Airport
Future O-Train station
General information
Coordinates45°19′25.3″N 75°40′07.1″W / 45.323694°N 75.668639°W / 45.323694; -75.668639
Owned byOC Transpo
PlatformsSingle platform
Tracks1
Construction
Structure typeElevated
AccessibleYes
History
Opening2024 (2024)
Services
Preceding station OC Transpo Following station
Terminus Route 97 South Keys
toward Hurdman
Future services
Preceding station OC Transpo Following station
Terminus Line 4
Opens 2024
Uplands
toward South Keys
Location

Airport (French: Aéroport) is an under construction O-Train rapid transit station. It will be located at the Ottawa Macdonald–Cartier International Airport in the south end of Ottawa. Estimated for completion in 2024, it will serve as the southern terminus of the three-stop Line 4.[1] The airport is currently served by an OC Transpo bus stop.

Service

Route 97 is the only bus that services this stop. It is the southern terminus for this route. From Airport station, Route 97 continues northward and terminates at Hurdman station on the O-Train Confederation Line. After Fall 2023, Route 97 service to/from this station will be replaced by Line 4 train service to/from Greenboro station. R4 service will replace the bus route if Line 4 is delayed or out of service during regular hours. This station along with Uplands station will receive new bus connections from Local Route 197 after the completion of Stage 2 LRT.[2]

At Hurdman, trains travel west to downtown Ottawa and east to Tremblay station (adjacent to Via Rail Ottawa station) before ending at the Blair station terminus. [3]

References

  1. "Contract Award of Ottawa's Stage 2 Light Rail Transit Projects and Related Matters" (PDF). 2019-02-22. p. 10. Retrieved 2019-09-01.
  2. "O-Train South Extension". OC Transpo. Retrieved July 20, 2022.
  3. "97 Airport - Hurdman" (PDF). OC Transpo. Retrieved October 9, 2019.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.