Australian Energy Market Operator
Founded2009
HeadquartersAustralia
Key people
  • Daniel Westerman (CEO)
Websitewww.aemo.com.au

The Australian Energy Market Operator (AEMO) performs an array of gas and electricity market, operational, development and planning functions. It manages the National Electricity Market (NEM), the Wholesale Electricity Market (WA) (WEM)[1] and the Victorian gas transmission network. AEMO also facilitates electricity and gas full retail contestability, overseeing these retail markets in eastern and southern Australia. It is additionally responsible for national transmission planning for electricity and the establishment of a Short Term Trading Market (STTM) for gas.[2]

It commenced operations on 1 July 2009,[3] superseding several state-based and cross-state organisations including the National Electricity Market Management Company Limited (NEMMCO), the Victorian Energy Networks Corporation (VENCorp) which was responsible for the efficient operation of gas and electricity industries in Victoria, the Electricity Supply Industry Planning Council (ESIPC) which was responsible for the effective operation of the electricity industry in South Australia, the South Australian operations of Retail Energy Market Company (REMCo)), Gas Market Company (GMC) and Gas Retail Market Operator (GRMO).

AEMO has several departments within such as Engineering and Design, Forecasting, National Planning, Operational forecasting, Markets and Strategies as well as administrative, safety, peopleculture and human resources departments. AEMO is the semi-governmental body that acts as the information source for the industry's and manufacturers outlook on the national electricity policies, forecast as well as future plans. The organisation is owned 60% by the Government and 40% by industry and market participants. AEMO has offices across the country in Melbourne, Brisbane, Sydney, Perth, Adelaide as well as a handful of regional offices.

History

In March 2017, AEMO sought to reassure the public that the closure of the Hazelwood Power Station, which has a capacity of 1600 megawatt, would be offset by the availability of three mothballed gas-fired stations, which have a combined capacity of 830 megawatts, and large industrial businesses agreeing to time-shift their electricity use in the event of an emergency. The addition capacity would be provided by the Pelican Point Power Station in South Australia, Tamar Valley Power Station in Tasmania and Swanbank Power Station in Queensland.[4]

In 2017, AGL Energy reaffirmed that it intends to close the Liddell Power Station in 2022.[5] The closure of this and other coal-burning power stations in Australia has led to the former Prime Minister of Australia, Malcolm Turnbull, to seek advice from AEMO on extending the life of a number of them,[6] to head off future power shortages.[7] Turnbull said the government had been advised that if the Liddell plant were to close in 2022, there would be a 1000MW gap in base load, dispatchable power generation.[6]

In May 2018, AEMO warned solar and wind projects in north-western Victoria of potential curtailment to their generation profiles. In particular, the 220kV transmission line that links Ballarat, Horsham, Red Cliffs, Kerang and Bendigo was the focus of their announcement. "If further development proceeds as suggested, this will add to the thermal constraints in this area", AEMO warns.[8]

In order to simplify operations of the electricity market, AEMO suspended the spot market for wholesale electricity across the country in June 2022.[9] That move came after AEMO issued warnings for possible power interruptions amid supply shortfalls and significant prices rises.[10]

In June 2023, AEMO sounded an alarm over the country's transition to renewable energy. Daniel Westerman was concerned that investment in renewables wasn't happening fast enough as two-thirds of coal-fired power stations were expected to shutdown by 2030.[11]

See also

References

  1. "Wholesale Electricity Market (WA)". Australian Energy Market Operator. Retrieved 27 November 2019.
  2. Ministerial Statement "Archived copy" (PDF). Archived from the original (PDF) on 18 March 2015. Retrieved 29 July 2015.{{cite web}}: CS1 maint: archived copy as title (link)
  3. AEMO Website "AEMO About AEMO". Archived from the original on 31 July 2009. Retrieved 11 July 2009.
  4. Morton, Adam (29 March 2017). "What we'll do to keep the lights on post Hazelwood: grid operator". The Age. Retrieved 2 October 2023.
  5. "AGL Energy statement on Liddell Power Station". AGL Energy. 6 September 2017. Retrieved 6 September 2017.
  6. 1 2 Osborne, Paul (6 September 2017). "Turnbull throws his weight behind coal power". InDaily. Retrieved 6 September 2017.
  7. Hannam, Peter (7 September 2017). "Liddell power plant operating below 40 per cent capacity, faces 'mammoth' woes". The Age. Retrieved 2 October 2023.
  8. Parkinson, Giles (7 May 2018). "Victoria wind and solar farms warned of curtailment". RenewEconomy. Retrieved 7 April 2019.
  9. Clarke, Melissa; McElroy, Nicholas. "Australian Energy Market Operator suspends spot market for wholesale electricity to ensure reliability and avoid blackouts". ABC News. Retrieved 25 November 2023.
  10. "Power uncertainty hits multiple states as AEMO makes moves to cover shortfalls". ABC News. 14 June 2022. Retrieved 25 November 2023.
  11. Hannam, Peter (20 June 2023). "Australia's transition away from fossil fuels 'not fast enough' as wind and solar investment lags". The Guardian. Retrieved 25 November 2023.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.