flight computer.[26]
See also
- Comparison of heavy lift launch systems
- List of Titan launches, Titan I, II, III & IV
References
- 1 2 "Lockheed Martin's Last Titan IV Successfully Delivers National Security Payload to Space". October 19, 2005. Archived from the original on January 14, 2008.
- ↑ "USRM". www.astronautix.com. Archived from the original on December 27, 2016.
- ↑ "Space and Missile System Center Mission and Organization" (PDF). Space and Missile Systems Center's History Office. Archived from the original (PDF) on September 11, 2008. Retrieved September 20, 2008.
- ↑ "Titan 4B and Cape Canaveral". Space.com. Archived from the original on 2001-10-31. Retrieved 2008-05-21.
- ↑ "Spaceflight Now | Titan Launch Report | Titan 4 rocket expected to launch Lacrosse spy satellite". spaceflightnow.com.
- ↑ Nemiroff, R.; Bonnell, J., eds. (27 October 2005). "The Last Titan". Astronomy Picture of the Day. NASA. Retrieved 2008-09-20.
- ↑ Backlund, S. J.; Rossen, J. N. (December 1971). A STUDY OF PERFORMANCE AND COST IMPROVEMENT POTENTIAL OF THE 120-IN.- (3.05 M) DIAMETER SOLID ROCKET MOTOR (PDF) (Report). United Aircraft Corporation. Retrieved 26 February 2016.
- ↑ Study of Solid Rocket Motors for a Space Shuttle Booster (PDF) (Report). United Technology Center. 15 March 1972. Retrieved 26 February 2016.
- ↑ "UA1207". Astronautix. Archived from the original on 4 March 2016. Retrieved 26 February 2016.
- ↑ "Titan 4B". www.astronautix.com. Archived from the original on December 27, 2016.
- ↑ Michael Timothy Dunn (Dec 1992). "Analysis of Titan IV launch responsiveness" (PDF). Air Force Institute of Technology. Archived (PDF) from the original on October 9, 2012. Retrieved 2011-07-08.
- ↑ States, Air Force, United (26 February 1990). "TITAN IV - SOLID ROCKET MOTOR UPGRADE PROGRAM AT VANDENBURG". ceqanet.opr.ca.gov.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ Chalhoub, Michel S., (1990) "Dynamic Analysis, Design, and Execution of a Full Scale SRMU Test Stand," Parsons Engineering Report No. 027-90
- ↑ "Early Lunar Access". www.astronautix.com. Archived from the original on August 20, 2016.
- ↑ "Super Lightweight External Tank" (PDF). NASA.gov. Retrieved November 3, 2022.
- 1 2 3 "Encyclopedia Astronautica Index: T". www.astronautix.com. Archived from the original on July 10, 2016.
- 1 2 Day, Dwayne A. "The spooks and the turkey" The Space Review, 20 November 2006.
- ↑ Eleazer, Wayne (2020-07-06). "National spaceports: the past". The Space Review. Retrieved 2020-07-07.
- ↑ "Titan IV". USAF Air University. 1996.
- ↑ Kingsbury, Nancy R. (September 1991). "TITAN IV LAUNCH VEHICLE --- Restructured Program Could Reduce Fiscal Year 1992 Funding Needs" (PDF). US General Accounting Office.
- ↑ "National Museum of the U.S. Air Force fourth building now open". National Museum of the United States Air Force™. 7 June 2016.
- ↑ "Titan Missile Program". Wings over the Rockies Museum.
- ↑ "Titan IV Solid Rocket Motors Destroyed". www.spacearchive.info.
- ↑ "Titan 403A". www.astronautix.com. Archived from the original on December 28, 2016.
- ↑ "Titan Centaur 401A". www.astronautix.com. Archived from the original on 3 March 2016.
- ↑ Leveson, Nancy G., Ph.D. (September 10–14, 2001). "The Role of Software in Recent Aerospace Accidents" (PDF). sunnyday.mit.edu. 19th International System Safety Conference. Retrieved 19 April 2020.
{{cite web}}
: CS1 maint: multiple names: authors list (link)