National Highway 230 (NH 230), also known as Kisan Path or Lucknow outer ring road is a National Highway in Uttar Pradesh, India.[1] The Lucknow outer ring road is an 8-lane (4 each side) wide and 104 km long under-construction road project. The 11 km long Ayodhya road to Sultanpur road (Kisan Path) has already been constructed by the Uttar Pradesh PWD.

Construction

The NHAI has divided the construction work of Lucknow outer ring road (NH-230) under 2 Phases into multiple packages.[2]

  • Phase-1

The first phase includes the development from Bakshi Ka Talab (BKT) to Asti Road, Sultanpur Road, Behta Road, Sitapur Road, Kursi Road, Ayodhya Road, Indira Canal, Mohanlalganj and Kanpur Road via Bani.

Sr. No. Package Length in km Contractor
1. Sultanpur road to Behta road 31.75 PNC Infratech
2. Behta road to Sitapur road 32.89
3A. Sitapur road to Kursi road 14.62 DRA Infracon
3B. Kursi road to Faizabad road 14.70
  • Phase-2

In the second phase, construction is being carried out from Bani on Kanpur Road to BKT via Mohan and Kakori Road.

Status updates

  • Mar 2019: 15 km of the road project was completed and inaugurated.
  • May 2020: Work on rest of road project progressing. [3]
  • Oct 2020: Outer ring road to be ready by December 2021.[4]
  • Oct 2021: work on remaining 76 kms of outer ring road is progressing and is expected to be completed by June 2022.
  • Feb 2022: After six months the ring road is ready, the work is going on very fast. Earthworks from Agra Expressway to Hardoi Road have almost been completed.[5]

See also

References

  1. "Rationalisation of Numbering Systems of National Highways" (PDF). New Delhi: Department of Road Transport and Highways. Archived from the original (PDF) on 1 February 2016. Retrieved 3 April 2012.
  2. "लखनऊ आउटर रिंग रोड कब होगा शुरू, कहां तक पहुंचा काम, एक क्लिक पर जानिए सारी डिटेल". Navbharat Times. 20 February 2023.
  3. "आउटर रिंग रोड: सुल्तानपुर रोड से कानपुर रोड का काम शुरू".
  4. "Lucknow: 'Outer ring road to be ready by December next year' | Lucknow News - Times of India". The Times of India.
  5. "आउटर रिंग रोड: आगरा एक्सप्रेस-वे व काकोरी के पास फ्लाईओवर बनाने का काम शुरू".


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.