Type 956A destroyer | |
History | |
---|---|
China | |
Name |
|
Namesake | |
Builder | Severnaya Verf, Saint Petersburg |
Laid down | 22 April 1989 |
Launched | 16 April 1999 |
Commissioned | 20 November 2000 |
Renamed |
|
Homeport | Zhoushan |
Identification | Pennant number: 137 |
Status | Active |
General characteristics | |
Class and type | Type 956E destroyer |
Displacement | 6,600 tons standard, 8,480 tons full load |
Length | 156 m (511 ft 10 in) |
Beam | 17.3 m (56 ft 9 in) |
Draught | 6.5 m (21 ft 4 in) |
Propulsion | 2 shaft steam turbines, 4 boilers, 75,000 kW (100,000 hp), 2 fixed propellers, 2 turbo generators, and 2 diesel generators |
Speed | 32.7 knots (60.6 km/h; 37.6 mph) |
Range |
|
Complement | 350 |
Sensors and processing systems |
|
Electronic warfare & decoys | 2 PK-2 decoy dispensers (200 rockets) |
Armament |
|
Aircraft carried | 1× Ka-27 series helicopter |
Aviation facilities | Helipad |
Fuzhou (137) is a Type 956E destroyer of the People's Liberation Army Navy.
Development and design
The project began in the late 1960s when it was becoming obvious to the Soviet Navy that naval guns still had an important role, particularly in support of amphibious landings, but existing gun cruisers and destroyers were showing their age. A new design was started, employing a new 130-millimetre (5.1 in) automatic gun turret.
The Type 956E destroyers were 156 metres (512 ft) in length, with a beam of 17.3 metres (56 ft 9 in) and a draught of 6.5 metres (21 ft 4 in).
The Chinese People's Liberation Army Navy Surface Force (PLAN) had two modified Sovremenny-class destroyers delivered in December 1999 and November 2000. In 2002, the PLAN ordered two improved versions designated 956-EM. The first vessel was launched in late 2005, while the second was launched in 2006. All four vessels were commissioned to the East Sea Fleet.
The project cost was 600 million US$ (mid-1990s price) for Project 956E (two ships), and 1.4 billion US$ (early-2000s price) for Project 956EM (two ships).[1][2]
Construction and career
Fuzhou was laid down on 22 April 1989 and launched on 16 April 1999 by Severnaya Verf in Saint Petersburg. She was commissioned on 20 November 2000.
References
- ↑ Novichkov, Nikolai; Chang, Yihong; Scott, Richard (8 January 2002). "China buys two more Project 956EM ships". Jane's Defence Weekly. Archived from the original on 6 February 2002.
- ↑ "Project 956 (Sovremenny Class) Missile Destroyer". SinoDefence. Archived from the original on 22 August 2006. Retrieved 22 August 2006.