#12 Butovskaya line Butovskaya line
An above-ground section of the line in March 2009
Overview
OwnerMoskovsky Metropoliten
LocaleMoscow
Termini
Stations7
Service
TypeRapid transit
SystemMoscow Metro
Operator(s)Moskovsky Metropoliten
Rolling stock81-740/741
81-740/741.1
81-740А/741А
81-740.4/741.4
Ridership17.70 million (2012)[1]
History
Opened27 December 2003
Technical
Line length10 kilometres (6.2 mi)
CharacterUnderground & Elevated
Track gauge1,520 mm (4 ft 11+2732 in)
ElectrificationThird rail
Route map

Bittsevsky Park
Transfer for #6 Kaluzhsko-Rizhskaya line at Novoyasenevskaya (Moscow Metro)
Lesoparkovaya
Ulitsa Starokachalovskaya
Transfer for #9 Serpukhovsko-Timiryazevskaya line at Bulvar Dmitriya Donskogo
connection to Line #9 Serpukhovsko-Timiryazevskaya line
Ulitsa Skobelevskaya
Bulvar Admirala Ushakova
Ulitsa Gorchakova
Buninskaya Alleya

The Butovskaya line (Russian: Бу́товская ли́ния, IPA: [ˈbutəfskəjə ˈlʲinʲɪjə]) is a line of the Moscow Metro.

The line was an experiment for building rapid-transit in areas where boring or excavation for Metro tunnels is considered expensive and impractical. Previously, attempts had been made to build lines at ground level, like the Filyovskaya line, but harsh Russian winters and the occupation of the large amount of useful land, make such projects impractical. Still, more and more districts emerging on the edge of the city, particularly beyond the Moscow Automobile Ring Road (MKAD), required some kind of rapid-transit connection.

In the late 1980s Moscow Metro design bureau, Metrogiprotrans started to develop a set of projects that would bring rapid-transit beyond MKAD, using a system of tracks raised above ground. Yuzhnoye Butovo District was the first district to be connected in such a way.[2]

The term light metro (Лёгкое метро́) was applied to these new projects, as it would feature a continuous elevated structure. Special rolling stock had to be developed to serve the line, as it would have to be resistant to the harsher climate elements and be able to negotiate sharper curves. For ease of operation, the light metro was integrated into the conventional metro service.[3]

The Butovskaya line essentially extends the Serpukhovsko-Timiryazevskaya line beyond the Serpukhovsky terminus. The 5.6 kilometres (3.5 mi) line was opened on 27 December 2003. The first 1.6 kilometres (0.99 mi) were bored in a tunnel, which allowed for a convenient transfer connection at the Bulvar Dmitriya Donskogo terminus. For the rest of its length it is elevated, with both single and double tracks protected by a sound barrier. Currently four elevated stations, each of identical design, are in operation. All of them except Ulitsa Starokachalovskaya have a lift for wheelchair users only.

Train at middle of line

The line interchanges with Line 9 at Ulitsa Starokachalovskaya and Line 6 at Bittsevsky Park.

Stations

Station Name Transfer
English Russian
Bittsevsky Park Битцевский парк Transfer for #6 Kaluzhsko-Rizhskaya line at Novoyasenevskaya Novoyasenevskaya
Lesoparkovaya Лесопарковая
Ulitsa Starokachalovskaya Улица Старокачаловская Transfer for #9 Serpukhovsko-Timiryazevskaya line at Bulvar Dmitriya Donskogo Bulvar Dmitriya Donskogo
Ulitsa Skobelevskaya Улица Скобелевская
Bulvar Admirala Ushakova Бульвар Адмирала Ушакова
Ulitsa Gorchakova Улица Горчакова
Buninskaya Alleya Бунинская аллея

Rolling stock

The line shares the Varshavskoe depot (No. 8) with the Serpukhovsko-Timiryazevskaya line. Specially built class 81-740/741 (Rusich) trains serve this line. These were designed for outdoor operation. A total of 12 three-car trains are currently assigned.

Recent developments and future plans

Linear map of Butovskaya line in 81-740/741 train in Moscow Metro
Southern terminus.
Flyover carrying the line.
Typical overground station

Although the light metro was indeed innovative, it also received its share of criticism from different social groups and the media, which could well affect its future.

The main problems arose from finances, as the design was originally planned to be cost-saving; however, the BLLM turned out to be more expensive than conventional Metro lines.[4] Passenger discomfort arose from shorter trains and larger intervals, but in particular from the transfer at Ulitsa Starokachalovskaya/Bulvar Dmitriya Donskogo, where the light metro station consists of two separated platforms on either side of the main line with no reversal sidings behind it. As a result, passengers must queue for lengthier times at a platform and also deal with exiting traffic before boarding their train. Additional problems arose from the landscape damage done by the flyover bridge.

Furthermore, costly and embarrassing improvements had to be made just a few months after opening. First, improvements had to be made to the faulty new trains, as they required immediate and unforeseen refits; in addition, despite the sound barriers, further noise reduction works had to be carried out on the tracks themselves by repairing their joints.

Despite the criticism, the Moscow Metro continues to put forward several expansion programs for the BLLM, the first one of which is to place proper reversal sidings north of the station thus separating the terminus platforms into northbound and southbound roles; at present this is announced for 2010. After the completion of that there was initially a planned northwestwards underground extension towards the terminus of the Kaluzhsko-Rizhskaya line, Novoyasenevskaya with two new stations: Lesoparkovaya and Bittsevsky Park, which opened on February 27, 2014. Since then Moscow Metro has postponed the project and even taken it off its list of primarily projects to be completed by 2015.[5]

Cancelled plans of line south extension

A further three-station expansion to the southeast, as Butovo continues to grow, is proposed: Ulitsa Staropotapovskaya, Ulitsa Ostafyevskaya and Novokuryanovo, along with a new depot. The latter's construction might prove pivotal as it would allow for the line to become more independent in operation. On the map of new plans, the extension to Milizeysky poselok (or East Sherbinka) is planned with at least two stations. A transfer at Buninskaya Alleya to the Sokolnicheskaya line is planned after 2023.

The problems with the Butovo line have also affected the prospect of other light metro lines in general as the second planned line, the Solntsevskaya light metro line, has now been canceled. Its construction was planned to begin in 2004, with the line expected to open in 2006, but after repeated postponements, Moscow Metro decided that it would be more practical to revert to an older project – a conventional, Kalininsko-Solntsevskaya line. After the SL's cancellation, there have been concerns that BL's fate could be much worse, as there are arguments that it would be more practical to disassemble the line and replace it with two-three station extension of the STL.

Despite the shortcomings, one positive aspect of the BL is that the 81-740/741 trains, serial production of the rolling stock, have gained wider usage and are now dominant on the Filyovskaya line, having replaced all of the older trains and is now growing its share of the Arbatsko-Pokrovskaya line.

See also

References

  1. Moscow Metro. 2012 annual report (PDF). p. 22. Archived from the original (PDF) on 2016-03-05. Retrieved 2015-04-07.
  2. "Московское метро | Строительство эстакадных линий легкого метро". metro.molot.ru. Archived from the original on 2004-01-16.
  3. "Московское метро | Легкое метро". metro.molot.ru. Archived from the original on 2003-03-20.
  4. "Московское метро | Бутовская линия". metro.molot.ru. Archived from the original on 2004-03-01.
  5. Перспективы развития (in Russian). Archived from the original on April 15, 2008. Retrieved June 12, 2008.
Template:Attached KML/Butovskaya Line
KML is from Wikidata
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.