Haydarpaşa suburban
A westbound train at Göztepe
Overview
StatusDiscontinued
OwnerTurkish State Railways
LocaleIstanbul, Turkey
Termini
Stations28
Service
TypeCommuter rail
Operator(s)Turkish State Railways
Rolling stockE23000, E14000 EMUs
Daily ridership72,353 (2008)[1]
History
Opened8 March 1951[2]
Closed19 June 2013
Technical
Line length44.1 kilometers (27.4 mi)
Number of tracks2
Track gauge4 ft 8+12 in (1,435 mm)
Electrification25 kV AC
Operating speed40 km/h (25 mph) average
Route map

Distance
Station
0 km
Haydarpaşa
1.4 km (0.9 mi)
Söğütlüçeşme
2.5 km (1.6 mi)
Kızıltoprak
3.3 km (2.1 mi)
Feneryolu
5 km (3.1 mi)
Göztepe
6.2 km (3.9 mi)
Erenköy
7.7 km (4.8 mi)
Suadiye
9 km (5.6 mi)
Bostancı
10.6 km (6.6 mi)
Yenimahalle
11.9 km (7.4 mi)
İdealtepe
13.3 km (8.3 mi)
Ataköy
14.3 km (8.9 mi)
Maltepe
16.5 km (10.3 mi)
Cevizli
18.2 km (11.3 mi)
Atalar
20.1 km (12.5 mi)
Kartal
22.5 km (14.0 mi)
Yunus
24.4 km (15.2 mi)
Pendik
27.3 km (17.0 mi)
Kaynarca
28.3 km (17.6 mi)
Tersana
29.5 km (18.3 mi)
Cankurtaran
30.6 km (19.0 mi)
Aydıntepe
31.8 km (19.8 mi)
İçme
34.3 km (21.3 mi)
Tuzla
36.8 km (22.9 mi)
Coşkunoğulları
38 km (24 mi)
Çayırova
39.2 km (24 mi)
Fatih
40.6 km (25 mi)
Osmangazi
44.1 km (27 mi)
Gebze

The Haydarpaşa suburban (Turkish: Haydarpaşa banliyösü), also known as the Haydarpaşa-Gebze line (Turkish: Haydarpaşa-Gebze hattı) and numbered as B2, was a commuter rail line operated by the Turkish State Railways, between Haydarpaşa Terminal in Kadıköy to Gebze. Since its opening in 1951, it was the busiest commuter rail line and busiest TCDD service in Turkey, until it was discontinued in 2013.

Electrified in 1969, the line was the second electrified commuter rail service in Turkey, after the Istanbul suburban, operating across the Bosphorus.

The route traversed the southern shore of Istanbul's Asian side, passing through important districts: Kadıköy, Maltepe, Kartal, Pendik and Tuzla. The line then crosses into the Kocaeli Province into Gebze, where it terminates. The State Railways has operated its regional service to Adapazarı and mainline service to Ankara on the line as well, making it one of the busiest rail lines in Turkey, in terms of passengers and number of trains.

History

A railway to Gebze was originally built by the Ottoman Empire in 1873, as part of the railway to İzmit. This line was at first built for the Sultan, but later served the heavy population along the northeastern shores of the Sea of Marmara. However, few trains ran on the line during the time when the government operated it. The Ottoman government soon sold the line to a private enterprise, the Anatolian Railway (CFOA). The CFOA started regular train service between Istanbul and İzmit (as well as Gebze) in the 1890s.[3] Service was suspended from 1914 to 1919 during the First World War. After the Republic of Turkey was formed in 1923, the CFOA continued to operate commuter service until 1927, when the Turkish State Railways acquired the CFOA. The newly formed State Railways (TCDD) continued the commuter service formerly provided by the CFOA.

After World War II, new locomotives and railcars were delivered to Turkey and used on the line. In 1962, new E8000 EMUs were ordered as part of TCDD's plans to upgrade the line. In the following years, the tracks were doubled and electrified, and the stations were all renovated. Beginning in late 1968, these EMUs started test runs on the line. On 29 May 1969 increased commuter service with the new EMUs began operation.[4] In 1971, new E40000 electric locomotives started to operate on the line. In 1972, E14000 EMUs were introduced, and the E40000 were put on regional service between Istanbul and Adapazarı. The route however deteriorated for the next three decades and during the mid-2000s, the EMUs were in bad shape and the tracks were in need of repair.

In 2003, the Marmaray project started construction of a tunnel underneath the Bosphorus, as well as the upgrade to this line. Plans were finalized, and the line was first partially closed between Gebze and Pendik, with the whole line closed as of 19 June 2013 for at least 2 years. The planned reopening in June 2015 was delayed until March 2019 when the line went back into service despite protests from the unions that final tests had not yet been completed.[5]

References

  1. TCDD 2006–2010 Statistics – Page 70
  2. TCDD Historytrainsofturkey.com
  3. CFOA Historytrainsofturkey.com
  4. Ergin Tonuk Archived 22 August 2011 at the Wayback Machine – Haydarpaşa tecrübe seferleri
  5. Gebze – Halkalı banliyö hattı ne zaman açılacak – sozcu.com.tr
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.