Ajax | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | 100 Westney Road South Ajax, Ontario[1] Canada | ||||||||||
Coordinates | 43°50′52″N 79°02′29″W / 43.84778°N 79.04139°W | ||||||||||
Owned by | Metrolinx | ||||||||||
Platforms | 1 island platform | ||||||||||
Tracks | 2 | ||||||||||
Connections | |||||||||||
Construction | |||||||||||
Structure type | Station building with tunnel and elevator access to train platform | ||||||||||
Parking | 2,148 spaces[1][2] | ||||||||||
Bicycle facilities | Yes | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | GO Transit: AJ | ||||||||||
Fare zone | 92 | ||||||||||
History | |||||||||||
Opened | December 4, 1988 | ||||||||||
Passengers | |||||||||||
2018 | 907,000[3] | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Ajax Location within Southern Ontario |
Ajax GO Station is a train and bus station in the GO Transit network[1] located in Ajax, Ontario, Canada. It is a stop on the Lakeshore East line and on the Oshawa/Finch Express bus route.[4] The train platforms lie along the south side of Highway 401 with access to the station from Westney Road at Fairall Street.
A multi-level parking structure opened in 2013.[2]
Connecting bus service
The station is the Ajax hub for Durham Region Transit (DRT), with most routes timed to connect with GO Train services. DRT's West Operational Facility, originally built for Ajax Transit, is on the south side of the station.
- Durham Region Transit routes[5]
- 216 to Taunton Road via Harwood Avenue
- 216C to Audley Road via Harwood Avenue
- 224 to Harwood/Taunton via Salem Road
- PULSE 915 to Harmony Terminal via Westney Road/Taunton Road
- 917 to Pickering Parkway Terminal (west) & Oshawa Centre Terminal (east)
- GO Transit routes
- 90 - Oshawa/Union Station Bus Terminal (early morning/late night bus)
- 96 - Oshawa/Finch Express Bus[4]
References
- 1 2 3 "Ajax GO Station Information". GO Transit. Retrieved February 20, 2019.
- 1 2 "Ajax Parking Structure, The Project". GO Transit. Archived from the original on 24 March 2014. Retrieved 22 January 2017.
All 1,300 parking spaces inside the structure are now open to GO customers
- ↑ "Drivers of Ridership and Revenue" (PDF). Metrolinx. 2019-02-07. p. 4. Retrieved 2019-01-31.
- 1 2 "96 Oshawa/Finch Express GO Bus Schedule" (PDF). Archived from the original (PDF) on 2015-07-23. Retrieved 2015-05-18.
- ↑ "System Map". www.durhamregiontransit.com. 2022-03-30. Retrieved 2022-04-02.
External links
- Media related to Ajax GO Station at Wikimedia Commons
- Ajax GO Station construction at GO Transit
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.