Introduction
Tools
-
-
Shell
-
Base
-
Heater element -Nickel chrome wire
-
Switch assembly - ABS injection moulding
-
Circuit board
-
Wires
-
Screws
-
One comment
Errors:
Step 1. There are 18 screws. The 4 corner screws hold in the feet. The feet must be removed to reveal 4 more screws under each rubber foot.
Step 2. The green earth wire is welded onto the cover, but can be unscrewed at the toaster end rather than cutting the wire.
MrMilf -