Red Line
(Line 1)
Red Line
Overview
StatusOperational
OwnerDMRC
LocaleDelhi and Ghaziabad
Termini
Stations29
Service
TypeRapid Transit
SystemDelhi Metro
Operator(s)Delhi Metro Rail Corporation
Daily ridership374,516[1]
History
Opened
Technical
Line length34.55 km (21.47 mi)
CharacterAt-grade and Elevated
Track gauge1,676 mm (5 ft 6 in) broad gauge
Electrification25 kV 50 Hz AC overhead catenary
Route map

Shaheed Sthal
Hindon River
Arthala
Mohan Nagar
Shyam Park
Major Mohit Sharma Rajendra Nagar
Raj Bagh
Shaheed Nagar
Dilshad Garden
Jhilmil
Mansarovar Park
Shahdara Junction
Shahdara
Swami Dayanand Marg
Welcome
Seelampur
Shastri Park
Kashmere Gate
Maharana Pratap Inter State Bus Terminus
Tis Hazari
Rani Jhansi Road
Pul Bangash
Subzi Mandi
Kishanganj
Pratap Nagar
Swami Narayan Marg
Shastri Nagar
Inderlok
Kanhaiya Nagar
Keshav Puram
Ring Road
Netaji Subhash Place
Kohat Enclave
Pitampura
Outer Ring Road
Rohini East
Rohini West
Rithala

The Red Line (Line 1) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India. It is an entirely elevated line and has 29 stations that runs from Rithala to Shaheed Sthal with a total distance of 34.55 km.[2] The Tis HazariShahdara section of this line was the first stretch of the Delhi Metro that was constructed and commissioned. The line connects the areas of Ghaziabad in Uttar Pradesh and the districts of Shahdara,[3][4] Central Delhi[5][6] and North West Delhi[7][8] in Delhi.

The Red Line has interchanges with the Yellow Line and Violet line at Kashmere Gate, the Pink Line at Welcome and Netaji Subhash Place, and the Green Line at Inderlok. It is the third most heavily used line of the Delhi Metro network as it acts as a link for those in West Delhi and North West Delhi traveling towards Central Delhi, Shahdara, East Delhi, and Ghaziabad, and vice versa.

History

Red Line
Phase Extension date Termini Length Stations
I 25 December 2002ShahdaraTis Hazari8.35 kilometers (5.19 mi)6
3 October 2003Tis HazariInderlok4.87 kilometers (3.03 mi)4
31 March 2004InderlokRithala8.84 kilometers (5.49 mi)8
II 4 June 2008ShahdaraDilshad Garden2.86 kilometers (1.78 mi)3
III 8 March 2019 Dilshad Garden Shaheed Sthal 9.63 kilometers (5.98 mi) 8
TotalShaheed SthalRithala34.55 kilometers (21.47 mi)29

Phase I & II

The Red Line was the first line of the Delhi Metro to be constructed and opened. The Tis Hazari – Shahdara section of the line was inaugurated by the then Prime Minister of India, Shri. Atal Bihari Vajpayee, on 25 December 2002 and opened to the public on the same day.[9] Subsequent sections opened between Tis Hazari – Inderlok on 3 October 2003, Inderlok – Rithala on 31 March 2004 and Shahdara – Dilshad Garden on 4 June 2008.[10]

Phase III

As part of the Phase III of Delhi Metro, an eastward extension of 9.5 km from Dilshad Garden to Ghaziabad ISBT (New Bus Adda) was approved by DMRC and MoHUA in January 2014. Construction began in early 2015 and commercial operations started on 8 March 2019, thereby providing commuters another link to travel to Ghaziabad along with the Blue Line branch that connects to Kaushambi and Vaishali.[11] In November 2022, Delhi Metro introduced a set of two eight-coach trains on its Red Line, which were converted from the existing fleet of 39 six-coach trains.[12]

Phase IV

Under the Phase IV of the Delhi Metro, the Red Line is proposed to be extended towards Kundli with 21 new stations at Rohini Sector 25, Rohini Sector 26, Rohini Sector 31, Rohini Sector 32, Rohini Sector 36, Barwala, Rohini Sector 35, Rohini Sector 34, Bawana Industrial Area – 1 Sector 3,4, Bawana Industrial Area – 1 Sector 1,2, Bawana JJ Colony, Sanoth, New Sanoth, Depot Station, Bhorgarh Village, Anaj Mandi Narela, Narela DDA Sports Complex, Narela, Narela Sector 5, Kundli and Nathupur. All these stations will be elevated, except Depot Station, which would be at-grade.[13][14]

List of stations

Delhi Metro currently has parking facilities Car parking at 20 metro stations of the Red line.[15]

Red Line
No. Station Name Phase Opening Interchange connection Station Layout Platform Level Type Depot Connection Depot Layout
English Hindi
1Shaheed Sthalशहीद स्थल 38 March 2019 Ghaziabad Elevated Side None None
2Hindon Riverहिंडन रिवर 38 March 2019None Elevated Side None None
3Arthala अर्थला 38 March 2019None Elevated Side None None
4Mohan Nagarमोहन नगर 38 March 2019None Elevated Side None None
5Shyam Parkश्याम पार्क 38 March 2019None Elevated Side None None
6Major Mohit Sharma Rajendra Nagarमे‌‌जर मोहित शर्मा राजेन्द्र नगर 38 March 2019None Elevated Side None None
7Raj Baghराज बाग़ 38 March 2019None Elevated Side None None
8Shaheed Nagarशहीद नगर 38 March 2019None Elevated Side None None
9Dilshad Gardenदिलशाद गार्डन 24 June 2008None Elevated Side None None
10Jhilmil Car parkingझिलमिल 24 June 2008None Elevated Side None None
11Mansarovar Park Car parkingमानसरोवर पार्क 24 June 2008None Elevated Side None None
12Shahdara Car parkingशाहदरा 125 December 2002Shahdara railway station At Grade Side None None
13Welcome Car parkingवेलकम 125 December 2002Pink Line At Grade Island None None
14Seelampur Car parkingसीलमपुर 125 December 2002None At Grade Island None None
15Shastri Park Car parkingशास्त्री पार्क 125 December 2002None At Grade Side Shastri Park Depot At Grade
16Kashmere Gate Car parkingकश्मीरी गेट 125 December 2002Yellow Line
Violet Line
Kashmere Gate ISBT
Elevated Side None None
17Tis Hazari Car parkingतीस हज़ारी 125 December 2002Sadar Bazar railway station Elevated Side None None
18Pul Bangashपुल बंगश 1 3 October 2003 Magenta Line
(Phase 4 - Under Construction)
Elevated Side None None
19Pratap Nagar Car parkingप्रताप नगर 13 October 2003Subzi Mandi railway station Elevated Side None None
20Shastri Nagar Car parkingशास्त्री नगर 13 October 2003Sarai Rohilla railway station Elevated Side None None
21Inderlok Car parkingइंद्रलोक 13 October 2003Green Line Elevated Side None None
22Tri Nagar Car parkingकन्हैया नगर 231 March 2004None Elevated Side None None
23Keshav Puram Car parkingकेशव पुरम 231 March 2004None Elevated Side None None
24Netaji Subhash Place Car parkingनेताजी सुभाष प्लेस 231 March 2004Pink Line Elevated Side None None
25Pitampura Car parkingकोहाट एन्क्लेव 231 March 2004None Elevated Side None None
26Madhuban Chowk Car parkingपीतमपुरा 231 March 2004Magenta Line
(Phase 4 - Under Construction)
Elevated Side None None
27Rohini East Car parkingरोहिणी पूर्व 231 March 2004None Elevated Side None None
28Rohini Westरोहिणी पश्चिम 231 March 2004None Elevated Side None None
29Rithala Car parkingरिठाला 231 March 2004None Elevated Side None None
30Rohini Sector 24 4plannedNone Elevated Side None None
31Rohini Sector 25 42028None Elevated Side None None
32Rohini Sector 31 42028None Elevated Side None None
33Rohini Sector 37 42028None Elevated Side None None
34Rohini Sector 36 42028None Elevated Side None None
35Barwala 42028None Elevated Side None None
36Puth Khurd 42028None Elevated Side None None
37Bawana Industrial Area Sector 3,4 42028None Elevated Side None None
38Bawana Industrial Area Sector 1,2 42028None Elevated Side None None
39Bawana 42028None Elevated Side None None
40Bawana JJ Colony 42028None Elevated Side None None
41New Sanoth 42028None Elevated Side None None
42Bhorgarh 42028None Elevated Side None None
43DSIDC Industrial Area Narela 42028None Elevated Side None None
44Narela 42028None Elevated Side None None

Train Info

Red Line
Rakes Mitsubishi Hyundai Rotem BEML
Train Length 6
Train Gauge 5 ft 6 in (1,676 mm) broad gauge
Electrification 25 kV, 50 Hz AC through overhead catenary
OHE
Train's Maximum Speed 100 km/h
Train Operation Delhi Metro

See also

References

  1. "Delhi Metro seeks 916 new coaches to tackle overcrowding in trains - Times of India". Retrieved 24 October 2018.
  2. "Route map". delhimetroail.com. Delhi Metro Rail Corporation. Retrieved 23 August 2021.
  3. "Map: Shahdara district". dmshahdara.delhi.gov.in. DM Shahdara. Retrieved 25 April 2022.
  4. "Shahdara". google.com. Google Maps. Retrieved 25 April 2022.
  5. "Map: Central Delhi district". dccentral.delhigovt.nic.in. DM Central Delhi. Retrieved 25 April 2022.
  6. "Central Delhi". google.com. Google Maps. Retrieved 25 April 2022.
  7. "Map: North-West Delhi district". dmnorthwest.delhi.gov.in. DM North-West Delhi. Retrieved 25 April 2022.
  8. "North-West Delhi". google.com. Google Maps. Retrieved 25 April 2022.
  9. "Delhi Metro became a reality 15 years ago on December 25: A lookback at its journey". www.timesnownews.com. 25 December 2017. Retrieved 20 December 2023.
  10. "Metro comes to Dilshad Garden". Hindustan Times. 3 June 2008. Retrieved 20 December 2023.
  11. "From Ghaziabad, Red Line begins a new journey". The Times of India. 10 March 2019. ISSN 0971-8257. Retrieved 20 December 2023.
  12. "Eight-coach trains introduced on Red line: Delhi Metro". The Times of India. 8 November 2022. ISSN 0971-8257. Retrieved 20 December 2023.
  13. "DMRC proposes to extend Delhi Metro's Red Line to Haryana's Kundli". Hindustan Times. 11 July 2023. Retrieved 20 December 2023.
  14. "DMRC proposes to expand Rithala – Narela corridor up to Haryana's Kundli – Details Inside". Financialexpress. 12 July 2023. Retrieved 20 December 2023.
  15. "Delhi Metro Rail Corporation Ltd. | ANNUAL REPORT". Delhimetrorail.com. Retrieved 24 October 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.